Sub topic 5
Adding wastage and allowances
This chapter assumes you can read a garment BOM (bill of materials) and know the difference between net consumption and the quantity you buy. It also assumes you are comfortable with percentages. The goal is to turn the net quantity of each BOM line into the gross quantity you actually order, without double counting and without leaving gaps.
Net quantity, gross quantity and why they differ
The net quantity is the material that ends up in one finished garment. The gross quantity is what you must buy to make that garment, once you account for everything lost or held back along the way.
Costing from net quantities understates cost. A style with 1.40 m of fabric per garment never costs exactly 1.40 m of cloth, because the factory loses some of it in cutting, defects and shrinkage. Every cost line that comes after this one (cost sheet, landed cost, margin) inherits any error made here.
The BOM from the previous chapters lists net quantities. This chapter adds a wastage allowance, which is the extra quantity bought to cover expected losses. It is written as a percentage of the net quantity.
Where material is lost
Losses fall into a few groups. Name them separately in your BOM notes so a reviewer can see what each percentage covers.
- Marker (cutting) waste. Pattern pieces never tile a fabric width perfectly. The gaps between pieces are lost. Marker efficiency measures this, and it is usually built into the consumption figure, not the wastage figure.
- Fabric defects. Weaving flaws, stains and holes are cut around. The affected cloth is discarded.
- Spreading and end losses. Layers of fabric are laid on the cutting table. Each layer loses a little at its ends, and the end of every roll leaves a short remnant that is too small to use.
- Shrinkage. Fabric that shrinks in washing or pressing must be cut larger. The shrinkage allowance is not waste in the sense of discarded cloth, but it still raises the quantity you need.
- Trim loss. Zips break, buttons crack during attachment, and thread is wasted when machines are threaded and rethreaded.
- Packaging loss. Polybags and cartons are damaged or miscounted during packing.
Typical allowance ranges
These ranges are illustrative starting points. Your factory, fabric and order size will move them. Replace them with figures from your own production history as soon as you have any.
| Material | Illustrative wastage | Main reason |
|---|---|---|
| Woven fabric (solid colour) | 3% to 5% | Defects, end-of-roll remnants |
| Printed or checked fabric | 6% to 10% | Pattern matching needs extra length |
| Knit fabric | 4% to 7% | Spreading tension, edge curl |
| Lining and pocketing | 2% to 4% | Defects, short cuts |
| Zips, buttons, snaps | 1% to 3% | Breakage and replacement |
| Thread | 5% to 10% | Machine set-up, thread breaks |
| Labels and hang tags | 2% to 5% | Misprints, attachment errors |
| Polybags and cartons | 1% to 3% | Damage, miscounts |
Directional prints and large checks sit at the top of the range because the cutter must align each piece to the design, which leaves bigger gaps.
Two ways to apply a percentage
The same "5% wastage" can mean two different things, and the difference matters.
- Percentage of net.
gross = net × (1 + w). This is the form used in the course code example. A 5% wastage on 1.40 m gives 1.47 m. - Percentage of gross.
gross = net ÷ (1 − w). Here 5% means that 5% of what you buy is lost. 1.40 m gives 1.474 m.
The two forms differ slightly at low percentages and noticeably at high ones. At 20%, the first gives a factor of 1.20 and the second gives 1.25. Pick one convention, write it at the top of your cost sheet and use it everywhere. The rest of this chapter applies wastage as a percentage of net, and applies shrinkage as a percentage of the gross cloth, as explained next.
Shrinkage works in the opposite direction
Suppose a fabric shrinks 3% in length. You want 1.40 m of finished length. If you cut 1.40 m of unshrunk cloth, the cut piece ends up at 1.358 m. To get 1.40 m after shrinkage, you must cut a longer piece:
cut length = finished length ÷ (1 − shrinkage)
Dividing by (1 − s) is correct here because the shrinkage is a share of the cut length, not of the finished length. Adding 3% to 1.40 m gives 1.442 m, which shrinks to 1.399 m. That is close, but the error grows with the shrinkage rate, so use the division form.
Combine the two effects in one formula:
gross = net × (1 + wastage) ÷ (1 − shrinkage)
Shrinkage is normally measured in both length and width. If the pattern is sensitive to width, as with a tightly fitted pattern on a narrow fabric, check the width shrinkage as well. For many garments, the larger of the two figures drives the allowance.
Allowances at the order level
Some allowances apply to the whole order, not to each garment.
- Sampling and testing yardage. Production needs extra cloth for lab tests, shade approval and any pre-production sample.
- Order tolerance. Garment orders often permit the factory to ship a few percent more or less than the agreed quantity. A mill may also deliver fabric within a stated tolerance. Cost your plan at the quantity you expect to pay for, and check what the purchase terms say.
- Rounding to buying units. You cannot buy 0.4 of a zip or half a cone of thread. Zips are bought in whole pieces, thread in cones, fabric in metres (or full rolls with a minimum), and cartons in whole units. Compute the total, then round up.
Because rounding happens on the total and not on each garment, always multiply by the number of units before you round. Rounding each garment's share up first would inflate the order.
A worked example
The script below applies the formula to the BOM from earlier in the tutorial. It assumes a 5% wastage on the cotton twill with 3% shrinkage, and sets the allowances for the other lines. It computes the gross quantity per garment, the cost per garment and the rounded order quantity for 2,000 garments.
import math
# Each line: (item, unit, net qty per garment, wastage fraction, shrinkage fraction, unit price)
bom = [
("Cotton twill", "m", 1.40, 0.05, 0.03, 6.00),
("Pocketing", "m", 0.25, 0.03, 0.00, 2.00),
("Zip", "pc", 1, 0.02, 0.00, 0.40),
("Button", "pc", 1, 0.02, 0.00, 0.15),
]
units = 2000 # garments in the order
def gross_qty(net, wastage, shrinkage):
"""Wastage is a share of net quantity. Shrinkage is a share of the cut length."""
return round(net * (1 + wastage) / (1 - shrinkage), 6)
total_cost = 0.0
for item, unit, net, wastage, shrinkage, price in bom:
gross = gross_qty(net, wastage, shrinkage)
line_cost = gross * price
total_cost += line_cost
order_qty = math.ceil(round(gross * units, 6)) # round up once, on the total
print(
f"{item:<14} net {net:5.3f} gross {gross:6.3f} {unit:<2} "
f"cost {line_cost:6.3f} order {order_qty} {unit}"
)
print(f"Material cost per garment: {total_cost:.2f}")The twill line comes out at about 1.515 m per garment, because 1.40 × 1.05 ÷ 0.97 ≈ 1.515. For 2,000 garments you order 3,031 m, and the zips come to exactly 2,040 pieces.
The round(..., 6) calls guard against floating-point noise. Without them, a product such as 1 × 1.02 × 2000 can come out as 2040.0000000000002, and math.ceil would then order 2,041 pieces. This kind of bug is easy to miss in a spreadsheet too, so check your rounding on a line where you know the right answer.
Common mistakes
- Applying wastage to the wrong base. Wastage on a trim should use the trim quantity, not the fabric quantity.
- Using one blanket percentage. A single 5% applied to every line overstates cheap trims and understates printed fabric.
- Counting marker waste twice. See the warning above.
- Ignoring shrinkage on knit fabric. Knits often shrink more than wovens, and the loss is large enough to move the garment cost.
- Rounding per garment. This inflates the order quantity and hides the real unit cost.
- Never updating the figures. After each production run, compare the fabric you used with the fabric you ordered. Feed the actual loss back into the next BOM.
Exercise
A shirt body fabric has a net consumption of 2.00 m per garment. You allow 4% wastage (as a share of net) and the fabric shrinks 2% in length. The price is 5.00 per metre. What is the gross quantity per garment, and what is the fabric cost per garment?
Show answer
Gross = 2.00 × 1.04 ÷ 0.98 = 2.0800 ÷ 0.98 ≈ 2.122 m. Cost = 2.122 × 5.00 ≈ 10.61 per garment.
Exercise
A trim has a net quantity of 1 piece per garment and a 5% loss rate. Compare the gross quantity for a 4,000-garment order when 5% is applied as a share of net, and when 5% is treated as a share of gross. Round up to whole pieces.
Show answer
As a share of net: 4,000 × 1.05 = 4,200 pieces. As a share of gross: 4,000 ÷ 0.95 = 4,210.5, which rounds up to 4,211 pieces. The gap is 11 pieces, and it widens as the percentage rises, so choose one convention and state it on the cost sheet.