Sub topic 5
Workers Who Join or Leave Midway
Prerequisites and the rate model
Assume you know fractions, reciprocals, ratios, LCM, and the relation:
\[ \text{work}=\text{rate}\times\text{time} \]
A worker’s rate is the fraction of the job completed in one unit of time. If A completes a job in 12 days, A’s rate is \(1/12\) job per day.
When workers act together, add their rates. When a worker leaves, subtract that worker’s rate from the current group rate. The key is to divide the work into time intervals during which the group does not change.
A worker joins midway
Suppose A can complete a job in 12 days, and B can complete it in 18 days. A works alone for 4 days, then B joins A. How long does the whole job take?
Choose the total work as the LCM of 12 and 18:
- Total work \(=36\) units.
- A’s rate \(=36/12=3\) units per day.
- B’s rate \(=36/18=2\) units per day.
A works alone for 4 days:
\[ \text{work completed}=4\times3=12 \]
The remaining work is:
\[ 36-12=24 \]
After B joins, the combined rate is:
\[ 3+2=5\text{ units per day} \]
The remaining 24 units take:
\[ 24/5=4.8\text{ days} \]
Therefore, the total time is:
\[ 4+4.8=8.8\text{ days} \]
The answer can also be written as \(8\frac45\) days.
A worker leaves midway
Suppose A and B together complete a job in 10 days. A alone can complete it in 15 days. They work together for 4 days, and then A leaves. How long does B take to finish the remaining work?
Use one job as the total work:
- Combined rate \(=1/10\) job per day.
- A’s rate \(=1/15\) job per day.
- B’s rate \(=1/10-1/15=1/30\) job per day.
In the first 4 days, A and B complete:
\[ 4\times\frac{1}{10}=\frac25 \]
The remaining work is:
\[ 1-\frac25=\frac35 \]
B completes \(1/30\) of the job per day, so the remaining time is:
\[ \frac{3/5}{1/30}=\frac35\times30=18\text{ days} \]
The total time from the beginning is \(4+18=22\) days.
A systematic table
For complicated questions, list each interval before calculating.
| Interval | Active workers | Rate | Work completed |
|---|---|---|---|
| First 4 days | A | \(3\) units/day | \(4\times3=12\) |
| Next \(x\) days | A and B | \(5\) units/day | \(5x\) |
If the total work is 36 units, form the equation:
\[ 12+5x=36 \]
Thus \(x=24/5\), and the total time is \(4+24/5=44/5\) days.
This table method prevents a common mistake: using the final group rate for the entire job.
Common errors and checks
- Do not add completion times. Add rates.
- Do not subtract a leaving worker’s time. Subtract that worker’s rate.
- Keep units consistent. If rates are per day, every time value must be in days.
- Check that the remaining work is positive.
- The total time should be greater than the initial interval, but it may be less than the time required by the original worker alone if another worker joins.
- If a worker leaves, the remaining time must increase compared with the time at the earlier group rate.
Exercise
A can complete a job in 20 days and B can complete it in 30 days. A works alone for 5 days, then B joins. How many more days are needed?
Show answer
Choose 60 units of work. A completes 3 units per day, so 5 days gives 15 units. The remaining 45 units are completed at \(3+2=5\) units per day, requiring \(45/5=9\) more days.