Sub topic 6
Measuring the Current State
Assume you can read a simple process flow, understand basic waste and continuous improvement, and calculate time and counts. This chapter uses those skills to build a factual picture of a process before changing it.
A current-state measure answers three questions:
- How long does the process take?
- How much work can the process complete?
- Where does time pass without adding value?
Do not use measurements to blame people. Use them to compare the process before and after the kaizen event.
Define the measures
Lead time is the elapsed time from the process start to the process end, including waiting. For order entry, lead time might run from receipt of an order to the confirmation sent to the customer.
Cycle time is the time needed to complete one process step or one unit of work. Record whether cycle time includes only active work or also waiting. Teams often cause confusion by using the term differently.
Takt time is the pace required to meet customer demand. It is calculated as available work time divided by customer demand.
Process cycle efficiency (PCE) is the share of total lead time spent on value-added work. Value-added work changes the product or service in a way the customer needs and would recognize as worth paying for.
| Measure | Calculation | Example |
|---|---|---|
| Lead time | End timestamp − start timestamp | 240 minutes |
| Cycle time | Active work time per unit | 12 minutes |
| Takt time | Available time ÷ demand | 5.0 minutes per unit |
| PCE | Value-added time ÷ lead time | 5% |
Non-value-added work includes waiting, rework, searching, handoffs, and unnecessary movement. Some non-value-added work may be required by regulation or safety. Record it separately instead of assuming that every delay can be removed.
Create a measurement plan
Before collecting data, define each measure in writing. Include the start event, end event, unit of measure, data source, sample size, and owner. Use the same definitions throughout the event.
For example, the order-entry team might define its measurement plan as follows:
- Start: timestamp when an order reaches the shared inbox.
- End: timestamp when confirmation is sent to the customer.
- Sample: the last 30 completed orders.
- Additional fields: order type, active work minutes, waiting minutes, rework count, and reason for delay.
- Owner: the order-entry supervisor.
Use actual observations when system timestamps are incomplete. Observe several examples across different shifts or order types. Record the range, median, and unusual cases. The median is often more useful than the average when a few orders take much longer than the rest.
Map the current state
A current-state map shows the process as it works today. Include process steps, queues, handoffs, information flow, and measured times. Do not draw the process as it is supposed to work.
Add timestamps and counts to the map. If the map says that 240 minutes of lead time contains 12 minutes of active work, the team can investigate the remaining 228 minutes instead of guessing.
Calculate a baseline
The following script calculates the baseline measures for one process. Run it before the event and again after the trial.
# Baseline measures for an order-entry process
available_minutes_per_day = 450
daily_demand_units = 90
value_added_minutes = 12
lead_time_minutes = 240
takt_minutes = available_minutes_per_day / daily_demand_units
pce = value_added_minutes / lead_time_minutes
print(f"Takt time: {takt_minutes:.1f} minutes per unit")
print(f"Process cycle efficiency: {pce:.0%}")The output is a takt time of 5.0 minutes per unit and a PCE of 5%. These numbers do not prove that the process is capable of meeting demand. They provide a baseline for further investigation. Compare like with like after the event: use the same scope, definitions, demand conditions, and data method.
Exercise
A process has 300 minutes of lead time and 15 minutes of value-added work. What is its process cycle efficiency, and what should the team investigate first?
Show answer
Its PCE is 15 ÷ 300 = 5%. The team should investigate the 285 minutes of waiting and other non-value-added time, then verify that the measurement definitions are consistent.