Sub topic 7
CMT and Labour Costing
This chapter covers how to cost the labour a factory charges to turn materials into a finished garment. It assumes you can read a garment BOM, know basic construction terms (seams, linings, closures), and are comfortable with percentages and simple spreadsheet arithmetic. The next chapter combines this figure with material cost in the cost sheet.
What CMT means
CMT stands for cut, make and trim. It is the fee a factory charges to cut your fabric, sew the garment, and finish it. A factory that works on this basis is called a CMT factory. The charge covers labour, machines, factory overhead and the factory's profit.
The three words mean different things in practice:
- Cut covers spreading the fabric, cutting along the marker, bundling the pieces and numbering them.
- Make covers sewing, pressing and assembly.
- Trim covers attaching trims, plus finishing work. This includes thread trimming, final pressing, quality inspection, folding, tagging and packing into polybags.
"Trim" in CMT is a source of confusion. It means the work of attaching trims, not the trims themselves. The buttons, zips and labels are still lines on your BOM, and you still pay for them. If a factory quotes CMT only, you or the factory must separately buy the materials.
Where CMT sits in the cost
In the BOM-to-price chain, CMT is the labour half of the FOB cost. Materials come from the BOM. CMT comes from the factory quote. Together they form the FOB cost, which is the price to deliver goods onto the ship.
Two ways to get a CMT figure
You can get a CMT figure from the factory's quote or by estimating it yourself from sewing time. Experienced costers do both and compare.
Method 1: the factory quote
The factory looks at your tech pack and sample, and quotes a price per garment. This is the usual approach, because the factory knows its own wages, line efficiency and machines. Quotes are normally in US dollars even when the factory pays wages in local currency.
A quote should state:
- the style and size range it applies to
- the order quantity it assumes
- what is included (for example, packing, labelling, and cartons)
- the currency and payment terms
Two quotes for the same style are only comparable if their inclusions match. A low CMT that excludes packing is not cheaper than a higher one that includes it.
Method 2: estimating from SAM
SAM stands for standard allowed minutes. It is the time a trained operator needs to complete a task at a standard pace, including a small allowance for rest and fatigue. Adding the SAM of every operation in the garment gives the total SAM for the style.
You turn SAM into a labour cost with a minute rate. The minute rate is what one minute of sewing line time costs the factory. It comes from wages, overhead and profit divided by the productive minutes available.
The formula is:
CMT = total SAM × cost per minute ÷ line efficiency
Line efficiency is the share of paid time that produces output at the standard pace. A line at 60% efficiency takes longer than the SAM suggests, so you divide by 0.60. Efficiency is lower on new styles, small orders and complex garments, because operators are still learning the work.
# Operation breakdown for a simple trouser: (operation, SAM in minutes)
operations = [
("Cut and bundle", 1.8),
("Make and attach pockets", 4.2),
("Sew front and back rise", 2.5),
("Attach fly and zip", 3.6),
("Join side seams and inseams", 3.4),
("Attach waistband", 4.0),
("Belt loops", 2.2),
("Hem", 1.5),
("Buttonhole and button", 1.3),
("Thread trim, press, inspect, pack", 3.5),
]
total_sam = sum(sam for _, sam in operations)
cost_per_minute = 0.08 # assumed all-in cost of one line minute, in USD
efficiency = 0.60 # assumed line efficiency for a new style
cmt = total_sam * cost_per_minute / efficiency
print(f"Total SAM: {total_sam:.1f} min")
print(f"CMT: {cmt:.2f} USD")With these numbers the total SAM is 28.0 minutes and the estimated CMT is 3.73 USD. The 4.50 USD in the BOM example earlier in this tutorial is a factory quote, and it is higher. That gap is normal. A quote carries the factory's margin and its allowance for risk. Your estimate is a negotiating reference, not a replacement.
The cost per minute and the efficiency here are assumptions made for the example. Real minute rates vary widely by country, factory and year.
What drives CMT up or down
CMT is not a fixed property of a garment type. Several factors change it.
| Driver | Effect on CMT | Why |
|---|---|---|
| Construction complexity | Higher with more operations | Each operation adds SAM |
| Order quantity | Lower at higher volume | Learning effect, fewer line changeovers |
| Fabric type | Higher for slippery, stretch or sheer fabrics | Slower, more careful sewing, more defects |
| Country of production | Varies widely | Wage levels and productivity differ |
| Quality level | Higher with tighter tolerances | More inspection and rework |
| Washing or finishing | Often separate | Garment wash may be a distinct charge |
Small orders deserve special attention. A factory must set up a line for every style. Spread across 300 units, the setup time is a large part of each garment's cost. Spread across 3,000 units it is small. Factories often add a small-quantity surcharge or state a higher price below a minimum order.
Items that sit beside CMT
Some costs are not in the base CMT quote. Check each one so it appears somewhere in your cost sheet.
- Embellishment and decoration. Embroidery, screen printing and appliqué are usually charged separately, per piece or per stitch count.
- Garment washing and dyeing. Denim washes, enzyme washes and garment dyeing are charged per garment, sometimes by a separate laundry.
- Testing and inspection. Third-party lab tests and pre-shipment inspections have their own fees.
- Sampling. Development samples are normally charged separately from production, and are not part of per-garment CMT.
- Packing. Some quotes include hangtags and polybags attached by the factory. Others exclude cartons and hangers.
If you leave one of these out, your FOB cost looks lower than reality, and the shortfall appears later as lost margin.
Common errors
These mistakes recur when costing labour.
- Reading "trim" as the trim materials. This leads to double counting trims in both the BOM and CMT, or missing them entirely.
- Assuming CMT is the same across sizes. Larger sizes take slightly more sewing time. Many factories quote one price for the whole size range, so confirm whether that is the case.
- Using an efficiency from a mature style. A new style often runs well below a repeat style. Using 85% for a first-time order understates labour.
- Comparing quotes with different inclusions. One factory includes packing, another does not. The headline numbers are not comparable until adjusted.
- Ignoring currency. A quote in US dollars is stable for you if your costs are in dollars. If your sales are in another currency, changes in the exchange rate move your margin even though the quote did not change.
- Treating a SAM estimate as a quote. SAM gives you a reference point. It does not include the factory's own profit and risk.
Putting CMT into the cost sheet
Once you have a CMT figure, you add it to the material cost. The Python example below continues the running example. It takes the material cost from a BOM and adds CMT plus separately charged items.
# Material cost taken from the BOM (see earlier chapter)
material_cost = 9.90
# Labour and related per-garment charges from the factory quote
cmt = 4.50
embroidery = 0.60 # separate charge, per piece
garment_wash = 0.00 # not applicable to this style
labour_cost = cmt + embroidery + garment_wash
fob = material_cost + labour_cost
print(f"Labour {labour_cost:.2f} FOB {fob:.2f}")
print(f"Labour share of FOB: {labour_cost / fob:.0%}")Run it and the output is Labour 5.10 FOB 15.00 followed by Labour share of FOB: 34%. The labour share is a useful sanity check. In many woven garments, labour is a modest part of FOB and materials dominate. In simple knit garments the shares can be closer. A figure far outside your usual range is a prompt to check the quote.
Negotiating and checking a CMT quote
You can use your SAM breakdown in a conversation with the factory. Walk through the operations and ask where the time goes. Consider these approaches:
- Ask for the operation breakdown behind the quote.
- Ask what efficiency the factory assumed, and for what quantity.
- Offer a larger or repeat order in exchange for a lower price.
- Simplify construction. Removing a pocket flap or a topstitch row reduces SAM and therefore CMT, a lever covered in the target costing chapter.
Exercise
A shirt has a total SAM of 22 minutes. The factory's cost per line minute is 0.07 USD. You expect line efficiency of 55% because it is a new style. Calculate the estimated CMT. Then say what happens to the estimate if efficiency turns out to be 70%, and why a factory's quote might still be higher than your estimate.
Show answer
CMT = 22 × 0.07 ÷ 0.55 = 1.54 ÷ 0.55 = 2.80 USD. At 70% efficiency, CMT = 1.54 ÷ 0.70 = 2.20 USD, so higher efficiency lowers the cost per garment because the same work is done in less paid time. A quote can still be higher than your estimate because it includes the factory's profit margin and an allowance for risk, and your estimate is only a reference.
Exercise
A factory quotes 3.80 USD CMT for a jacket and says nothing more. A second factory quotes 4.20 USD and states that it includes polybag, hangtag attachment and carton packing. What should you check before concluding the first factory is cheaper?
Show answer
Check what the 3.80 USD quote includes. If it excludes packing, hangtag attachment and cartons, those costs must be added, either from the factory or from a packing supplier, before comparing. Also check the order quantity, size range and currency each quote assumes. Only after the inclusions match can you compare the two figures.