Sub topic 1
Why Prioritising Features Is Hard
Prerequisites
This chapter assumes you already know the following:
- Basic product management vocabulary: feature, backlog, roadmap, stakeholder.
- Simple arithmetic and how to use a spreadsheet.
- How product and engineering teams estimate work, for example in story points or person-weeks.
You do not need to know RICE yet. This chapter explains the problem that RICE is meant to solve. The next chapters introduce the framework itself.
The problem in one sentence
A team can build only a small fraction of the ideas it has. Deciding which ones to build, and in what order, is a decision under scarcity and uncertainty, and it is usually made with incomplete information and competing interests.
Almost every product team has the same situation:
- The backlog holds more work than the team can finish in a year.
- Every item has someone who believes it is important.
- Nobody knows for certain what any item will deliver.
- Building one thing means not building another.
Prioritisation is the practice of ordering the backlog so that limited time goes to the work with the best expected return. It sounds simple. In practice, several forces make it hard.
Why it is hard
Capacity is fixed, demand is not
Engineering capacity grows slowly. Ideas arrive quickly, from customers, sales, support, executives, analytics and the team itself. The backlog therefore tends to grow faster than it shrinks. Every "yes" has an opportunity cost: the best alternative you gave up. Teams that ignore opportunity cost end up building whatever was requested most recently or most loudly.
Value is hard to measure in advance
You are estimating the future. Before a feature ships, you have no direct measurement of how many people will use it or how much it will change their behaviour. You have proxies: survey results, support ticket counts, analytics on related features, comparable launches. Each proxy is imperfect.
Different people value different things
Stakeholders optimise for their own goals:
| Stakeholder | Likely preference |
|---|---|
| Sales | Features that close a specific deal this quarter |
| Support | Fixes that reduce ticket volume |
| Engineering | Reducing technical debt, improving reliability |
| Executives | Features tied to the company strategy or a board commitment |
| Customers | Whatever solves their own problem right now |
None of these preferences is wrong. They are just not directly comparable. Without a shared method, the outcome depends on who argues best or who has the most seniority.
Costs are underestimated and benefits are overestimated
Teams are consistently optimistic about their own ideas. A well-known pattern called the planning fallacy says people underestimate the time and cost of a task, even when they know similar tasks ran over before. At the same time, the person proposing a feature tends to overstate how many users it will reach and how much they will care. Both errors push in the same direction: a proposal looks better than it is.
Costs and benefits come in different units
Compare these three ideas:
- A feature that saves 5,000 users about two minutes a week.
- A feature that might win one large enterprise contract.
- A refactor that makes the next six features faster to build.
The benefits are time saved, revenue and future speed. You cannot add them up directly. Prioritisation requires a common scale, even an approximate one, to compare them at all.
What happens without a method
Teams without a consistent method tend to fall into recognisable patterns.
- HiPPO decisions. The Highest Paid Person's Opinion wins. The result is predictable but not necessarily good.
- Squeaky wheel. The customer or team that asks most often gets served first.
- Recency bias. The last conversation or the last lost deal drives the roadmap.
- Pet projects. Ideas with a passionate sponsor skip the queue.
- Everything is a priority. When ten items are all marked "high", the label carries no information.
- Roadmap by consensus. Everyone gets a little of what they wanted, and nothing is done well.
These patterns share a root cause. The criteria for a decision are implicit, so they cannot be examined, challenged or improved.
What a good prioritisation method needs
A useful method does not have to be perfect. It needs a few properties:
- Consistency. The same criteria apply to every item, so two ideas can be compared fairly.
- Transparency. Anyone can see why an item ranked where it did, and can disagree with a specific input rather than with the outcome.
- Separation of factors. Benefit, cost and uncertainty are estimated separately. Mixing them hides where the disagreement is.
- Quantification where possible. Numbers force you to state assumptions, even if the numbers are rough.
- Low enough cost to use. If scoring a backlog takes weeks, nobody will do it.
- Robustness to uncertainty. The method should make it visible when a ranking depends on a shaky guess.
No method gives a single correct answer. The goal is better and more defensible decisions, made faster, with the reasoning written down.
Where RICE fits
RICE is a scoring framework built around four factors:
- Reach: how many people the feature affects in a given time period.
- Impact: how much it changes things for each of those people.
- Confidence: how sure you are about the Reach and Impact estimates.
- Effort: how much total team time the work needs.
It combines them into a single number: (Reach × Impact × Confidence) / Effort. Higher scores indicate more expected value per unit of cost.
RICE addresses the needs above in specific ways:
| Need | How RICE responds |
|---|---|
| Common scale | Every item is reduced to the same four inputs and one score |
| Separate benefit, cost and uncertainty | Reach and Impact measure benefit, Effort measures cost, Confidence discounts for uncertainty |
| Transparency | Each input can be reviewed and challenged on its own |
| Optimism bias | Confidence penalises ideas that rest on weak evidence |
| Opportunity cost | Dividing by Effort favours work that delivers more per person-month |
The rest of this tutorial covers each factor in detail, then the calculation, how to read the ranking, how to test it, and where it fails.
A small illustration of the problem
Suppose a team has capacity for roughly one of the following in the next quarter. A product manager has made notes on each.
- Single sign-on: requested by several large customers, about 2,000 users would use it, about four person-months of work.
- Onboarding checklist: would help new sign-ups, about 500 users per quarter, about two person-months of work.
- Dark mode: widely requested on social media, 8,000 users could use it, about five person-months of work.
Which one should the team build first?
Using intuition alone, many teams would pick dark mode because it has the largest audience and visible demand. Others would pick single sign-on because enterprise customers are paying. A third group would argue for the checklist because it is cheapest. Each answer is defensible. None of them is based on a shared calculation.
The next chapters build the tools to answer the question with explicit numbers. As a preview, here is a rough sketch of the idea in code. It ranks the three features by only one factor each, to show how much the answer changes with the criterion you choose.
features = {
"Single sign-on": {"reach": 2000, "effort": 4},
"Onboarding checklist": {"reach": 500, "effort": 2},
"Dark mode": {"reach": 8000, "effort": 5},
}
by_reach = sorted(features, key=lambda n: features[n]["reach"], reverse=True)
by_effort = sorted(features, key=lambda n: features[n]["effort"])
by_reach_per_effort = sorted(
features,
key=lambda n: features[n]["reach"] / features[n]["effort"],
reverse=True,
)
print("By reach: ", by_reach)
print("By lowest effort: ", by_effort)
print("By reach per effort:", by_reach_per_effort)Running it prints:
By reach: ['Dark mode', 'Single sign-on', 'Onboarding checklist']
By effort: ['Onboarding checklist', 'Single sign-on', 'Dark mode']
By reach per effort: ['Dark mode', 'Single sign-on', 'Onboarding checklist']The winner changes depending on the single criterion. Reach alone ignores how much each user benefits. Effort alone ignores how many people benefit. Even reach per effort ignores that being able to toggle a colour theme matters much less to a user than a checklist that helps them finish setup. A good method has to weigh all of these together, and it has to account for how sure you are about each number.
Common misconceptions about prioritisation
- "A scoring model makes the decision for us." It does not. It organises evidence and exposes assumptions. People still decide.
- "If the numbers are guesses, scoring is pointless." Guesses written down can be compared, challenged and revised. Guesses kept in people's heads cannot.
- "We should only build the top-scoring item." Scores ignore dependencies, strategy, deadlines and risk. You will see later how to combine scores with those factors.
- "More precision means a better decision." Estimates built from rough evidence do not become accurate because the arithmetic has many decimal places. This is called false precision, and later chapters return to it.
- "Prioritising is a one-off task." Estimates go stale as you learn. Good teams re-score regularly.
Where this chapter leads
You now have the problem statement: limited capacity, uncertain value, competing interests, and optimistic estimates. You also have a checklist of what a method should provide. The next chapter defines RICE formally and walks through the formula. After that, four chapters cover Reach, Impact, Confidence and Effort one at a time.
Exercises
Exercise
Name three properties a good prioritisation method should have, and explain why "Separation of factors" matters when a team disagrees about a ranking.
Show answer
Any three of: consistency, transparency, separation of factors, quantification where possible, low cost to use, robustness to uncertainty. Separation of factors matters because benefit, cost and uncertainty are estimated independently. When people disagree, they can see which input differs, for example whether one person thinks the effort is higher or the impact is lower. They can then discuss that specific estimate instead of arguing about the whole idea.
Exercise
A sales director says a feature must be built first "because it is our top priority." What problem from this chapter does this illustrate, and what question would you ask to turn the claim into something comparable with other backlog items?
Show answer
It illustrates the HiPPO or squeaky-wheel pattern, where the criteria are implicit and the decision follows seniority or volume. A useful question is: "How many customers or users would this affect in a given period, and how much would it change things for each of them?" That asks for reach and impact in terms that can be compared with other ideas, along with the evidence behind them.
Exercise
In the code example, "Dark mode" ranks first by reach and by reach per effort, but "Onboarding checklist" ranks first by effort. What does this show about using a single criterion to prioritise?
Show answer
It shows that the ranking depends on which criterion you pick, so a single criterion can lead to a very different decision. Reach ignores the benefit per person and the cost. Effort ignores benefit entirely. Even reach per effort leaves out how much each person gains. A method has to combine benefit, cost and confidence to compare features fairly.