Sub topic 7
Definition of Ready and Definition of Done
This chapter assumes you know what a product backlog and a user story are, and that you have worked with engineers. It also assumes you have seen the sprint events. Here you will learn how two short checklists, the Definition of Ready and the Definition of Done, keep work flowing into and out of a sprint without surprises.
Two checklists at two gates
A story passes two gates during its life. The first is the point where the team agrees it can start the story. The second is the point where the team agrees the story is finished.
- The Definition of Ready (DoR) is a checklist a story should meet before the team pulls it into a sprint.
- The Definition of Done (DoD) is a checklist every story must meet before the team counts it as complete.
The two have different status in Scrum. The Scrum Guide defines the Definition of Done as a formal commitment tied to the Increment. It does not define a Definition of Ready. Many teams adopt a DoR anyway, as a working agreement. Treat it as a guide and not as a rule.
Who owns what
The two checklists have different owners, and mixing them up causes friction.
| Row | Definition of Ready | Definition of Done |
|---|---|---|
| Purpose | Protects the team from vague input | Protects users and stakeholders from unfinished output |
| Applies to | Stories entering a sprint | Every story leaving a sprint |
| Main author | Product manager and developers together | The Scrum team, with the developers holding the quality bar |
| Status in Scrum | Optional team practice | Required commitment |
| Typical failure | Used as a gate that blocks urgent work | Quietly weakened to hit a sprint goal |
As product manager, you contribute to the DoR heavily, because most of its items are product inputs. For the DoD, you contribute your needs, such as analytics tracking or accessibility, but the developers decide what quality they can stand behind. Do not lower the DoD to fit more into a sprint.
Writing a useful Definition of Ready
A good DoR lists what the team needs to estimate and start a story. Each item should be something you can check in under a minute.
Common items:
- The story states who benefits and why, in a user story or equivalent form.
- Acceptance criteria are written and testable.
- The team has discussed the story in refinement and can estimate it.
- Dependencies on other teams, vendors, or data are known, and none block the start.
- Designs or mockups exist where the story needs them.
- The story is small enough to finish within one sprint.
Here is a sample DoR kept as plain text that the team can paste into its wiki or ticket template.
Definition of Ready
- Story has a user, a need, and a reason.
- Acceptance criteria are written as checkable scenarios.
- Team has asked its questions and has an estimate.
- Designs are attached, or the story says none are needed.
- External dependencies are named, with an owner and a date.
- Story fits inside one sprint.The acceptance criteria item connects to the chapter on writing stories. A scenario such as "Given a registered user, When they submit their email on the reset form, Then the system sends a reset link" is checkable. "Password reset works well" is not.
Writing a useful Definition of Done
The DoD describes finished work at the level of the whole Increment, so it applies to every story. It is not the same as the acceptance criteria. Acceptance criteria say what this story must do. The DoD says what is true of every story once it is done.
Typical items:
- Code is reviewed and merged to the main branch.
- Automated tests pass, and new behavior has tests.
- The acceptance criteria are verified by someone other than the author.
- The change is deployed to a staging environment, or released behind a feature flag.
- Documentation, release notes, and support notes are updated.
- Analytics events fire as specified.
- No known critical defects remain open against the story.
Definition of Done
- Code reviewed and merged.
- Automated tests added and passing.
- Acceptance criteria verified in staging.
- Analytics events checked in the dashboard.
- Release notes drafted.
- No open critical bugs on this story.Keep the list short enough that the team reads it. Ten to twelve items is a practical ceiling.
How to use each checklist in practice
Use the DoR during refinement, not at sprint planning. If you test stories against it for the first time in planning, you discover gaps when it is too late to fix them. Walk the top of the backlog against the checklist a sprint ahead, and fix what is missing.
Use the DoD at three moments: when the developers pick up a story, while they work on it, and at the review. At the sprint review, show only stories that meet the DoD. If a story is nearly done but fails one item, it is not done. Carry it into the next sprint, and re-estimate the remaining work.
Edge cases and failure modes
Ready becomes a wall. If engineers refuse every story that misses one DoR item, urgent work stalls. Treat the DoR as a default that the team can waive by agreement. For example, a production incident does not need polished designs.
Ready becomes a contract. A story that meets the DoR is not a promise of the exact solution. Engineers can still raise questions in the sprint. Details that surface during building are normal.
Done shrinks under pressure. Skipping tests to close a story creates hidden work. The team's velocity then looks better than its real progress, and defects land later. If the team cannot finish its scope within the DoD, reduce scope and keep the DoD.
Done differs by story type. A spike (a time-boxed investigation) produces learning, not shippable code. Give spikes a defined output, such as a written recommendation, and agree that the DoD item "deployed to staging" does not apply. Say so in the story.
Different teams, different DoDs. When several teams contribute to one product, the Increment must meet a shared DoD. A team that applies a weaker standard produces work that cannot be integrated.
The DoD never changes. Review both checklists in the retrospective. A recurring bug type is a signal to add a DoD item. A recurring delay waiting on designs is a signal to tighten the DoR.
Your role in summary
You are responsible for making stories ready in time. You are not responsible for deciding what counts as quality work. When the team says a story is not done, accept it and adjust the forecast. When the team says a story is not ready, ask which item is missing and fix it.
Exercise
A developer says a story is finished, but it has no automated tests and the Definition of Done requires them. The sprint ends tomorrow, and a stakeholder wants to see it at the review. What do you do, and why?
Show answer
Treat the story as not done. Do not demo it as finished work, and do not count it toward the sprint's completed work. Ask the team whether the tests can be added before the review. If they cannot, show it as in-progress or leave it out, carry the remaining work into the next sprint, and re-estimate it. Lowering the Definition of Done for one story hides unfinished work and makes later forecasts unreliable.
Exercise
Name two items that belong in a Definition of Ready and one that belongs in a Definition of Done but not in a Definition of Ready. Explain the difference in purpose.
Show answer
Definition of Ready items include testable acceptance criteria and named dependencies. A Definition of Done item is that code is reviewed and merged with tests passing. The Definition of Ready checks that a story is clear enough to estimate and start. The Definition of Done checks that finished work meets the team's quality standard.