Sub topic 12
Revisions and change control
This chapter assumes you can read a garment BOM (fabric, trim, label and packaging lines with quantities and units) and that you have built a cost sheet from one. Here you will learn how to change a BOM without losing track of what the factory is making or what it costs.
Why a BOM needs revisions
A BOM is not finished when you write it. During development, the first sample reveals that the pocketing is too thin. The supplier raises a yarn price. Merchandising asks for a metal zip. The buyer wants a hang tag. Each of these edits changes the material list and therefore the cost.
If the BOM is edited in place with no record, three problems follow:
- The factory builds from the wrong list. The mill orders the old zip while the pattern room uses the new one.
- Cost sheets drift away from the BOM. The price quoted to the retailer reflects a list that no longer exists.
- Nobody can explain a margin loss. When the final cost is higher than quoted, there is no trail showing which change caused it.
Change control is the discipline that prevents this. It gives every BOM state a version, every edit a reason and an owner, and every approved change a known cost effect.
Revision numbering
Most teams label each saved state of the BOM with a revision identifier. The scheme matters less than using it consistently and showing it on every document that depends on the BOM.
| Convention | Example | Typical use |
|---|---|---|
| Letters | Rev A, Rev B, Rev C | Simple, common in tech packs |
| Numbers | v1, v2, v3 | Spreadsheets and PLM (product lifecycle management) systems |
| Major.minor | v2.1 | Major for approved stages, minor for working edits |
| Stage prefix | Proto-1, SMS-2, PP-1 | Tied to sample stage (prototype, salesman sample, pre-production) |
Whatever you choose, apply these rules:
- Never overwrite a released revision. Save a new one. The old revision remains as the record of what a past sample or order was built from.
- Put the revision on the BOM, the tech pack and the cost sheet. A cost sheet should state "costed from BOM Rev B".
- Keep one current revision per style. Several "latest" copies by email are the most common cause of wrong material orders.
The revision record
Each revision carries a short record in a change log. A useful log entry holds the following:
| Field | Purpose |
|---|---|
| Revision ID | Identifies the BOM state |
| Date | When the change was made |
| Requested by | Who asked for it (design, merchandising, buyer, factory) |
| Reason | Fit failure, price change, availability, quality, cost reduction |
| Lines affected | Which BOM lines were added, removed or changed |
| Cost impact | Change in material cost per garment, and in FOB or landed cost |
| Approver | Who accepted the change |
| Status | Draft, proposed, approved, released or superseded |
The "Reason" and "Cost impact" fields are the ones teams skip, and they are the ones you need later. A reason lets you distinguish a change you chose (a better zip) from one forced on you (a mill discontinued the fabric). A cost impact lets you decide whether the change was worth it.
Revision states
A revision moves through states. Only a released revision should drive purchasing and production.
The "Costed" step is the one that separates change control from simple version saving. A change should not be approved until someone has calculated what it does to cost.
Calculating the cost impact of a change
The cost impact is the difference between two revisions, computed line by line. The line formula is the one used in earlier chapters: quantity times (1 + wastage) times unit price.
Compare Rev A and Rev B of a trouser style. Between them:
- The twill price rose from 6.00 to 6.40 per metre.
- The pocketing line was removed, because the pocket bag is now cut from the main fabric.
- The zip changed to a metal zip at 0.55 instead of 0.40.
- A hang tag was added at 0.10 with no wastage.
The following script compares two BOMs and reports each difference.
# Each BOM maps item -> (unit, quantity per garment, wastage fraction, unit price)
rev_a = {
"Cotton twill": ("m", 1.40, 0.05, 6.00),
"Pocketing": ("m", 0.25, 0.03, 2.00),
"Zip": ("pc", 1, 0.02, 0.40),
"Button": ("pc", 1, 0.02, 0.15),
}
rev_b = {
"Cotton twill": ("m", 1.40, 0.05, 6.40),
"Zip": ("pc", 1, 0.02, 0.55),
"Button": ("pc", 1, 0.02, 0.15),
"Hang tag": ("pc", 1, 0.00, 0.10),
}
def line_cost(line):
_unit, qty, wastage, price = line
return qty * (1 + wastage) * price
def total(bom):
return sum(line_cost(line) for line in bom.values())
def diff(old, new):
rows = []
for item in sorted(set(old) | set(new)):
old_cost = line_cost(old[item]) if item in old else 0.0
new_cost = line_cost(new[item]) if item in new else 0.0
if item not in old:
status = "added"
elif item not in new:
status = "removed"
elif old[item] != new[item]:
status = "changed"
else:
continue # identical line, nothing to report
rows.append((item, status, new_cost - old_cost))
return rows
for item, status, delta in diff(rev_a, rev_b):
print(f"{item:<14} {status:<8} {delta:+.3f}")
print(f"Rev A {total(rev_a):.3f} Rev B {total(rev_b):.3f} "
f"change {total(rev_b) - total(rev_a):+.3f}")The material cost moves from 9.896 to 10.222, an increase of 0.326 per garment. The price rise on the twill (+0.588) is partly offset by dropping the pocketing (−0.515). The zip adds 0.153 and the hang tag adds 0.100.
Notice that the diff compares lines by item name. If someone renames "Zip" to "YKK zip" between revisions, a name-based comparison reports one removal and one addition. In a real system, give each BOM line a stable ID so a rename is seen as an edit.
Carrying the impact through to price
A material change does not stop at the BOM. It flows through every later calculation. Using the assumptions from the landed-cost chapter (12% duty and 5% overhead, both applied to FOB, and a 50% margin on wholesale price with a 2x retail markup), the 0.326 increase becomes:
| Stage | Calculation | Change per garment |
|---|---|---|
| Material cost | Rev B minus Rev A | +0.326 |
| Landed cost | 0.326 × (1 + 0.12 + 0.05) | +0.381 |
| Wholesale price | 0.381 ÷ (1 − 0.50) | +0.763 |
| Retail price | 0.763 × 2 | +1.526 |
A cost change of about 33 cents becomes a retail change of about 1.53. Freight is a flat amount per garment in this model, so it does not change. This leverage is why small trim edits deserve costing before approval. It also explains why a hang tag added late, "just 10 cents", is not free.
If the retail price is already fixed by the buyer, the increase comes out of margin instead. Change control lets you see that trade-off before you agree to the change.
Which changes need which response
Not all edits carry the same risk. A practical approach is to sort changes by what they touch.
| Type of change | Example | Typical consequences |
|---|---|---|
| Price only | Supplier raises fabric price | Cost sheet changes, BOM structure does not |
| Quantity or wastage | New marker gives better yield | Consumption and cost change, may need new fabric order |
| Substitution | Different zip or lining | Cost, lead time, possibly testing and approvals |
| Addition or removal | Add hang tag, drop pocketing | Cost, packaging, factory instructions |
| Construction | Add a lining or pocket | Consumption, CMT time and cost, sample re-approval |
| Supplier or origin | Move to a different mill | Cost, MOQ, lead time, duty and compliance |
Substitutions and supplier changes are the riskiest. They can alter lead time, minimum order quantities and the product's compliance status. A cost comparison alone does not show those effects.
Change control in practice
A workable process for a small team has five steps:
- Raise the change. Record what, why and who asked. Do not edit the released BOM yet.
- Create a draft revision. Copy the current BOM, apply the change, and increment the revision ID.
- Cost the difference. Compute the line-level and total effect, as in the script above. Extend it to landed cost and price when margin is at stake.
- Approve or reject. The approver sees the cost and the reason together. Record the decision.
- Release and communicate. Send the new revision to the factory and suppliers. Mark the previous one superseded. Confirm receipt, because a revision the factory has not opened has not been released in practice.
Common errors
- Editing the released file. The record of what past samples were built from is lost.
- Approving before costing. The cost surfaces at the invoice, when it is too late to negotiate.
- Updating the BOM but not the cost sheet. The two documents disagree, and the quote is wrong.
- Updating the cost sheet but not the tech pack. The factory builds the old specification at the new price.
- Unstable line identifiers. Renames look like removals plus additions, which makes the change history misleading.
- No link to colourways and sizes. A change to one colourway's trim can be missed on the others. State in the log which variants a revision covers.
Exercise
Rev C of a style changes the main fabric quantity from 1.40 m to 1.32 m after a better marker, with wastage of 5% and a price of 6.40 per metre. Nothing else changes. What is the material cost impact per garment, and what does the change log need to record besides the number?
Show answer
Rev B line cost is 1.40 × 1.05 × 6.40 = 9.408. Rev C line cost is 1.32 × 1.05 × 6.40 = 8.870 (rounded from 8.8704). The impact is about −0.538 per garment. The log should also record the revision ID, date, who requested the change (for example the pattern room or merchandiser), the reason (improved marker efficiency), the line affected (main fabric quantity), the approver, and the status. It should also note that the fabric order quantity may need to change.
Exercise
A supplier renames "Zip 5mm" to "Zip, metal, 5mm" in the new BOM revision, with no other change. A name-based diff reports one removal and one addition. What is the problem, and how do you avoid it?
Show answer
The diff overstates the change. It shows a removed line and an added line when the item is unchanged, which can look like a substitution and trigger unnecessary re-approval. Give each BOM line a stable ID that does not change on rename, and compare lines by ID so a rename appears as an edit to the description.