Sub topic 10
Common biases and pitfalls
This chapter assumes you can calculate a RICE score as (Reach × Impact × Confidence) / Effort and rank a backlog by it. It also assumes you have seen sensitivity analysis, where you change one estimate and watch whether the ranking moves. Here we look at where the method misleads, why it happens, and what to do about each case.
RICE turns judgement into a number. The number looks objective, but every input is an estimate made by a person. Most failures come from that gap between how precise the output looks and how uncertain the inputs are.
Why the formula hides bias
The score multiplies three inputs and divides by a fourth. Multiplication has two properties that matter here.
- Errors compound. If Reach is overestimated by 50% and Impact by 50%, the score is overestimated by 125%, because 1.5 × 1.5 = 2.25.
- Every input carries equal structural weight. A small change in Effort moves the score as much as the same proportional change in Reach.
So a bias that looks minor on one input can reorder a backlog once it combines with others. The sections below cover the most common sources.
Inflated estimates
People who propose a feature usually want it built. Without noticing, they pick the optimistic end of each range. This is optimism bias, and it is strongest when the person scoring is also the person advocating.
The effect is uneven across the backlog. Ideas championed by a senior stakeholder or a vocal customer tend to get higher Reach and Impact than quiet ideas with the same real value. The ranking then reflects who argued hardest.
Mitigations:
- Separate proposing from scoring. The author describes the idea, and a different person or a small group assigns the numbers.
- Require a stated source for Reach. "About 2,000 users per quarter, from the analytics export of last quarter's active accounts" is acceptable. "A lot of users" is not.
- Score as a group, with each person writing a number before anyone speaks, then discuss the gaps.
Anchoring
Anchoring is when the first number mentioned pulls every later estimate toward it. If someone says "that is about two months of work," estimates from the rest of the room cluster around two, even if nobody has looked at the design.
Anchoring also happens across features. Once one item is scored as Impact 3, the next item gets compared to it instead of to the scale definition.
Mitigations:
- Collect estimates independently and reveal them together.
- Keep a written scale with one example per level, such as "Impact 2 = reduces time to complete the core task by about a third." Score against the written scale, not against other features.
- Re-score one or two earlier items at the end of a session. Large changes show that the early scores were anchors.
The planning fallacy and Effort
The planning fallacy is the tendency to underestimate the time and cost of a task even when you know that similar tasks ran over. Effort is the divisor, so underestimating it inflates the score directly. A feature estimated at 2 person-months that really takes 4 has a score twice as high as it should.
Two common errors make this worse:
- Counting only engineering time. Design, quality assurance, documentation, data migration, support training and launch work all belong in Effort.
- Estimating the happy path. Edge cases, review cycles and rework are real costs.
Mitigations:
- Ask the engineers who will build it, not the person who proposed it.
- Compare against past delivery. If your team's work historically takes 1.5 times the estimate, apply that factor or at least record it.
- Estimate with a range, then use the upper-middle value instead of the best case.
Confidence used as a fudge factor
Confidence is meant to discount scores that rest on weak evidence. In practice it is often set last, after the team already knows which feature it prefers. A favoured feature gets 100% and a disliked one gets 50%.
This is a form of motivated reasoning, where the evidence is read to support a conclusion already chosen. It defeats the purpose of the factor.
Mitigations:
- Tie each Confidence level to evidence, not to feeling. For example: 100% means measured data or a validated prototype, 80% means several customer interviews or comparable past launches, 50% means opinion or a single anecdote.
- Set Confidence before computing the score, and do not change it after seeing the ranking.
- When Confidence is low, treat the next step as research. A cheap test that raises Confidence is often worth more than building the feature.
False precision
A score of 812.5 suggests a real difference from 800. It is not. If Reach could plausibly be 1,500 or 2,500, the score has a very wide range, and differences of a few percent mean nothing.
Two habits cause this. One is reporting scores with decimals. The other is treating a ranking as strict when neighbouring scores are close.
The following code shows how little it takes to reorder items. It reuses the sample backlog, then changes one estimate by a modest amount.
from dataclasses import dataclass
@dataclass
class Feature:
name: str
reach: float
impact: float
confidence: float
effort: float
@property
def rice(self) -> float:
return self.reach * self.impact * self.confidence / self.effort
def ranking(features):
return [f.name for f in sorted(features, key=lambda f: f.rice, reverse=True)]
base = [
Feature("Single sign-on", 2000, 2, 0.8, 4),
Feature("Onboarding checklist", 500, 3, 1.0, 2),
Feature("Dark mode", 8000, 0.5, 0.5, 5),
]
print("Base: ", ranking(base))
# Single sign-on takes 5.5 person-months instead of 4.
slipped = [
Feature("Single sign-on", 2000, 2, 0.8, 5.5),
Feature("Onboarding checklist", 500, 3, 1.0, 2),
Feature("Dark mode", 8000, 0.5, 0.5, 5),
]
print("Slipped:", ranking(slipped))The base scores are 800, 750 and 400. With Effort at 5.5, single sign-on drops to about 582, and the onboarding checklist moves to first place. A 37% overrun on one input changed the top item. When the top two scores are within about 10% of each other, treat them as tied and decide on other grounds.
Practical rules:
- Round scores to two significant figures, or to the nearest 50 in a backlog of this size.
- Group items into bands, such as "clearly high," "middle" and "clearly low," instead of reading the exact order.
- Show ranges, such as a low and high score computed from pessimistic and optimistic inputs.
Mismatched scales
RICE only compares items if every item uses the same units. Several things break this.
- Reach measured over different periods. One feature counts users per quarter and another counts users per year, which makes the second look four times smaller or the first four times larger depending on direction.
- Reach measured on different populations. "Active users" for one feature and "all registered accounts" for another are not comparable.
- Impact applied to different outcomes. One item's Impact is about revenue, another's is about satisfaction. The 0.25 to 3 scale does not convert between them.
- Effort in different units, such as story points for one team and person-months for another.
Mitigations:
- Fix one Reach period and one population definition for the whole planning cycle, and write them at the top of the spreadsheet.
- Pick one goal per cycle and judge Impact against it. If the goal is retention, an item's Impact answers "how much does this change retention for each person reached?"
- Convert all Effort to person-months before scoring.
Reach versus Impact confusion
Large Reach with tiny Impact can outscore small Reach with large Impact. Dark mode in the sample backlog reaches 8,000 people, but at Impact 0.5 it ends up last. This is correct arithmetic, but it can hide a different problem: the Impact scale is coarse, so the choice between 0.5 and 1 is a judgement call that doubles the score.
Another trap is counting people who touch a feature but never benefit. Reach should be the number of people who will experience the change, not the number who could see the screen.
Ignored strategy and dependencies
RICE scores one item at a time. It does not know about:
- Strategy. A feature that opens a new market may score poorly in the current user base because Reach is small today.
- Dependencies. A low-scoring item might be required before three high-scoring ones can ship.
- Risk and obligation. Security fixes, legal requirements and contract commitments must be done regardless of score.
- Portfolio balance. Ranking by score alone can fill a quarter with small quick wins and leave no capacity for a larger bet.
Mitigations:
- Handle must-do work first and put it outside the ranking. Allocate remaining capacity to scored items.
- Mark dependencies on the backlog and plan enabling work together with what it unlocks. Score the pair as one item, adding the Effort and summing the benefits.
- Reserve a fixed share of capacity, for example 20%, for strategic bets that the formula undervalues.
Gaming
Once people know the score drives decisions, they adjust inputs to reach the outcome they want. This is not always dishonest. It can happen through repeated small nudges, such as rounding Reach up or choosing the generous Impact level.
Warning signs:
- One team's items cluster at the top across several cycles.
- Confidence is almost always 80% or 100%.
- Estimates change after scores are visible.
- The ranking matches what was already planned.
Mitigations:
- Record the inputs and their sources, so reviewers can challenge them.
- After launch, compare predicted and actual Reach and Impact. Teams that see their own prediction error improve quickly.
- Keep scoring and approval with different people where you can.
A review checklist
Use this before presenting a ranking.
| Check | Question to ask |
|---|---|
| Source | Does each Reach number cite data or a stated assumption? |
| Scale | Are Reach period, population, Impact goal and Effort unit the same for every item? |
| Effort | Does Effort include design, testing, rollout and support, and was it set by the builders? |
| Confidence | Is each level tied to a kind of evidence, and was it set before the score was computed? |
| Stability | Does the order survive a 25% change in the most uncertain input? |
| Closeness | Are near-ties treated as ties? |
| Context | Are mandatory work, dependencies and strategy handled outside the score? |
Summary
Every bias in this chapter comes from the same place: inputs that are guesses, combined by a formula that looks exact. Optimism and anchoring inflate Reach and Impact. The planning fallacy shrinks Effort. Confidence gets bent to match preferences. Mismatched scales make scores incomparable. And the formula ignores strategy and dependencies. You cannot remove these effects, but you can limit them with independent scoring, written scales, evidence-linked Confidence, bands instead of exact ranks, and a stability check before any decision.
Exercise
A backlog has two items. Item A: Reach 1,200 per quarter, Impact 2, Confidence 0.8, Effort 3 person-months. Item B: Reach 900 per quarter, Impact 2, Confidence 1.0, Effort 2.5 person-months. Compute both scores. Then say whether the ranking is reliable if Item B's real Effort turns out to be 3.5 person-months, and name the bias that most likely caused the error.
Show answer
Item A = 1200 × 2 × 0.8 / 3 = 640. Item B = 900 × 2 × 1.0 / 2.5 = 720, so B ranks first. If B's Effort is 3.5, its score is 900 × 2 × 1.0 / 3.5 ≈ 514, which is below A's 640, so the order flips. The original gap (720 vs 640, about 12%) is small, so the ranking is not reliable and the two should be treated as near-tied. The bias most likely responsible is the planning fallacy, which underestimates Effort. The estimate may also have been affected by anchoring or by Confidence set at 1.0 without hard evidence.
Exercise
Your team scores a backlog and notices that nearly every item has Confidence of 80% or 100%, and the top-ranked item is the one the head of product proposed last month. List three concrete steps you would take to check whether the scoring is biased.
Show answer
Any three of these are acceptable. (1) Define Confidence levels by evidence type, such as measured data for 100% and opinion for 50%, then re-assign levels against that definition. (2) Have people who did not propose the item score its Reach and Impact independently, and compare their numbers with the original ones. (3) Run a sensitivity check on the top item's most uncertain input and see whether its rank holds. (4) Ask for the source of each Reach number. (5) After launch, compare predicted and actual results and log the difference.