Sub topic 4
Trims, Labels and Packaging
Prerequisites
This chapter assumes you can read a basic BOM (a list of lines with item, quantity and price) and do percentage arithmetic. You should also know the common closures and finishes on a garment, such as zips, buttons and drawcords. Fabric consumption was covered in the previous chapter. Wastage and supplier pricing get their own chapters later, so this chapter only marks where they plug in.
Why small items need careful costing
On a simple garment, trims, labels and packaging may add up to well under a dollar. That is still a real share of material cost on a low-priced style, and these lines cause a disproportionate number of costing errors. A missed hangtag or a mis-converted thread price is easy to overlook because each line looks tiny. Across 20,000 units, a 0.10 error per garment is 2,000 in unplanned cost.
The usual mistake is an incomplete list. Fabric is obvious on a tech pack. A care label sewn into a side seam, a polybag sticker or a carton divider is not drawn anywhere, so it never reaches the cost sheet unless the BOM captures it.
The three groups of non-fabric items
| Group | What it covers | Typical examples |
|---|---|---|
| Trims | Items that are sewn on or in, and that work or decorate | Zips, buttons, snaps, rivets, thread, interlining, elastic, drawcords, lace, shoulder pads |
| Labels | Items that identify the brand, size, content and care | Main (brand) label, size label, care and content label, country-of-origin label, hangtag, price ticket |
| Packaging | Items that protect and present the garment | Polybag, tissue, hanger, collar insert, sticker, inner pack, shipping carton |
Some pipelines split trims into functional trims (needed for the garment to work, such as a zip) and decorative trims (added for look, such as a contrast tape). The split matters for cost reduction later, because decorative trims are usually easier to change than functional ones.
Specifying a trim so it can be priced
A trim line is only useful if two people reading it would buy the same item. For each line, record:
- A description with the dimensions that change price: zip length and type, button size and material, elastic width.
- A supplier and article code, if the item is a standard catalogue item.
- Colour, or "to match" with a reference to the fabric colourway.
- Placement, such as "centre front" or "inside back neck", so quantity can be checked against the drawing.
- Quantity per garment and its unit of measure.
- Unit price and the unit it applies to.
- Minimum order quantity (MOQ), if one applies.
Button size is a common source of confusion. Buttons are commonly sized in lignes (often written 20L), and the same number is not the same as a diameter in millimetres. Write both when you can, so a supplier does not guess.
Units of measure: the main source of error
Fabric is bought by the metre, but many trims are bought in a different unit from the one used on the garment. A BOM line should state quantity per garment in the unit the garment uses, and the cost step must convert the purchase price into that unit.
| Item | Used on garment | Bought as | Conversion needed |
|---|---|---|---|
| Zip | 1 piece | Per piece | None |
| Button | 4 pieces | Per piece, or per gross (144) | Divide gross price by 144 |
| Thread | About 120 m | Per cone of 5,000 m | Price per cone divided by 5,000 |
| Elastic | 0.8 m | Per metre | None |
| Shipping carton | 1 share of a carton | Per carton | Divide by garments per carton |
Thread is the standard example. The garment uses metres, the supplier sells cones, and the cost per garment is metres used times cone price divided by metres per cone. Estimate thread use from total seam length and a stitch-type multiplier. Many factories keep a rule of thumb per garment type, so ask yours before inventing one.
Packaging has a similar trap. A carton is shared by many garments, so its cost is allocated per garment as the carton price divided by garments per carton. If the pack changes from 24 to 20 garments per carton, the allocated cost rises even though the carton did not change.
Labels: content, legal requirements and cost
Labels carry more than branding. The care and content label states fibre composition, care instructions and, in many markets, the country of origin. Requirements differ by destination market and change over time, so treat any rule stated in a tutorial as a prompt to check, not as the rule. Confirm the current requirements for each market with your compliance contact or the importer before finalising the label spec.
Cost drivers for labels include:
- Construction: woven labels generally cost more than printed ones, and satin or taffeta print labels sit in between.
- Size and number of colours, or thread colours in a woven label.
- Setup and artwork charges, which are often one-off and not part of the unit price.
- Folding style, such as end-fold or centre-fold, which changes the material used.
- Quantity breaks: unit price falls as order quantity rises.
Labels are also where MOQs bite hardest. If a woven label has an MOQ of 3,000 and your order is 1,200 garments, you pay for 3,000 or negotiate a stock label. The cost per garment on a single order is then the full label charge divided by 1,200, not the quoted unit price. The next chapter-level topic on supplier pricing covers MOQs in detail. For now, flag any trim whose MOQ exceeds the order quantity so the cost sheet does not understate it.
A hangtag is a label that is not sewn in. It is often counted with labels because the brand team owns it, but some companies place it under packaging. Pick one convention and apply it to every style so subtotals stay comparable between styles.
Packaging levels
It helps to think of packaging in levels:
- Primary: touches the garment, such as a polybag, tissue or collar insert.
- Secondary: groups garments, such as an inner pack of 6.
- Shipping: the master carton, with its tape, dividers and carton marks.
- Presentation: hangers, sizers and stickers, which matter when the retailer asks for floor-ready goods.
Retailers often send packing instructions that add lines to the BOM, such as a hanger of a given type or a barcode sticker on the polybag. Read those instructions at costing time, not at shipping time, because they can change cost after the price is agreed.
Putting it into a calculation
The script below converts each non-fabric line to cost per garment and subtotals it by group. The zip and button prices match the earlier cost sheet example. Wastage here is a simple per-line fraction. The wastage chapter treats it properly.
# (item, group, qty per garment, purchase price, garment-units per purchase unit, wastage)
lines = [
("Zip, 18 cm", "trim", 1, 0.40, 1, 0.02),
("Button, 20L", "trim", 1, 0.15, 1, 0.02),
("Thread (metres)", "trim", 120, 2.50, 5000, 0.05), # cone of 5,000 m
("Main label", "label", 1, 0.08, 1, 0.03),
("Care label", "label", 1, 0.03, 1, 0.03),
("Hangtag", "label", 1, 0.06, 1, 0.03),
("Polybag", "packaging", 1, 0.04, 1, 0.02),
("Carton (24 per ctn)", "packaging", 1, 1.20, 24, 0.00),
]
subtotals = {}
for item, group, qty, price, per_unit, wastage in lines:
cost = qty * (1 + wastage) * price / per_unit
subtotals[group] = subtotals.get(group, 0.0) + cost
for group, cost in subtotals.items():
print(f"{group:<10} {cost:6.3f}")
print(f"{'total':<10} {sum(subtotals.values()):6.3f}")Expected output:
trim 0.624
label 0.175
packaging 0.091
total 0.890The thread line is the one to check by hand: 120 m times 1.05 times 2.50, divided by 5,000, gives 0.063. The carton line shows allocation: 1.20 divided by 24 is 0.05 per garment.
Common errors
- Wrong unit of measure. Pricing thread per cone as if it were per garment, or a gross of buttons as if it were each.
- Missing quantities. A shirt has several buttons plus a spare. A spare button on a hangtag string is a real cost, and so is the poly bag it sits in.
- Ignoring the MOQ. The cost sheet shows the quoted unit price while the order has to buy a larger minimum. Excess stock is cost that someone pays.
- Leaving out one-off charges. Label artwork, zip puller moulds and custom button tooling are usually quoted separately. Spread them over expected units, or record them as a separate non-recurring line.
- Forgetting colour dependence. Zips, thread and buttons often change with colourway, and so does their price. Variants are covered in a later chapter.
- Carrying over a retailer's packing spec incorrectly. A change from folded to hanging packing adds a hanger and often a larger carton.
Checking your BOM
Before you pass a BOM on for costing, walk the garment from the inside out and then from the outside in. Inside out: every closure, every reinforcement, every label sewn in. Outside in: every tag, bag, sticker and carton. Compare the result with the tech pack drawing and with the retailer's packing instructions. A missing item at this stage costs nothing to fix. A missing item found at shipping usually costs a lot more.
Exercise
A style uses one polybag at 0.05 each (assume no wastage) and shares a shipping carton priced at 1.80 that holds 30 garments. Thread use is 90 m per garment, bought on 3,000 m cones priced at 2.10, with 5% wastage on thread. What is the combined cost per garment of the polybag, carton share and thread?
Show answer
Polybag: 0.05. Carton share: 1.80 / 30 = 0.06. Thread: 90 x 1.05 x 2.10 / 3,000 = 0.06615. Total = 0.05 + 0.06 + 0.06615 = 0.17615, about 0.176 per garment.
Exercise
A woven main label costs 0.08 each but has an MOQ of 3,000. The order is for 1,200 garments, and the supplier will not split the run. Ignoring wastage, what is the label cost per garment for this order, and what should you do on the cost sheet?
Show answer
You pay for 3,000 labels: 3,000 x 0.08 = 240. Divided over 1,200 garments, the cost is 0.20 per garment, not 0.08. Record the MOQ on the BOM line and use 0.20 for this order. If the leftover labels can be used on a later order, you may be able to spread the cost, but state that assumption on the cost sheet.