Sub topic 6
Estimate how long things take
This chapter assumes you already capture tasks in one place and write them as verb-led next actions. Here you add one more property to each task: a duration. Without it, you can't compare your list against the time you have, which is the next chapter's job.
Why estimates matter
A list of ten tasks looks manageable until you learn that it adds up to eleven hours. An estimate turns "a lot to do" into a number you can check against your day. It doesn't have to be accurate to the minute. It has to be good enough to tell you whether the list fits.
The working model
Most people underestimate for three reasons:
- They picture the best case, where nothing interrupts them and nothing is missing.
- They forget the setup and wrap-up around the task, such as finding files, switching context, and sending the result.
- They estimate whole projects instead of single next actions.
The fix is to estimate small, concrete actions. A next action that can be done in one sitting is far easier to size than "Presentation".
Use fixed size buckets
Don't try to guess 37 minutes versus 42. Round each task up to the nearest bucket:
| Bucket | Typical use |
|---|---|
| 5 min | A quick call, a short reply, a simple lookup |
| 15 min | A routine email, a small form |
| 30 min | A short draft, a focused review |
| 60 min | A substantial piece of work |
| 2 h | The upper limit for a single task |
If a task seems longer than two hours, it is probably a project. Go back and break it into smaller steps.
Worked example
Take three tasks from the earlier chapters. Each one gets an estimate and a short reason.
Call Mom to confirm Sunday lunch time (5 min)
Reason: one phone call, no preparation.
Reply to vendor quote (15 min)
Reason: read the quote, check two numbers, write a reply.
Draft a three-bullet outline of the Q3 presentation (30 min)
Reason: I have the notes; I need to organize them, not research.Now compare how you first guessed with how long a task actually took. This is the habit that improves your estimates over time:
Task: Prepare expense report
Estimate: 30 min
Actual: 50 min (receipts were in three places)
Lesson: Add 15 min when documents must be collected first.Calibrate with a small log
For one week, write the actual time next to a few tasks. Look for a pattern. If your actual times are often about 1.5 times your estimates, multiply every new estimate by 1.5. A consistent correction is more useful than trying to be precise.
Common errors
- Estimating in your head only. Write the number next to the task, or you won't notice when it is wrong.
- Using ranges that are too wide. "1 to 5 hours" tells you nothing. Split the task until the range is narrow.
- Counting only the doing. Include gathering materials and sending the result.
- Never checking afterward. Without a comparison, your guesses stay as optimistic as the first day.
How estimates feed the next step
Exercise
You wrote "Prepare expense report (30 min)". It took 50 minutes because the receipts were in three places. Name two things you could change next time, one about the estimate and one about the task.
Show answer
Estimate: add time for collecting documents, for example 45 to 50 minutes. Task: split it into "Collect all receipts into one folder (15 min)" and "Fill in the expense report (30 min)", so each step is sized separately.
Exercise
A task reads "Write the project proposal (4 h)". What should you do with it, and why?
Show answer
Treat it as a project and break it into next actions of two hours or less, such as "List the proposal's main sections (15 min)" and "Draft the budget section (60 min)". A single task of four hours is hard to estimate and hard to fit into a day.