Sub topic 4
Decide What Finished Looks Like
This chapter assumes you already capture tasks in one inbox and can rewrite a vague item as a next action that starts with a verb. Here you add the missing piece: a clear statement of when the task is done. Without it, you can work on a task for hours and still not know whether to stop.
Why "done" needs a definition
A next action tells you where to start. A definition of done tells you where to stop. If you only have the start, three problems appear.
- Endless tasks. "Improve the slide deck" never ends, because there is always another change to make. You keep returning to it and never cross it off.
- Silent scope growth. You sit down to "write the report" and also reformat the template, rebuild the charts and reread last year's version. The task takes three times as long as planned.
- Fake completion. You mark the task finished, but someone else still has to wait for something from you. The item leaves your list and the commitment stays open.
All three come from the same gap. The task describes an activity ("work on", "look at", "think about") and not a result you can check.
What a good finish line looks like
A good finish line has three properties.
- Observable. You, or a stranger looking at your work, can tell whether it is true. "The draft is saved in the shared folder" is observable. "The draft is good" is not.
- Binary. The answer is yes or no, not "mostly". If you are tempted to say "about 80% done", the line is too fuzzy.
- Within your control. It depends on what you do, not on what another person decides. "Send the proposal" is within your control. "Get the proposal approved" is not.
The third property causes the most trouble. Many people write outcomes that depend on others, then feel they failed when nothing happened. Put the finish line at the point where your part ends. If you are waiting on someone, record the wait separately, as covered below.
Activity words and result words
Some verbs describe effort and some describe a result. Prefer the second kind when you write the finish line.
| Activity wording (no finish) | Result wording (clear finish) |
|---|---|
| Work on the budget | Enter all March expenses into the budget sheet |
| Look into health insurance | List three plans with monthly cost and deductible |
| Think about the logo | Choose one of the two logo drafts and write down why |
| Prepare for the meeting | Write the three questions I want answered and print the agenda |
| Clean the garage | Fill and remove four bags of trash from the left wall |
The right column often adds a number, a count, a file name or a place. Those details are what make the line observable.
Writing the finish line
A simple pattern is to append a "done when" clause to the next action.
Next action: Draft a three-bullet outline of the Q3 presentation (30 min)
Done when: The outline is saved as q3-outline.md and has exactly three bullets
Next action: Call Mom to confirm Sunday lunch time (5 min)
Done when: The lunch time is written in my calendar
Next action: Find last year's tax return and list the documents still missing (20 min)
Done when: A list of missing documents exists, even if it is emptyNotice the last example. "Even if it is empty" handles an edge case: the task is finished when the check has been made, not when problems have been found. Without that clause you may feel the task is unfinished because the list came out short.
You do not need a "done when" line for every item. A five-minute task such as "Reply to the vendor quote" is its own finish line. Add the clause when you notice any of these signs:
- You have postponed the task more than once without a clear reason.
- The task could take 20 minutes or three hours depending on how far you go.
- Another person is waiting for the result.
- The task is creative or analytical, where there is always more to polish.
Good enough: setting the quality bar
A finish line also states how good the result must be. Without that, perfectionism sets the bar for you, and it sets it very high.
Ask one question before you start: who will use this, and what do they need from it? A draft for your own notes needs less care than a contract for a client. Write the answer into the finish line.
- "Done when the email is clear enough that the recipient can answer yes or no."
- "Done when the summary fits on one page. No formatting needed."
- "Done when the code passes the existing tests. Refactoring is a separate task."
The last example shows a useful habit. When you find extra work while doing a task, do not absorb it. Write it into the inbox as a new item and keep the current finish line unchanged. This protects your estimate and keeps the task closable.
When the result depends on other people
Many tasks end with you handing something to someone and waiting. Treat these as two items, not one.
- Your action: "Send the signed form to HR." Done when the email is sent.
- Your follow-up: "Check that HR confirmed receipt of the form." Done when the confirmation is in your inbox. Give it a date, for example three working days later.
Splitting them lets you finish the part you control today and still keep the commitment visible. Many people also keep a short "waiting for" list for items like the second one, so that open handoffs do not disappear.
Definition of done for recurring and ongoing work
Some work has no natural end, such as "keep the inbox under control" or "exercise more". These are areas of responsibility, not tasks. Do not put them on a daily list as they are.
Instead, define a finish line for one round of the work.
- Not "Handle email". Use "Process the work inbox to zero, sorting each message into reply, delegate, file or delete".
- Not "Exercise more". Use "Complete the 30-minute run on Tuesday".
For a repeating item, the definition applies to each occurrence. Check it again each time, because the right size of the task may change.
A worked example
Suppose your inbox contains the item "Newsletter". It could mean anything, so you clarify it in three steps.
- Find the next action. The newsletter goes out on Friday. The first missing piece is the content, so the action is "Draft the three article summaries for the newsletter".
- Write the finish line. "Done when each summary is under 80 words and saved in the newsletter folder. Layout and sending are separate tasks."
- Estimate and place it. 45 minutes, scheduled for Wednesday morning.
Now the work can be checked. At the end of the session you look at the folder: three files, each under 80 words, so the task is closed. If you notice that the layout also needs attention, you capture "Format the newsletter in the template" as its own task and keep going.
Common errors
- Writing a feeling as the finish line. "Feel ready for the interview" cannot be checked. Use "Answer five practice questions aloud and note two weak spots".
- Making the finish line too large. If "done when" describes an hour-long list of conditions, the task is a project. Break it into smaller steps, which is the topic of the next chapter.
- Counting effort as completion. "Spent two hours on it" says nothing about the result. Time spent is useful for estimating but not for closing.
- Closing a task without the handoff. If someone is waiting for what you made, the task is not finished until it reaches them.
- Leaving the finish line only in your head. Write it next to the task. When you are tired on a Thursday afternoon, you will not remember what you meant on Monday.
Summary of the method
For each task that is unclear, long or often postponed, follow this short routine:
- State the next action with a verb.
- Add "done when" with an observable, yes-or-no, controllable condition.
- Set the quality bar by asking who uses the result.
- Split off anything that depends on others, with its own follow-up date.
- Capture extra ideas as new tasks and leave the finish line alone.
Exercise
You have the task "Look into a standing desk". Rewrite it as a next action with a "done when" line that is observable, binary and within your control. Then name one thing that you should capture as a separate task.
Show answer
One possible answer. Next action: "Compare three standing desk models on price and size (30 min)". Done when: a note lists three models, each with price, width and height range. A separate task could be "Ask my manager whether the office will pay for a desk", because it depends on another person. "Buy the desk" is also separate, since the choice has not been made yet. Any version works if the finish line can be checked yes or no without opinion and does not require someone else's decision.
Exercise
A colleague's task reads "Finish the report. Done when my manager is happy with it." Which of the three properties of a good finish line does this break, and how would you fix it?
Show answer
It breaks the "within your control" property, and it is also not observable or binary, because "happy" is a feeling that someone else holds. A fix is to split it. First, "Send the report to my manager. Done when the email with the final file is sent and the report covers the three sections in the brief." Second, "Follow up with my manager on the report. Done when I have written feedback or a confirmation, with a check scheduled two working days later."