Sub topic 5
Break big projects into small steps
This chapter assumes you already capture tasks in one inbox and can rewrite a vague item as a next action that starts with a verb. Here you apply that skill to larger outcomes that need many steps.
Why projects stall
A project is any outcome that needs more than one action to finish. "Organize the team offsite" is a project. "Write the Q3 report" is a project. If either one sits on your list as a single line, you cannot do it in one sitting. Each time you read it, you must work out the first step again. That repeated effort makes you avoid the item.
The fix is to turn the project into a short sequence of small actions. Each action should be something you can finish in one sitting, usually 15 to 60 minutes.
A working method
- Write the project as an outcome. Use a finished state, such as "Q3 presentation delivered to the leadership team."
- List every step you can think of, in any order. Do not edit yet.
- Rewrite each step as a next action with a verb and a clear finish.
- Put the steps in order. Mark which ones depend on others.
- Mark the first action. This is the one that goes on your daily list.
- Add an estimate to each step, as you learned in the previous chapter on defining done.
A worked example
Take the project "Q3 presentation delivered to the leadership team." Your first brain dump might look like this:
- Outline
- Numbers
- Slides
- Ask Priya about the budget slide
- Practice
Now rewrite each line so it is concrete and sized:
Project: Q3 presentation delivered to the leadership team
1. Draft a three-bullet outline of the Q3 presentation (30 min)
2. Email Priya to ask which budget figures to include (5 min)
3. Export the Q3 sales figures from the reporting tool (20 min)
4. Build the slides from the outline and figures (60 min)
5. Rehearse once out loud and fix unclear slides (30 min)
Next action: step 1The steps total 2 h 25 min. That is a useful number. You can now compare it against the time you have, which the capacity chapter covers.
Check your steps
A step is the right size when it passes three tests:
| Test | Question | If it fails |
|---|---|---|
| Verb | Does it start with an action word? | Rewrite it. "Slides" becomes "Build the slides." |
| Sitting | Can I finish it in one session? | Split it into two steps. |
| Finish | Will I know when it is done? | Add a result, such as "three bullets" or "email sent." |
Common errors
- Over-planning. Listing 40 steps for a small project wastes time. Detail the next few steps and keep the later ones rough. You can refine them when you reach them.
- Hidden waiting. Some steps depend on other people. "Email Priya" is your action. The reply is not. Record that you are waiting, and note a date to check back.
- Everything on today's list. Only the next action for each active project belongs on your daily list. Putting all five steps there creates overload.
- Steps that are still projects. "Plan the venue" may hide ten actions. If you cannot start it immediately, break it down again.
Exercise
Break the project "Move to a new apartment" into at least four next actions. Each must start with a verb, fit in one sitting, and have an estimate. Which one is your next action?
Show answer
A sample answer: 1. Search three rental sites and save five listings that fit the budget (45 min). 2. Call two listings to book viewings (15 min). 3. Write a list of items to sell or discard (30 min). 4. Request quotes from two moving companies (20 min). The next action is step 1, because the other steps depend on having listings. Any answer is valid if each step starts with a verb, can be finished in one sitting, has an estimate, and one step is clearly marked as next.