Sub topic 4
Decide what finished looks like
This chapter assumes you already capture tasks in one place and can rewrite a vague item as a next action that starts with a verb. Here you add the next step: defining what "done" means for each task before you start it.
Why a next action is not enough
A next action such as "Draft the Q3 outline" is clearer than "Presentation". It still leaves open when you may stop. You could stop after three bullets or after a polished ten-slide deck. Without a stopping point, a task expands to fill the time you give it. It also never gets crossed off, because there is always something more to improve.
A definition of done is a short statement of the condition that makes a task finished. It is observable, so you can check it without judging how you feel about the work.
What a good definition of done contains
A useful definition answers three questions:
- What will exist when I am finished? (a file, a sent message, a booked appointment)
- How good does it need to be? (a rough draft, a final version, a checked version)
- Who or what receives it, if anyone? (your manager, a folder, a shared calendar)
The second question matters most. Most overruns come from silently aiming for "perfect" when "good enough to move on" was all the task required.
Task: Draft three-bullet outline of the Q3 presentation (30 min)
Done when: Three bullets are saved in the presentation file.
No slides, no wording polish.
Task: Reply to vendor quote (15 min)
Done when: Reply is sent, accepting or declining, with one question at most.
Task: Prepare expense report (45 min)
Done when: All receipts are attached and the report is submitted for approval.Each "done when" line names a concrete result and states what is out of scope. You can read the line and answer yes or no.
Check your definition
A quick test is to imagine handing the task to someone else. If they could not tell when to stop, the definition is too loose.
| Loose | Concrete |
|---|---|
| Work on the budget | Enter all March expenses into the budget sheet |
| Research laptops | List three laptops under 1,000 with price and battery life |
| Clean the garage | Move all boxes from the left wall to the shelves |
| Think about the offer | Write pros and cons, then decide by Friday |
Notice that the concrete versions often include a number, a place, or an output. These are signs of a checkable result.
Common errors
- Defining done as effort. "Work on the report for an hour" ends when the clock does, not when something exists. Use a result instead, or treat time-boxing as a separate, deliberate choice.
- Hidden steps. "Send the invoice" may also require finding the client's address. If the missing step is large, make it its own task.
- Aiming above the requirement. If a rough draft satisfies the person waiting, a polished draft is wasted time.
- Waiting on others. "Get approval" is not within your control. Define done as "Send the request for approval", then track the reply separately.
Done also helps estimates
A fixed finish line makes time estimates more reliable, because you are estimating a specific outcome. The next chapters build on this when you size tasks against your available time.
Exercise
Rewrite "Look into health insurance" as a next action, and add a "done when" line that includes an output, a quality level, and a limit.
Show answer
One answer: "Compare three health insurance plans (30 min)." Done when: a table lists monthly cost, deductible and coverage for three plans, and I have marked a favorite. No sign-up and no phone calls yet. The output is the table, the quality level is "comparable at a glance", and the limit excludes enrolling. Other answers are fine if you can check them with a yes or no.