Sub topic 8
Reading the ranking: scores are relative, not absolute
This chapter assumes you can already calculate a RICE score as (Reach × Impact × Confidence) / Effort, as covered in the previous chapter. It also assumes you know what a backlog is and how a team uses one. The chapter is about what to do with the numbers once you have them.
What a RICE score actually is
A RICE score is a unitless index. Reach is in people per period, Impact is on a point scale, Confidence is a fraction, and Effort is in person-months. The result looks like "800", but it is not 800 users, 800 dollars, or 800 anything. The number has no meaning outside the set of features you scored together.
Three consequences follow:
- A score is only meaningful next to other scores calculated with the same scales, the same Reach period and the same Effort unit.
- The useful information is the order and the size of the gaps, not the absolute value.
- A score of 800 does not mean "good" and a score of 50 does not mean "bad". Last quarter's 800 and this quarter's 800 are not comparable unless the inputs were defined identically.
The sample backlog from this tutorial shows this.
| Feature | Reach | Impact | Confidence | Effort | RICE |
|---|---|---|---|---|---|
| Single sign-on | 2000 | 2 | 0.8 | 4 | 800 |
| Onboarding checklist | 500 | 3 | 1.0 | 2 | 750 |
| Dark mode | 8000 | 0.5 | 0.5 | 5 | 400 |
Single sign-on ranks first, but the number 800 says nothing on its own. It says only that, under these inputs, single sign-on comes out slightly ahead of the onboarding checklist and about twice as high as dark mode.
Rank is not the whole story: look at the gaps
A sorted list hides distances. Positions 1 and 2 could be separated by 6% or by 600%. The ordinal rank looks identical in both cases, but the decision you should make is very different.
The gap between 800 and 750 is 50 points, or about 6% of the leader. Your inputs are estimates. Reach might be off by 20%, and Impact is picked from five coarse levels. A 6% difference is well inside that noise, so treat these two features as tied. The gap between 750 and 400 is about 47%. That is large enough that it would take a sizeable estimation error to reverse it.
Two useful measures for every row:
- Percent of the top score, which shows how far a feature sits from the leader.
- Gap to the next feature, which shows how fragile its position is.
Grouping features into tiers
Instead of treating the list as a strict order, group scores that are close together into tiers. Within a tier you decide using other information. Between tiers, the score order is a reasonable default.
The script below computes percent of top, gap to the next row, and a tier number. A feature starts a new tier when its score falls more than a chosen tolerance below the first score of the current tier. The tolerance is a judgement call. Start with something like 15 to 25%, which reflects how noisy your estimates are.
from dataclasses import dataclass
TOLERANCE = 0.15 # scores within 15% of a tier's top score share the tier
@dataclass
class Feature:
name: str
reach: float # people or events per time period, e.g. users per quarter
impact: float # 3 massive, 2 high, 1 medium, 0.5 low, 0.25 minimal
confidence: float # 1.0 high, 0.8 medium, 0.5 low
effort: float # person-months
@property
def rice(self) -> float:
return self.reach * self.impact * self.confidence / self.effort
features = [
Feature("Single sign-on", reach=2000, impact=2, confidence=0.8, effort=4),
Feature("Onboarding checklist", reach=500, impact=3, confidence=1.0, effort=2),
Feature("Dark mode", reach=8000, impact=0.5, confidence=0.5, effort=5),
]
rows = sorted(features, key=lambda f: f.rice, reverse=True)
top = rows[0].rice
tier = 1
tier_top = top
for i, f in enumerate(rows):
if f.rice < tier_top * (1 - TOLERANCE):
tier += 1
tier_top = f.rice
pct_of_top = f.rice / top * 100
if i + 1 < len(rows):
gap = (f.rice - rows[i + 1].rice) / f.rice * 100
gap_text = f"{gap:.0f}%"
else:
gap_text = "-"
print(
f"{i + 1}. {f.name:<22} {f.rice:>5.0f} {pct_of_top:>5.0f}% of top"
f" gap {gap_text:>4} tier {tier}"
)
# 1. Single sign-on 800 100% of top gap 6% tier 1
# 2. Onboarding checklist 750 94% of top gap 47% tier 1
# 3. Dark mode 400 50% of top gap - tier 2The output says that single sign-on and the onboarding checklist are one decision, and dark mode is clearly behind both. A plain ranked list would have shown three separate steps.
Tiers are anchored to the first score in the tier. This avoids a chain effect where 100, 90, 81 and 73 all land in one tier because each is within 10% of its neighbour, even though the last is 27% below the first. The anchored rule has its own edge behaviour. A feature just outside the tolerance starts a new tier even though it is only slightly lower than the one before it. Treat tier boundaries as a prompt for discussion, not as a hard line.
Why absolute values mislead
Here are the most common ways people misread a ranking. Each comes from treating a relative index as an absolute measure.
| Misreading | Why it fails | Better practice |
|---|---|---|
| "Anything above 500 gets built" | The scale depends on Reach units and Effort units. Change Reach from per quarter to per year and every score multiplies by about four. | Pick cutoffs from team capacity, not from a fixed score. |
| "Last quarter's top score was 1200, so 800 is weak" | Different quarters use different inputs, different candidate sets and often a different Reach window. | Compare only within one scoring session. |
| "Score is ROI" | RICE has no money in it. Impact is a coarse scale and Effort ignores ongoing costs. | Use RICE for ordering, and do a separate business case if you need a financial return. |
| "Feature A scores 20% higher than B, so it is 20% more valuable" | The score is a ratio of rough estimates. The difference may come entirely from one input guess. | Use the gap only to judge whether the order is stable. |
| "Average the scores across teams" | Teams may use different scales and period definitions. | Normalise inputs first or keep the rankings per team. |
| "The rank order is the build order" | Dependencies, shared platform work and deadlines can force a different order. | Treat the order as an input to sequencing. |
Scale changes: what preserves the ranking and what does not
Some changes to inputs leave the order unchanged, and some do not. Knowing the difference helps you decide whether a rescaling is harmless.
A change that multiplies one factor by the same constant for every feature leaves the order unchanged. Switching Reach from users per quarter to users per year multiplies every Reach by four, so every score multiplies by four and the ranking is identical. Switching Effort from person-months to person-weeks multiplies every Effort by about four, so every score is divided by about four. Again the ranking is identical.
A change that treats features differently can reorder the list. Suppose you measure Reach as monthly active users for one feature and as signups per quarter for another. The scores are then not on a common basis. The same problem appears when you change the Impact scale for some items only. The ranking is meaningful only if all features were scored with the same definitions.
A quick check: if you could convert every feature's input with a single multiplication, the ranking is safe. If you would need a different conversion per feature, it is not.
The cutoff line comes from capacity
A ranked list needs a cutoff, and the cutoff should come from outside the scores. If your team has 12 person-months of capacity next quarter, you walk down the list adding Effort until you reach 12. That cumulative total defines the line.
Here is a short check you can run after the ranking:
capacity = 6.0 # person-months available next quarter
used = 0.0
for f in rows:
if used + f.effort <= capacity:
used += f.effort
print(f"Build: {f.name} ({f.effort} person-months, total {used})")
else:
print(f"Defer: {f.name} ({f.effort} person-months)")
# Build: Single sign-on (4 person-months, total 4.0)
# Build: Onboarding checklist (2 person-months, total 6.0)
# Defer: Dark mode (5 person-months)This snippet reuses rows from the previous script. It makes a point that the score alone hides. When you have limited capacity, the cutoff may fall in the middle of a tied tier. Here the line fell cleanly between tiers. If capacity had been 4, you would have had to choose between two features whose scores differ by 6%. That is the moment to use judgement, such as strategic fit, customer commitments or technical dependencies.
The simple walk above is greedy and stops being optimal in some cases. A large item can block a smaller item that would have fit. Check that you are not leaving capacity unused because of a big item near the top.
Using the ranking in a conversation
The ranking works best as the start of a discussion. Some habits help:
- Show the score, the percent of top and the tier, not only the rank number.
- State the tolerance you used, so others can challenge it.
- For each tied tier, name the tie-breaker out loud, such as "this one unblocks the platform migration" or "this one has a contractual date".
- Flag any feature whose position depends on one low-confidence input. The next chapter shows how to test that formally.
- Record the inputs next to the scores, so a later reader can tell whether a comparison is valid.
Edge cases worth knowing
- Very small Effort. Because Effort is the divisor, a feature with an Effort of 0.25 person-months can score very high even with modest Reach and Impact. Check that small estimates are real and not rounded down. A tiny effort that actually hides integration work distorts the whole list.
- Zero or missing inputs. A zero Effort makes the score undefined, and a zero Confidence zeroes the score. Reject both at entry instead of letting them sort to the top or bottom silently.
- Single-item tiers at the top. One feature far ahead of everything else is a strong signal. It may also be a sign that one input was inflated, so inspect its inputs before celebrating.
- A long flat list. If most scores sit within 10% of each other, RICE is not helping you separate them. Use strategy or another framework to decide.
- Rounding. Reporting 800.4 versus 799.9 implies precision that does not exist. Round to two significant figures when you show results.
Summary of the working model
Treat the sorted list as a map of rough distances. Large gaps are real signals. Small gaps are ties to be resolved with other knowledge. The numbers belong to one scoring session and one set of definitions. The cutoff comes from capacity, not from a magic score. The next chapter takes the same ranking and tests how much the order changes when the uncertain inputs move.
Exercise
A backlog has three features scored 900, 840 and 500 in one session. You use a 15% tolerance, anchored to the first score of each tier. Which tier does each feature fall in, and what is the gap between the first and second feature as a percent of the first?
Show answer
The first feature (900) starts tier 1. The threshold is 900 × 0.85 = 765. The second feature (840) is above 765, so it is also in tier 1. The third (500) is below 765, so it starts tier 2. The gap between the first and second is (900 − 840) / 900 ≈ 6.7%. The first two are effectively tied.
Exercise
Your team switches Reach from "users per quarter" to "users per year" for every feature, and leaves Impact, Confidence and Effort unchanged. What happens to the scores and to the ranking? What would change if you switched the Reach period for only one feature?
Show answer
Every score is multiplied by about four (the exact factor depends on how you convert, for example 4 quarters per year). The ranking is unchanged, because all scores scale by the same constant and the percent gaps stay the same. If only one feature changed period, its score would be inflated relative to the others and could jump up the ranking without any real change in value. The scores would no longer be comparable.
Exercise
You have 4 person-months of capacity. Using the sample backlog (single sign-on at 800 and 4 person-months, onboarding checklist at 750 and 2 person-months, dark mode at 400 and 5 person-months), what does the greedy capacity walk build, and why is that a decision for judgement rather than for the score alone?
Show answer
The walk adds single sign-on (4 person-months), which uses all capacity, so the onboarding checklist (2) and dark mode (5) are deferred. The scores of 800 and 750 differ by only about 6%, so they are a tied tier. Choosing single sign-on over the onboarding checklist, which would leave 2 person-months free, depends on factors outside the score, such as strategic fit, dependencies, or whether the spare capacity could be used on something else.