Making a baseline estimate
A baseline estimate is your honest first guess at how long a task takes, written down before you set a deadline. This chapter assumes you already know what Parkinson's law says, why the planning fallacy makes guesses run low, and how to write a definition of done. Here you will turn those ideas into a number you can use.
Why the baseline comes first
A deadline built on a vague feeling of "this should be quick" tends to be too short or too loose. If it is too loose, the work expands to fill it. If it is too short, you miss it and stop trusting your own dates. A baseline gives the deadline something firm to rest on.
The baseline is not the deadline. It is the input. The next chapter adds a buffer and a calendar to it.
Start from the definition of done
You can only estimate a task you can describe. Take the definition of done you wrote earlier and read it as a checklist. Each item on it costs time.
Suppose the task is "write the monthly report." Your definition of done says the report has three charts, a one-page summary, and a review by a colleague. That is more than "write," and the estimate has to cover all of it.
Break the task into pieces
Large tasks hide work. Split the task until each piece is small enough that you can picture doing it. A useful size is between 30 minutes and 2 hours.
For the monthly report:
| Piece | Estimate (hours) |
|---|---|
| Pull the data | 1 |
| Build three charts | 2 |
| Write the summary | 1.5 |
| Fix feedback after review | 1 |
| Total | 5.5 |
Adding up small pieces is usually more accurate than guessing one big number. Small pieces also expose steps you would otherwise forget, such as the time to fix feedback.
Use your own past work
The planning fallacy says we picture the best case. A direct fix is to ask, "How long did similar tasks take me before?" This is called reference-class thinking. You compare the new task to finished ones instead of imagining it from scratch.
If you wrote the last two monthly reports in 6 and 7 hours, a 5.5-hour estimate is probably optimistic. Move your number toward your history.
Estimate focused hours, not elapsed time
Count only the hours of real, focused work. Meetings, messages, and breaks are not part of the task. A 5.5-hour baseline does not mean you finish in one working day. If you manage about 4 focused hours a day, it takes two calendar days. Keep the two measures separate. Your baseline is in focused hours, and the deadline conversion happens later.
Write the estimate down
Record the estimate before you start, with the date and the task name. A number you only held in your head is easy to revise after the fact ("I always thought it'd take that long"). A written number can be checked later, and that comparison is the raw material for calibration.
A simple log works. Each row holds the task, the estimated hours, and a blank for actual hours.
log = [
{"task": "Monthly report", "estimated": 5.5, "actual": None},
{"task": "Update onboarding doc", "estimated": 2.0, "actual": None},
]
def total_estimate(entries):
return sum(entry["estimated"] for entry in entries)
print(total_estimate(log))This prints 7.5. Later you fill in actual and compare.
Common errors
- Estimating the typical case. Estimate the work as it will really go, including a review round or a rerun, not the smooth version.
- Skipping small pieces. Setup, cleanup, and sending the result are real work. List them.
- Giving a single optimistic number. If you feel torn between 4 and 8 hours, do not write 4. Write what you would bet on.
- Anchoring on a requested date. If someone asks "can you have it by Friday?", estimate the work first, then answer.
Exercise
A task has three pieces estimated at 1 hour, 2 hours, and 1.5 hours. Your last two similar tasks took 6 and 7 hours. What baseline would you write down, and why?
Show answer
The pieces add up to 4.5 hours, but your history says similar tasks take 6 to 7 hours, so 4.5 is probably optimistic and some work is missing from the list. A baseline near 6 focused hours is reasonable. It stays close to your past results, and you should look for the forgotten piece, such as review or fixes, that explains the gap.
Exercise
You estimate a task at 8 focused hours and can do 4 focused hours per day. Is the baseline 2 days? Explain.
Show answer
The baseline is 8 focused hours. It becomes about 2 working days only if you really get 4 focused hours on both days. Calendar time depends on your availability, and you convert it when you set the deadline, not when you estimate.