Sub topic 3
Owning the backlog and setting priorities
This chapter assumes you know what a product backlog and a user story are, and that you have worked alongside software engineers. It covers what it means to own the backlog, how to order it, and the mistakes that make it unusable.
What ownership means
The product backlog is the ordered list of everything the team might build for the product. In Scrum, one person is accountable for it: the product owner. In many companies the product manager holds that role, or works closely with a person who does. Either way, ownership has a specific meaning.
- You are accountable for the content and the order of the backlog. You do not have to write every item yourself.
- You decide what is more valuable. Engineers decide how to build it and how much of it fits in a sprint.
- You make the ordering visible to everyone. A priority that lives only in your head cannot guide a team.
Ownership does not mean you must say yes to every request. A backlog with 400 items you will never build is a cost. Every item takes time to read, discuss, and re-rank.
What belongs in a backlog item
A backlog holds more than features. Typical item types are:
- New user-facing functionality, written as stories.
- Bugs that are not urgent enough to interrupt the current sprint.
- Technical work such as upgrades, refactoring, and performance work.
- Spikes, which are short, time-boxed investigations that answer a question.
- Research or design tasks that must finish before a story can be built.
Each item should have a clear title, the reason it exists, and a rough sense of its value. Items near the top need much more detail than items near the bottom.
Ordering: the backlog is a ranked list
A backlog is ordered, not tagged. If five items are labeled "high priority," you have not prioritized. You have only sorted them into two piles. Force a single ranking: item 1 is first, item 2 is second, and so on. Only the top of the list has to be exact. Items far down can be grouped loosely, because they will be re-ranked before anyone works on them.
The backlog is also shaped like a funnel in terms of detail:
- The top, roughly the next one or two sprints of work, is small, well understood, and ready to build.
- The middle holds items that are understood but still need discussion.
- The bottom holds ideas and rough requests.
Ways to decide what comes first
No formula makes the decision for you. Frameworks give structure to a conversation and expose assumptions. Three are common.
| Method | How it works | Good for | Weakness |
|---|---|---|---|
| Value vs. effort | Place items by estimated value and estimated cost, then favor high value and low cost | Quick comparisons within one team | Both axes are guesses, and effort estimates come from engineers |
| RICE | Score = (Reach × Impact × Confidence) ÷ Effort | Comparing many candidate features with some data | Scores look precise but rest on soft inputs |
| MoSCoW | Label items Must, Should, Could, Won't for a given release | Fixed-date releases and scope negotiation | Everything drifts into "Must" without discipline |
Here is a small RICE calculation so the arithmetic is concrete.
items = [
# name, reach (users per quarter), impact (0.25-3), confidence (0-1), effort (person-weeks)
("Guest checkout", 4000, 2.0, 0.8, 5),
("Saved cart reminder", 1500, 1.0, 0.5, 2),
("Address autocomplete", 3000, 0.5, 0.8, 3),
]
scored = []
for name, reach, impact, confidence, effort in items:
score = (reach * impact * confidence) / effort
scored.append((score, name))
for score, name in sorted(scored, reverse=True):
print(f"{name}: {score:.0f}")Running this ranks guest checkout first (1280), then address autocomplete (400), then saved cart reminder (375). Treat the output as an input to your judgment. If a low-scoring item unblocks a major commitment, it can still rank higher.
Inputs to prioritization
Good ordering draws on several sources, and you weigh them rather than obey any one.
- Customer evidence: interviews, support tickets, usage data, and lost-deal reasons.
- Business goals: the current objectives your company has set, such as retention or revenue.
- Engineering input: effort, risk, and dependencies. A cheap item with a hidden dependency may be expensive.
- Stakeholder requests: sales, support, and executives. These carry real information, but they are requests, not orders.
- Time sensitivity: regulatory deadlines, contract dates, and seasonal events.
Engineers should see the ordering and be able to challenge it. They often know that two items share work, or that doing one first makes the other cheaper. Order changes made with that knowledge are improvements, not lost authority.
Keeping the backlog healthy
A backlog decays unless someone prunes it. Practical habits:
- Review the top 20 items before every refinement session and confirm they still match current goals.
- Remove or archive items that have sat untouched for many months. If an idea matters, it will come back.
- Merge duplicates, and link related items.
- Record why an item was declined, so the same request does not return without new evidence.
- Keep a small number of items in the "ready" zone. Too many ready items go stale, and too few leave the team without work.
Common mistakes
- Treating the backlog as a wish list. Everything is accepted and nothing is removed, so the list loses meaning.
- Ranking by who asked loudest. The most senior or persistent requester wins, regardless of value.
- Over-specifying distant items. Detailed stories for work six months away are likely to be rewritten.
- Hiding the ranking. If engineers learn priorities only at sprint planning, they cannot flag problems early.
- Ignoring technical items. If only features are ranked, technical debt grows silently until it forces a crisis. A later chapter covers making room for it.
- Changing the top item constantly. Reordering the next few items every day makes planning impossible. Save disruption for real emergencies.
Exercise
Your backlog has 12 items marked "high priority" and a sales lead asks you to add a 13th. Using what this chapter covers, what two steps would you take?
Show answer
First, force a single ranking so the items are ordered from first to last, not grouped under one label. Then place the new request in that order by comparing it with the items near it, using evidence such as reach, impact, and effort. If it ranks high, say which existing items it displaces. If it ranks low, record the decision and the reason so the sales lead gets a clear answer.
Exercise
A feature scores 900 in RICE, but the confidence value of 0.9 is based on one customer's comment. What should you do before ranking it first?
Show answer
Check the confidence input. One comment is weak evidence, so confidence should be lower, or you should gather more data, for example with interviews or usage numbers. Rescore afterward, and consider a small spike to reduce uncertainty before committing a full sprint to it.