Sub topic 6
Estimate How Long Things Take
This chapter assumes you already capture tasks in one inbox and write them as next actions that start with a verb and have a clear finish. You also need a rough idea of the commitments in your typical week. Here you add a duration to each next action so that, in the next chapter, you can compare your list against the time you actually have.
Why an estimate belongs on every task
A task without a duration is hard to place. "Reply to vendor quote" might take five minutes or an hour. If you don't know which, you can't tell whether it fits into a gap before a meeting. You also can't tell whether three tasks fit into an afternoon.
An estimate is a planning number, not a promise. Its job is to make overload visible before the day starts. If you plan 7 hours of work into a 3-hour window, you find out at 9 a.m. instead of at 5 p.m.
You only need to be roughly right. An estimate that is within a factor of about 1.5 is good enough for daily planning. Spending ten minutes to estimate a five-minute task defeats the purpose.
Why people underestimate
Most people guess low, and the error has known causes.
- Best-case thinking. You picture the task going smoothly. You don't picture the missing file, the unanswered question, or the software update.
- Forgotten parts. You count the core work and skip setup, checking, and sending. "Write the report" leaves out gathering the numbers and proofreading.
- Vague finish lines. If you haven't decided what finished looks like, the task grows to fill whatever time you give it.
- Memory of the best day. You remember the one time a similar task took 20 minutes and forget the three times it took an hour.
This is called the planning fallacy. It is a consistent bias, so you can correct for it with a few habits instead of trying harder to be accurate.
Step 1: Estimate the finished task, not the vague one
Estimate only after the task has a clear finish. "Taxes" can't be estimated. "Find last year's tax return and list the documents still missing" can, because you know when you are done.
Here is the example from the spine. Each vague item becomes a next action with a verb, a one-sitting scope, and a duration.
Vague: Taxes
Concrete: Find last year's tax return and list the documents still missing (20 min)
Vague: Mom
Concrete: Call Mom to confirm Sunday lunch time (5 min)
Vague: Presentation
Concrete: Draft a three-bullet outline of the Q3 presentation (30 min)Notice the pattern. The duration sits in parentheses at the end of the line, so you can scan a list and add the numbers quickly.
Step 2: Use size buckets instead of exact minutes
Exact numbers such as 37 minutes suggest precision you don't have. Round to a small set of sizes. A fixed set also makes you decide faster.
| Bucket | Typical use |
|---|---|
| 5 min | A short call, a one-line reply, a quick lookup |
| 15 min | A short email that needs thought, a small form |
| 30 min | A first draft of something short, a focused review |
| 60 min | A real piece of work with some thinking |
| 2 h | The largest size you should schedule as one task |
If a task seems larger than 2 hours, don't give it a bigger bucket. Treat it as a project and split it into next actions, as described in the previous chapter on breaking down projects. A single task that needs half a day is usually several tasks that were never separated.
When you hesitate between two buckets, choose the larger one. Because people guess low, rounding up corrects part of the bias.
Step 3: Use your own history
The most reliable estimate comes from how long similar tasks took you before. Your memory of this is unreliable, so measure it for a short time.
For one or two weeks, write the estimate next to each task. When you finish, write the actual time. A plain text log is enough.
Task Est. Actual
Reply to vendor quote 15 25
Prepare expense report 45 70
Draft Q3 outline 30 35
Call Mom to confirm Sunday lunch 5 5Then compute your ratio of actual to estimated time. You can do this by hand, or with a short script if you keep the log in a file.
# Compare estimated and actual minutes to find your personal correction factor.
log = [
("Reply to vendor quote", 15, 25),
("Prepare expense report", 45, 70),
("Draft Q3 outline", 30, 35),
("Call Mom to confirm Sunday lunch", 5, 5),
]
total_estimated = sum(est for _, est, _ in log)
total_actual = sum(act for _, _, act in log)
factor = total_actual / total_estimated
print(f"Estimated: {total_estimated} min")
print(f"Actual: {total_actual} min")
print(f"Correction factor: {factor:.2f}")
for name, est, act in log:
print(f"{name}: {act / est:.2f}x")With these numbers the totals are 95 minutes estimated and 135 minutes actual, so the factor is about 1.42. That means your raw estimates are low by roughly 40%. From now on, multiply a raw estimate by 1.4, or round up one bucket.
The factor can differ by type of work. Phone calls may be accurate while writing runs at 1.8. If you have enough data, keep one factor per type.
Step 4: Add the parts people forget
Before you settle on a number, check whether the task includes any of these.
- Setup. Opening files, finding documents, logging in.
- Waiting. Loading, syncing, a colleague who needs to answer.
- Checking. Proofreading, testing, a second look at the numbers.
- Closing. Sending, filing, updating the list, telling someone it's done.
Add these to the estimate, or write them into the task. "Prepare expense report" at 45 minutes may really be "Collect receipts (10 min)", "Enter them (25 min)", and "Submit and file the confirmation (10 min)". Splitting like this often reveals that the real total is longer than the first guess.
Step 5: Estimate ranges when you are unsure
Some tasks are unfamiliar. For these, give two numbers: a realistic case and a bad case.
- Realistic: how long it takes if one or two small things go wrong.
- Bad case: how long it takes if the main thing you are unsure about goes wrong.
For example, "Set up the new expense tool: 30 to 90 min". Plan with the upper number when the task is important or has a deadline. Plan with the lower number only when the task is optional.
If the range is very wide, such as 20 minutes to 4 hours, the task is not understood yet. Create a small first step whose purpose is to learn, such as "Read the setup guide and list the steps (15 min)". Then estimate the rest.
Step 6: Timebox when the work has no natural end
Some work is open-ended, such as research, tidying a document, or answering email. An estimate doesn't help much because the work stretches. Reverse the question: how much time is this worth?
A timebox is a fixed amount of time you give a task, after which you stop and decide what to do next. Write it as part of the task: "Research three vendors (45 min, stop at the timer)". When the time ends, you either mark it done, accept a partial result, or create a new next action for what remains.
Timeboxes work well for tasks where "good enough" is acceptable. They work badly for tasks with a fixed standard, such as a tax filing or a safety check. For those, estimate the work and plan the needed time.
Common errors
- Estimating unclear tasks. The number is meaningless until the finish line is defined. Fix the wording first.
- Estimating at the wrong size. Tasks over 2 hours hide several steps. Split them.
- Never checking actuals. Without a record, your bias continues unnoticed.
- Over-precision. Tracking every task to the minute costs more than it saves. Track for a short period, learn your factor, then stop or sample occasionally.
- Estimating for a perfect day. Estimates assume focused time. Interruptions are handled in the next chapter through a buffer, not by inflating every task.
- Treating the estimate as a target. If a 30-minute task takes 20, you have gained 10 minutes. Don't stretch the work to fill the slot.
- Ignoring someone else's time. If a task depends on a person's reply, the work may take 5 minutes but the elapsed time may be two days. Record the work estimate, and track the waiting as a separate follow-up item.
How estimates connect to the day
Estimates become useful when you add them up. In the next chapter, you subtract meetings and a buffer from your day, and compare what remains with the total of your estimates. The example from the spine shows the idea.
Available today: 6 h meetings and focus time minus 2 h meetings = 4 h
Buffer (25%): 1 h
Plannable time: 3 h
1. Draft Q3 outline (30 min)
2. Reply to vendor quote (15 min)
3. Prepare expense report (45 min)
Total: 1 h 30 min, which fits within 3 hIf you use raw estimates here, apply your correction factor first. With a factor of 1.4, the 90-minute total becomes about 126 minutes, which is still within the 3 hours.
The flow of the whole estimating routine looks like this.
A practical routine
- When you clarify a task, add a duration in parentheses.
- Use the size buckets. Round up when unsure.
- For unfamiliar work, give a range and plan with the upper number.
- For open-ended work, set a timebox.
- For two weeks, record the actual time of each finished task.
- Compute your correction factor, and apply it to future estimates.
- Every few months, sample a week again to check that the factor still holds.
Exercise
Your log for four tasks shows estimates of 20, 30, 10 and 40 minutes, and actual times of 30, 45, 10 and 65 minutes. What is your correction factor, and what duration should you plan for a new task that you estimate at 50 minutes?
Show answer
Total estimated is 100 minutes and total actual is 150 minutes, so the factor is 150 / 100 = 1.5. A raw estimate of 50 minutes becomes 50 x 1.5 = 75 minutes, so plan for about 75 minutes (or round to 1 h 15 min).
Exercise
The task "Write the annual report" is estimated at 6 hours. What should you do before planning it, and what is one first next action you could write with a duration?
Show answer
Do not schedule it as one task, because anything over 2 hours hides several steps. Split it into next actions that each fit in one sitting. One example is "Collect last year's figures and list the sections the report needs (30 min)".
Exercise
A colleague must approve your draft, and you estimate the work to send it at 10 minutes. Why is "10 min" not the whole story, and how do you record the rest?
Show answer
The estimate covers your effort, but the approval depends on someone else, so elapsed time may be days. Record the 10-minute send as a task, and add a separate follow-up item with a reminder date to check for the reply.