Sub topic 1
What a pilot is for
A pilot is a small, time-limited test of a process change. You run the new way of working in one part of the organization, measure the results, and compare them with the old way. The pilot answers one question: does this change work under our real conditions? It does not prove that the change works everywhere. The rollout that follows answers that question.
Prerequisites
You should know these terms:
- Cycle time: the elapsed time to finish one unit of work.
- Defect rate: the share of outputs that fail a check.
- Throughput: the number of units finished in a period.
- Mean and standard deviation: the typical value and the typical spread of a data set.
You should also have worked on a team that follows a defined process.
Pilot, phased rollout, or full rollout
A pilot suits a change with uncertain benefits, unknown side effects, or a high cost of failure. A phased rollout adds the change site by site after the first site proves it. A full rollout changes everything at once, which makes sense only for a low-risk change that is already well understood.
State the hypothesis and success criteria first
Write the hypothesis before the pilot starts. A useful hypothesis names the change, the metric, the expected effect, and the period. For example: "Adding a second inspection step will cut the defect rate from 6 percent to 4 percent within 8 weeks."
Also set guardrail metrics, which are measures that must not get worse, such as on-time delivery. Record these numbers in writing. Changing them after you see the data makes the test meaningless.
Measure the baseline
The baseline is the current performance, measured before any change. Collect enough history to see normal variation. Compare the pilot against this spread, not against a single average.
from statistics import mean, stdev
# Cycle time in minutes for the current process, one value per job
baseline = [42, 45, 39, 48, 44, 41, 46, 43]
print(f"Baseline mean: {mean(baseline):.1f} minutes")
print(f"Baseline spread (std dev): {stdev(baseline):.1f} minutes")Expected output:
Baseline mean: 43.5 minutes
Baseline spread (std dev): 2.9 minutesA pilot result that falls inside this spread is likely noise, not proof of improvement.
Choose a representative scope
Pick a team or line that resembles the wider organization in workload, staffing, and product mix. Avoid the strongest team, because its results will not transfer. Record the chosen scope so the later rollout compares like with like.
| Approach | Scope | Best when |
|---|---|---|
| Pilot | One team or line, short period | Benefit or risk is uncertain |
| Phased rollout | Sites added in waves | Pilot succeeded and sites differ |
| Full rollout | Everywhere at once | Change is low risk and proven |
Exercise
A team wants to cut cycle time by 10 percent. Why must the success criterion be written down before the pilot begins?
Show answer
Writing it first fixes the target, so the team cannot move the goal after seeing the data. Moving the target after the fact makes the test unreliable.