This chapter assumes you can already compute a mean and sample standard deviation. It also assumes you know the normal distribution, Cp and Cpk, and the idea of DPMO (defects per million opportunities). Here you will see where the number 3.4 comes from, what the 1.5 sigma shift assumes, and when the convention is useful or misleading.
The puzzle: six sigma should be far better than 3.4 DPMO
A process is "six sigma" when the nearest specification limit is six standard deviations from the process mean. Suppose the process is perfectly centered and normally distributed. The chance of falling outside a limit six sigma away is about 0.001 parts per million per side. Both sides together give about 0.002 DPMO, which is 2 defects per billion.
The published six sigma figure is 3.4 DPMO, roughly 1,700 times larger. The gap comes from a deliberate assumption: over the long run, the process mean does not stay at the target. The convention assumes it drifts by up to 1.5 short-term standard deviations.
Short-term and long-term performance
Two kinds of data matter here.
- Short-term data is collected over a brief window, such as one shift or one setup. It contains mostly common-cause variation, and its standard deviation is the best case the process can deliver.
- Long-term data is collected over weeks or months. It also contains tool wear, new material lots, operator changes, seasonal temperature and recalibration. Special causes and slow drift move the mean around, so the long-term spread is wider.
The sigma level is quoted from short-term data. DPMO is what customers experience, so it is a long-term figure. The 1.5 sigma shift is the convention that links the two.
The arithmetic
With a shift of 1.5 sigma, the six sigma process has its mean 4.5 sigma from the nearest limit. The probability of exceeding that limit is the upper tail of the standard normal distribution beyond z = 4.5. That tail is 3.40 × 10⁻⁶, or 3.4 per million. The far limit is now 7.5 sigma away. Its tail is about 3 × 10⁻¹⁴, which is negligible, so the convention counts only one tail.
The sigma_level function from the earlier chapters runs this calculation in reverse. It takes the long-term yield, finds its z-score, and adds the shift.
from statistics import NormalDist
def sigma_level(dpmo, shift=1.5):
# Short-term sigma level = z-score of the long-term yield + the conventional shift.
if not 0 < dpmo < 1_000_000:
raise ValueError("dpmo must be between 0 and 1,000,000 (exclusive)")
long_term_yield = 1 - dpmo / 1_000_000
return NormalDist().inv_cdf(long_term_yield) + shift
print(sigma_level(3.4)) # about 6.0
print(sigma_level(66807)) # about 3.0The forward direction starts from a sigma level and computes DPMO, counting both tails so nothing is hidden.
from statistics import NormalDist
def dpmo_from_sigma(level, shift=1.5):
nd = NormalDist()
# Mean has drifted by `shift` toward the upper limit.
upper_tail = 1 - nd.cdf(level - shift)
lower_tail = nd.cdf(-level - shift)
return (upper_tail + lower_tail) * 1_000_000
for level in (2, 3, 4, 5, 6):
print(level, round(dpmo_from_sigma(level), 1), round(dpmo_from_sigma(level, shift=0), 3))The first number on each line is DPMO with the shift. The second is DPMO for a perfectly centered process. At level 6 the output is about 3.4 against about 0.002.
| Sigma level (short-term) | DPMO with 1.5 shift | Long-term yield |
|---|---|---|
| 2 | 308,538 | 69.15% |
| 3 | 66,807 | 93.32% |
| 4 | 6,210 | 99.379% |
| 5 | 233 | 99.977% |
| 6 | 3.4 | 99.99966% |
Each step up the table cuts defects by roughly a factor of 10 to 20 at the lower levels, and by about 70 between five and six. That steepness is why moving from three to four sigma pays off even though both sound "high".
Connecting the shift to Cp and Cpk
A shift of 1.5 sigma translates directly into capability indices. Take a six sigma process, with specification limits at ±6σ from the target.
- Cp = (USL − LSL) / 6σ = 12σ / 6σ = 2.0.
- After drifting 1.5σ, the nearest limit is 4.5σ away, so Cpk = 4.5σ / 3σ = 1.5.
So "six sigma" corresponds to Cp = 2.0 and a long-term Cpk of 1.5. A process with Cpk = 1.5 reports 3.4 DPMO only if the shift assumption holds. That is why the convention is easy to misapply. The shift is a modeling assumption, not a measured quantity.
Where the 1.5 came from
The figure is usually credited to Motorola in the 1980s. Engineers there observed that processes with good short-term control still showed mean drift over long production runs. Bill Smith and Mikel Harry were the main figures who formalized the idea. The 1.5 value was described as an empirical allowance, not a derived constant, and it was meant to give designers a safety margin. Designers specify tolerances so that the short-term process reaches six sigma, which leaves room for drift.
You should know the main criticisms.
- No theory yields exactly 1.5. Real drift differs by process, and some processes drift much less or much more.
- Quoting a "six sigma" level that includes the shift can overstate quality when no shift exists. A process that really is stable at 4.5 sigma would be reported as six sigma.
- The convention hides which tail matters, because it counts only the nearer limit.
- Mixing conventions causes errors. Some textbooks and software report sigma level without the shift. Others add it. The same process can be called 4.5 sigma or 6 sigma depending on the source.
None of this makes the shift useless. It gives a consistent scale for comparing processes, and it forces teams to plan for drift instead of assuming perfect centering.
Common errors
- Double-counting the shift. Adding 1.5 to a sigma level that was already computed from long-term data inflates the result by 1.5.
- Applying the shift to non-normal data. The 3.4 figure comes from the normal tail. A skewed or heavy-tailed process can have a very different DPMO at the same sigma level. Check the distribution first, or count defects directly.
- Confusing DPMO with defective units per million. One unit can contain many opportunities, and DPMO divides defects by total opportunities. A board with 500 solder joints has 500 opportunities.
- Treating 3.4 as a law. Not every process needs six sigma. If a failure costs a few cents, the economics may favor stopping at four or five sigma.
- Using a shift when you can measure drift. If you have long-term data, compute long-term DPMO or Ppk from it. The convention is for planning when only short-term data exists.
Decision criteria
Use the 1.5 shift when:
- You have only short-term data and need a conservative long-term estimate.
- You are comparing processes across a company that already uses the convention.
- You are setting tolerances in design, and want margin for drift.
Skip it, or report both figures, when:
- You have enough long-term data to measure the actual drift.
- The audience is outside Six Sigma and may read "six sigma" as a literal six standard deviations.
- The process is controlled tightly and drifts by far less than 1.5σ.
Link to DMAIC and control charts
The shift ties directly to the earlier chapters. A control chart shows whether special causes are moving the mean, which is the same drift the convention assumes. In DMAIC, the Improve phase reduces short-term spread, and the Control phase keeps the mean from drifting. A project that cuts drift is as valuable as one that cuts spread, because both raise the long-term sigma level. If the control chart shows the mean holding steady, your real long-term performance is better than the convention predicts, and you can report it.
Exercise
A process has a short-term sigma level of 5. Using the 1.5 sigma shift, how many standard deviations is the nearest limit from the drifted mean, and what is the approximate DPMO? What would the DPMO be for a perfectly centered process at the same short-term level, and why is the difference so large?
Show answer
With the shift, the nearest limit is 5 − 1.5 = 3.5 sigma from the mean, giving an upper tail of about 0.000233, or about 233 DPMO (matching the table). A perfectly centered process has limits 5 sigma away on both sides. Each tail is about 2.9 × 10⁻⁷, so the total is about 0.57 DPMO. The difference is large because the normal tail shrinks very quickly with distance. Moving the mean 1.5 sigma closer to one limit changes the tail by a factor of several hundred.
Exercise
A supplier reports "Cpk = 1.5, so we are a six sigma process," based on 30 consecutive parts from one shift. Name two reasons this claim may not mean 3.4 DPMO.
Show answer
First, 30 consecutive parts from one shift are short-term data, so the Cpk reflects only common-cause spread and not later drift. The 3.4 figure assumes a long-term shift of 1.5 sigma applied on top of a short-term Cp of 2.0, but a short-term Cpk of 1.5 already includes any centering error in that sample, so the shift is being counted inconsistently. Second, the 3.4 figure assumes normal data. If the measurements are skewed or have heavy tails, the real defect rate can differ greatly from the normal-theory prediction.