Sub topic 5
Mapping a Value Stream and Measuring Flow Efficiency
This chapter assumes you understand basic business processes and can read simple ratios. It builds on the Lean ideas of customer value and waste. A value stream is the complete sequence of activities needed to deliver a product or service, including work, decisions, handoffs, and waiting.
What a value stream map shows
A value stream map is a visual representation of how work moves from a customer request to a delivered result. It includes both:
- Information flow, such as orders, schedules, approvals, and status updates.
- Material or work flow, such as parts moving through production or a case moving through a service process.
A process map often focuses on the order of activities. A value stream map also emphasizes time, queues, inventory, and communication. This helps reveal where work spends time without becoming more valuable to the customer.
Start with a current-state map. Observe the process as it operates today rather than documenting the intended procedure. For each step, record:
| Measure | Meaning |
|---|---|
| Processing time | Time someone actively works on the item |
| Waiting time | Time the item spends idle before the next activity |
| Queue or WIP | Items currently waiting or being processed |
| Handoffs | Transfers between people, teams, or systems |
Use a consistent unit, such as hours or days. Include rework loops and approval delays. Omitting them can make the process look faster than it really is.
A simple value stream map
Consider an order that passes through entry, assembly, inspection, and shipping:
The map separates active processing from waiting. That distinction matters because an item may take almost three days to arrive while receiving only four hours of work.
Calculating flow efficiency
Flow efficiency is the proportion of total lead time spent on value-adding work:
\[ \text{Flow efficiency} = \frac{\text{Value-added time}}{\text{Total lead time}} \times 100 \]
Value-added time changes the product or service in a way the customer needs and would recognize as useful. Total lead time includes value-added time and all waiting, queues, transport, inspection, and other elapsed time.
# Each step: (name, value-added hours, waiting hours before the next step)
steps = [
("Order entry", 0.5, 8),
("Assembly", 2, 24),
("Inspection", 0.5, 16),
("Shipping", 1, 7.5),
]
value_added = sum(v for _, v, _ in steps)
waiting = sum(w for _, _, w in steps)
lead_time = value_added + waiting
flow_efficiency = value_added / lead_time
print(f"Lead time: {lead_time} h, flow efficiency: {flow_efficiency:.1%}")
# Lead time: 59.5 h, flow efficiency: 6.7%The process has 4 hours of active work and 55.5 hours of waiting. Its flow efficiency is about 6.7 percent. This does not mean that every waiting period can or should be eliminated. Some inspections, transport, or approvals may be necessary. It does show where investigation is likely to produce the greatest improvement.
Finding improvement opportunities
After mapping the current state, ask:
- Where does work wait the longest?
- Which queue contains the most items?
- Where do handoffs create delays or errors?
- Which steps cause rework?
- Can adjacent steps be synchronized?
- Does a batch need to be smaller?
A future-state map describes a proposed better flow. Change one constraint at a time where possible, then measure lead time, flow efficiency, quality, and delivery reliability. A shorter lead time is not an improvement if defects or customer complaints increase.
Exercise
A process has 6 hours of value-added work and 42 hours of waiting. What are its total lead time and flow efficiency?
Show answer
Total lead time is 48 hours. Flow efficiency is 6 ÷ 48 = 12.5%.