Sub topic 7
Protecting Your Best Hours
This chapter assumes you have already logged your energy for a week or two, identified your high, medium and low periods, and sorted your tasks by the energy they demand. If you have not, return to the chapters on the energy log and on matching tasks to energy periods first. Here the goal is narrower: once you know when your peak is, how do you keep it for the work that needs it?
Why the peak needs protection
Your high-energy window is a small, fixed resource. A typical peak lasts two to three hours. Other people and your own habits compete for it.
- Other people schedule meetings in the morning because mornings look empty on a shared calendar.
- Notifications pull you into email and chat the moment you sit down.
- Your own habits push you to clear small tasks first, so you feel productive before the hard work starts.
The last one is the most common. Small tasks give quick, visible progress. Hard tasks give slow progress and sometimes discomfort. Left alone, the peak fills up with easy items, and the demanding work slides into the low-energy afternoon, where it takes longer and comes out worse.
Protecting the peak means deciding in advance what goes there and defending that decision with a few concrete rules.
Decide what belongs in the peak
Not every important task belongs in your best hours. Use two tests:
- Does the task need deep concentration, hard reasoning or creative output? Writing a proposal, solving a design problem and studying new material all qualify.
- Does the quality of the result depend on your state? A weak draft written in a slump costs you a rewrite. A weak expense report costs you almost nothing.
A task that passes both tests is a peak task. Tasks that are important but routine, such as filing a form you have filed many times, do not pass the second test. They can wait for a lower period.
Limit the peak to one or two peak tasks per day. A common mistake is to list five "deep" tasks and then fail at all of them. If your peak is 09:00-11:30, that is 150 minutes. One block of 90 minutes and one of 60 is realistic. Five tasks is not.
Five practical rules
1. Put the peak block on your calendar first
Create a recurring calendar event for your peak window and give it a plain name such as "Focus: proposal". Do it before you accept other commitments. Most calendar tools mark the time as busy, so colleagues see it as taken and do not offer it to you.
Name the specific task, not just "focus time". A block labelled "Focus" invites you to start by deciding what to do. A block labelled "Write section 2 of the proposal" lets you begin at once.
2. Start with the hard task, before anything else
Open the file you need before you open email. If you must check messages, do it before the block begins and set a time limit. The first minutes of the peak are the most valuable, and they are the ones that email consumes.
A useful habit is to decide the night before what the first task is, and to leave the document open or the notes on your desk. This removes the decision at the moment when your willpower is lowest, which is the start of work.
3. Cut interruptions at the source
Turn off notifications for the length of the block. Close the email client and chat window rather than only minimizing them. Put your phone out of reach, not face-down on the desk.
For interruptions you cannot prevent, write them down instead of acting on them. Keep a scrap list beside you. When a thought like "I need to reply to Sam" appears, add it to the list and return to work. You handle the list during a low-energy period.
4. Tell people what you are doing
Interruptions often come from people who do not know your schedule. A short message works: "I'm unavailable 09:00-11:00 for focused work and reply to messages after that." Most colleagues accept this. Offering a time when you are available matters, because it turns a refusal into a delay.
5. Set a default for meeting requests
Decide in advance how you respond to a meeting that lands in your peak. A simple policy:
- Decline or propose another time if the meeting is optional or can move.
- Accept only if the meeting is itself a peak task, such as a design discussion that needs your best thinking.
- Accept and adjust if the meeting is fixed (a client call, a manager's review). Then move your peak task to the next best window, rather than squeezing it into a fragment.
Having a rule means you do not renegotiate your priorities each time a request arrives.
What to do when the peak is not available
Some days the peak is taken. A fixed meeting may fall at 10:00. A deadline may force you to work at a different hour. Protecting your best hours does not mean pretending these days do not happen.
When the peak is broken, you have three choices:
| Situation | Best response |
|---|---|
| Peak shortened by a meeting (for example, 09:00-10:00 remains) | Do a shorter, well-defined piece of the hard task, such as an outline, instead of the full draft |
| Peak fully lost | Move the peak task to the next highest period, usually the medium-energy window, and note that it will take longer |
| Peak lost several days in a row | Look for the cause. A recurring meeting can often be moved, and a pattern like this is worth raising with the person who owns the schedule |
Avoid the two worst responses: forcing the hard task into a low-energy period without adjusting expectations, and abandoning the whole system for the day.
Using the log to check that the protection works
A rule is only useful if it actually keeps the peak free. You can check this against your own data. Add a column to your energy log that records whether the hour was spent on a planned peak task. The log from earlier in the tutorial then looks like this:
date,hour,energy,task,planned_peak
2026-11-23,9,4,Write project proposal,yes
2026-11-23,10,4,Write project proposal,yes
2026-11-23,11,4,Review pull requests,no
2026-11-23,14,2,Answer email,no
2026-11-24,9,5,Write project proposal,yes
2026-11-24,10,3,Team meeting,no
2026-11-24,14,2,Expense report,noThe following script reports, for each date, how many of the hours in your peak window (here 09:00 to 11:00) went to planned peak work.
import csv
from collections import defaultdict
PEAK_START = 9
PEAK_END = 11 # hours 9 and 10 count as the peak window
peak_hours = defaultdict(int)
protected_hours = defaultdict(int)
with open("energy_log.csv", newline="") as f:
for row in csv.DictReader(f):
hour = int(row["hour"])
if PEAK_START <= hour < PEAK_END:
peak_hours[row["date"]] += 1
if row["planned_peak"].strip().lower() == "yes":
protected_hours[row["date"]] += 1
for date in sorted(peak_hours):
total = peak_hours[date]
kept = protected_hours[date]
print(f"{date} {kept} of {total} peak hours used for planned peak work")With the sample data above, the output is:
2026-11-23 2 of 2 peak hours used for planned peak work
2026-11-24 1 of 2 peak hours used for planned peak workOn 24 November the team meeting at 10:00 took half the peak. One day like this is normal. If the number is low on most days, your protection rules are not working, and you should look at which interruption is responsible.
Common mistakes
- Protecting the peak but filling it with the wrong work. A block spent on low-demand tasks wastes the protection. Check that the task passes both tests above.
- Making the rules too rigid. If you refuse every meeting in the peak, colleagues will route around you, and you may miss decisions that matter. Allow exceptions for fixed or high-value commitments.
- Treating the whole morning as the peak. Your log may show a narrower window than you expect. Protect the hours the data supports, not the hours you wish were best.
- Checking messages "just once". One check often becomes twenty minutes, and returning to deep work after an interruption takes time. Batch checks outside the block.
- Ignoring recovery. A peak block of 90 minutes or more benefits from a short break before the next one. Without it, the second half of the window produces less than the first.
A worked day
Suppose your log shows a peak at 09:00-11:30, medium energy from 11:30-13:00 and 15:30-17:00, and low energy from 14:00-15:30. A protected day might look like this:
08:45 Open the proposal draft. Notifications off.
09:00 Peak block 1: write section 2 of the proposal (90 min)
10:30 Short break (10 min)
10:40 Peak block 2: solve the open design question (50 min)
11:30 Check messages, reply to anything urgent (30 min)
12:00 Code review (medium energy)
13:00 Lunch
14:00 Email, expenses, filing (low energy)
15:30 Planning for tomorrow, meetings (medium energy)Two points stand out. The hardest work comes first and is not interrupted by email. Messages are handled in a defined slot, so nothing is ignored, only delayed.
Exercise
Your peak is 09:00-11:30. On Tuesday a client call is fixed at 10:00-11:00. List two sensible ways to adapt your plan, and name one response you should avoid.
Show answer
Two sensible options: (1) use 09:00-10:00 for a well-defined part of the hard task, such as an outline, and finish the rest in the next best window; (2) move the whole peak task to the medium-energy window after lunch and expect it to take longer. A response to avoid is forcing the full task into the low-energy afternoon without adjusting expectations, or abandoning the energy plan for the day.
Exercise
A colleague says, "I'll just protect all morning, 08:00-12:00, and decline every meeting." Give two problems with this plan.
Show answer
First, the log may show the real peak is shorter than four hours, so the protection covers hours that are not your best and wastes calendar space. Second, refusing every meeting is too rigid. Colleagues may stop inviting you, and you may miss fixed or high-value commitments. A better plan protects the window the data supports and allows exceptions.
Exercise
Using the planned_peak log in this chapter, what would the script print if 25 November had rows for hours 9 and 10, both marked "yes"?
Show answer
It would print "2025-11-25" with the date used in the log, in this case "2026-11-25 2 of 2 peak hours used for planned peak work", after the lines for 23 and 24 November because dates are sorted.