Sub topic 10
Why Adjusting a Stable Process Makes It Worse
This chapter assumes you know the difference between common-cause and special-cause variation and can read an individuals control chart. It also assumes you can compute a mean and a sample standard deviation. Here you will see why reacting to every deviation in a stable process increases variation, how to measure the damage, and what rule prevents it.
What tampering means
Tampering is adjusting a process in response to variation that is only common-cause noise. The term comes from W. Edwards Deming. It is also called over-adjustment or over-control.
Tampering usually looks like diligence. Examples:
- An operator measures a shaft at 10.05 mm against a target of 10.00 mm and lowers the machine offset by 0.05 mm.
- A manager sees this week's defect count rise and demands a root-cause investigation, although the count is inside its control limits.
- A call-center lead retrains the team after one bad satisfaction score.
Each reaction treats a single result as if it had a specific, findable cause. In a stable process it does not. The result is one draw from a distribution that is still centered where it was. Responding to it moves the process away from its center.
The logic behind the damage
In a stable process, each output is the process center plus a random deviation:
x = center + e
The deviation e is independent of the previous one. If the last result was high, the next result is no more likely to be low. It is as likely to be high as it ever was. Therefore the last deviation tells you nothing about the next one.
Now suppose you correct for the last deviation by moving the process setting by -e. The next output becomes:
x(next) = center - e(last) + e(next)
You have added the old deviation, with its sign reversed, to the new one. These two terms are independent, so their variances add. If each deviation has variance σ², the output variance is now 2σ². The standard deviation becomes σ√2, about 41% larger than before.
You did not remove any noise. You imported the previous noise into the next result and kept the new noise as well.
The funnel experiment
Deming illustrated this with a funnel dropped repeatedly onto a target. You can simulate it. The target is 0, and each drop lands at the funnel's position plus a random error. The code compares three adjustment rules:
- Rule 1: Never move the funnel.
- Rule 2: After each drop, move the funnel by the opposite of the miss, measured from the target.
- Rule 4: After each drop, move the funnel to where the last drop landed.
import random
from statistics import stdev
def funnel(n, rule, sigma=1.0, target=0.0, seed=1):
"""Simulate n drops of the funnel under an adjustment rule."""
rng = random.Random(seed)
setting = target # where the funnel is currently aimed
results = []
for _ in range(n):
result = setting + rng.gauss(0, sigma)
results.append(result)
if rule == 2:
setting -= result - target # compensate for the last miss
elif rule == 4:
setting = result # aim at the last result
return results
baseline = stdev(funnel(10_000, rule=1))
compensated = stdev(funnel(10_000, rule=2))
walking = stdev(funnel(10_000, rule=4))
print("rule 1 sd:", round(baseline, 3))
print("rule 2 sd:", round(compensated, 3))
print("rule 2 / rule 1:", round(compensated / baseline, 3)) # about 1.41
print("rule 4 sd:", round(walking, 1)) # far largerExpect the rule 2 ratio to land close to 1.41, which is √2. Rule 4 has no stable spread. Each drop inherits the full position of the last one, so the funnel performs a random walk. Its spread grows with the length of the run, and the standard deviation printed for rule 4 is much larger than the other two. Change n and watch it keep growing.
| Rule | Adjustment after each result | Effect on output |
|---|---|---|
| 1 | None | Spread stays at σ. Output stays centered on the target. |
| 2 | Opposite of the miss from target | Spread rises to about 1.41σ. Output stays centered. |
| 4 | Aim at the last result | Output wanders without bound. |
Rule 2 is the most realistic and the most dangerous. It sounds like sensible feedback control, it keeps the average on target, and its damage cannot be seen in the mean. Only the spread shows it.
What this does to capability
Variation feeds directly into defects, so tampering costs money. In the earlier chapters you saw that the fraction of output outside specification limits depends on the spread relative to the width of the tolerance. Raising σ by 41% shrinks Cp by the same factor. Suppose a stable process has a Cp of 1.33. Rule 2 tampering lowers it to about 1.33 / 1.41, which is roughly 0.94. A process that met requirements with room to spare now produces a steady stream of defects.
The process itself has not changed. The decision rule applied to it has.
Why tampering is so common
Tampering persists for understandable reasons:
- Out of spec is not a signal. A result outside specification limits tells you the part is bad. It does not tell you the process changed. A stable, capable-enough process still produces an occasional out-of-spec part. Reacting to the part as if it were a process change is tampering.
- Humans see patterns in noise. Any run of three rising points feels like a trend. Random sequences contain such runs regularly.
- Action feels responsible. Doing nothing after a bad result is hard to defend without data.
- Targets create pressure. Daily numbers compared with last week's number generate "explanations" for differences that are common-cause noise.
The prevention rule: let the chart decide
A control chart gives you an objective basis for acting. It separates the two situations that call for opposite responses:
| Chart status | Type of variation | Correct response |
|---|---|---|
| Point inside limits, no pattern | Common cause | Do not adjust. Leave the process alone. |
| Point outside limits, or a pattern rule violated | Probable special cause | Investigate and remove or correct the cause. |
| Stable but spread too wide for the customer | Common cause only | Redesign or improve the process itself. |
The last branch matters. Leaving a stable process alone does not mean accepting poor performance. It means that improvement must come from changing the system, such as better materials, tighter fixtures or a better method, and not from nudging settings after each result. This is the path that DMAIC, covered later in the tutorial, formalizes.
Tampering is not the only error
The opposite mistake exists. If a real shift occurs, such as tool wear moving the mean, and you ignore it, you fail to correct a special cause. A control chart balances the two errors. Wide limits would reduce false alarms but miss shifts. The conventional three-sigma limits are a practical compromise.
Some processes also have known, systematic drift. Examples are a cutting tool that wears at a steady rate and a chemical bath that depletes. Compensating for drift is legitimate, but only under these conditions:
- The drift is demonstrated by data, not assumed.
- The adjustment is based on a trend estimated over many points, or on a chart signal, and not on the last single measurement.
- The adjustment size matches the estimated drift.
A single measurement also carries measurement error. If the gauge adds its own noise, an apparent miss may be partly the gauge's fault. Adjusting the process for it makes the process worse for no reason.
Practical checklist
- Establish whether the process is stable with a control chart before changing anything.
- Define the reaction for each chart signal in writing, so operators do not improvise.
- Treat an out-of-spec part as a product decision (scrap, rework or accept), not as a process adjustment trigger.
- Review adjustments in the logs. Frequent small corrections right after single readings indicate tampering.
- If the stable process is not capable, change the system and verify the result with new data.
Summary
- Tampering is adjusting a stable process in response to common-cause variation.
- Compensating for each deviation adds the previous deviation to the next output, which raises variance to 2σ² and the standard deviation to about 1.41σ.
- Aiming at the last result produces a random walk with no stable spread.
- Control limits tell you when to act. Inside them, leave the process alone. Outside them, investigate.
- A stable but incapable process needs system improvement, not adjustment.
Exercise
A stable process has a standard deviation of 0.04 mm and specification limits of 9.88 to 10.12 mm, with the mean at 10.00 mm. An operator starts adjusting the machine by the opposite of each measured deviation from 10.00 mm. Estimate the new standard deviation and the new Cp. Does the mean change?
Show answer
The new standard deviation is about 0.04 × √2 ≈ 0.057 mm. The original Cp is (10.12 − 9.88) / (6 × 0.04) = 0.24 / 0.24 = 1.0. The new Cp is 0.24 / (6 × 0.057) ≈ 0.71. The mean stays at about 10.00 mm, so the damage shows only in the spread and in Cp, not in the average.
Exercise
A point on an individuals chart falls inside the control limits but outside the upper specification limit. Should the operator adjust the process? What should happen to the part?
Show answer
No. A point inside the control limits is consistent with common-cause variation, so adjusting the process would be tampering and would increase variation. The part should be handled by the product decision rule (scrap, rework or concession). If this kind of out-of-spec result is too frequent, the stable process lacks capability, and the fix is to improve the process system.