Sub topic 2
Seeing Value and Waste in a Process
Assume you can read a simple process flow, measure time and counts, and distinguish continuous improvement from a large project. You should also know that a process has customers, inputs, outputs, and people who perform the work.
A kaizen event improves a process by making work easier, faster, safer, or more reliable. To choose useful changes, first separate value-added work from waste.
Value-added and non-value-added work
Value-added work changes the product or service in a way the customer needs and would recognize as worthwhile. It must also be done correctly the first time.
For example, entering a customer order into the approved order system may be value-added because it creates the record needed to fulfill the order.
Non-value-added work consumes time or resources without changing the output in a way the customer needs. Waiting, searching, re-entering information, and correcting errors are common examples.
Some non-value-added work is required by regulation, safety, accounting, or the current system. A compliance check may not add value from the customer's view, but the organization still must perform it. Mark this work as necessary but non-value-added. The team should reduce its effort without removing the control.
| Work step | Customer value | Classification | Possible improvement |
|---|---|---|---|
| Confirm the order details | Prevents incorrect fulfillment | Necessary control | Use a required field checklist |
| Wait for approval in a queue | Does not change the order | Waste | Set an approval time limit |
| Enter the same address twice | No new customer benefit | Waste | Reuse the existing data |
| Send the final confirmation | Gives the customer needed information | Value-added | Use a clear standard template |
The eight common wastes
Lean teams often remember waste with the acronym DOWNTIME:
- Defects: errors, rework, or incorrect outputs
- Overproduction: making or processing more than needed
- Waiting: people, materials, or information sitting idle
- Non-used talent: failing to use people's knowledge and skills
- Transportation: unnecessary movement of materials or information
- Inventory: excess work, materials, or unfinished requests
- Motion: unnecessary movement by people
- Extra processing: work that adds no required customer value
Waste can hide inside a normal-looking process. A worker who searches three systems for an order may appear busy, but the search is still waste. A pile of unprocessed requests is inventory, even when no physical goods are present.
Observe the process, not the job description
During a kaizen event, follow the actual work from start to finish. Record what happens, how long each step takes, and where the work waits. Do not classify an entire role or department as waste. Classify specific activities and conditions.
Use waste to guide the event
Do not remove a step only because it is slow. Ask what risk the step controls and what the customer needs. A good countermeasure preserves required quality and safety while reducing delay, repetition, movement, or variation.
At the start of the event, create a current-state view. Mark each step as value-added, necessary non-value-added, or pure waste. This view gives the team a shared fact base and helps it focus on the largest opportunities.
Exercise
An order waits two hours for a supervisor's signature, although the supervisor approves every order of this type. How should the team classify the delay, and what should it investigate?
Show answer
Classify it as waiting, a form of non-value-added work. Investigate whether the approval rule is still needed, whether approval can be delegated, and whether a faster control can provide the same protection.