Sub topic 8
Making Good Use of Low-Energy Periods
What this chapter assumes
This chapter assumes you have read the earlier chapters in this tutorial. You should already know how to keep an energy log, how to read your own high, medium and low periods from it, and how to sort tasks into deep, shallow and recovery work. You should also be able to place demanding tasks in your peak hours. This chapter covers the other end of the day: what to do with the hours when your energy is lowest.
The aim is not to squeeze more output out of weak hours. The aim is to stop wasting them, and to stop them from damaging your best hours.
Why low-energy periods need a plan
Most people treat a slump as a failure. They push through it with demanding work, or they drift into low-value browsing and feel bad about it. Both outcomes cost you something.
- Demanding work done at low energy is slow and error-prone. You often redo it later, in a better period.
- Unplanned drifting uses the time but returns nothing. It also leaves you tired in a different way, because the day feels wasted.
A planned low-energy period avoids both. You decide ahead of time what belongs there, so you do not have to make decisions while your judgment is weakest.
Making good use of low energy means choosing tasks that fit it. Those tasks share a few traits: they have clear steps, they need little original thinking, and a mistake is cheap to fix.
What kind of work fits a low-energy period
Not all low-energy work is the same. It helps to separate three groups.
- Shallow work with clear steps. Email, expense reports, filing, updating a task list, scheduling, and data entry. You know what "done" looks like before you start.
- Maintenance work. Tidying folders, renaming files, closing old tickets, archiving, backing up, and updating documentation that already exists.
- Recovery work. A walk, a real break, a short rest, or a conversation that is not about work. Recovery is a legitimate use of the period, not a loss.
The test for each task is simple. Ask two questions:
- Can I do this correctly while tired?
- If I get it slightly wrong, is it easy to notice and fix?
If both answers are yes, the task belongs in a low-energy period.
Tasks that look easy but are not
Some tasks feel light and are not. Be careful with these:
- A difficult email. Replying to a sensitive message needs tone and judgment. Typing it is shallow work, but deciding what to say is not.
- Anything with money or permissions. A payment, a deletion, or a message sent to many people has costly mistakes. Tiredness raises the risk.
- Reviewing someone else's work for subtle errors. A careful review needs sustained attention. Skimming it while tired produces a review that looks done and is not.
Move these to a medium-energy period, or split them. You can draft the difficult email in a medium period and send it in a low one after a final read.
Using your log to identify the right tasks
Your energy log already tells you when your low periods occur. It also helps you find which tasks suit them. The task column in the log records what you were doing. Combined with the energy rating, it shows which tasks you handled well when your energy was low.
Here is a small sample log, using the same format as earlier in the tutorial.
date,hour,energy,task
2026-11-23,9,4,Write project proposal
2026-11-23,11,4,Review pull requests
2026-11-23,14,2,Answer email
2026-11-23,16,3,Update task list
2026-11-24,9,5,Write project proposal
2026-11-24,14,2,Expense reportThe 14:00 entries have a rating of 2 on both days, and the tasks done then were email and an expense report. Both are shallow work. This is a good fit already, and it suggests you may be placing work well without having planned it.
The next script goes one step further. It lists every task you did at a low rating, so you can see which tasks you already do in weak hours. You can then decide which of them really belong there.
import csv
from collections import defaultdict
LOW_THRESHOLD = 2 # ratings at or below this count as low energy
low_tasks = defaultdict(list)
with open("energy_log.csv", newline="") as f:
for row in csv.DictReader(f):
if int(row["energy"]) <= LOW_THRESHOLD:
low_tasks[row["task"]].append(int(row["hour"]))
if not low_tasks:
print("No entries at or below the threshold.")
else:
for task in sorted(low_tasks):
hours = ", ".join(f"{h:02d}:00" for h in sorted(low_tasks[task]))
print(f"{task}: {len(low_tasks[task])} low-energy entries at {hours}")With the sample log above, the script prints:
Answer email: 1 low-energy entries at 14:00
Expense report: 1 low-energy entries at 14:00On a real two-week log you will see more variety. Look for two things in the output:
- Good fits. Shallow tasks that appear here regularly. Keep them there.
- Misfits. Tasks that need thought but appear here. These are the ones to move.
If a task that needs thought appears often at low energy, the cause is usually your schedule, not your discipline. Maybe a meeting pushed it later, or maybe you had no better slot for it. That points to a scheduling fix, which later chapters cover.
Building a low-energy task list
A common problem is that you reach a slump with no idea what to do. You then choose whatever is in front of you, which is usually your inbox. Prevent this by keeping a short, ready list of tasks that suit low energy.
A good list has these properties:
- Each item is small, ideally 10 to 30 minutes.
- Each item has an obvious first action, such as "open the expense tool and add the three receipts from Tuesday."
- Items are written down in advance, so you do not have to think of them while tired.
Keep this list separate from your main task list, or tag the items with a label such as low-energy. When the slump arrives, you open the list and start at the top.
Here is the daily template from earlier, with the low-energy section filled in.
High energy (09:00-11:30): write proposal, solve design problem
Medium energy (11:30-13:00, 15:30-17:00): code review, planning, meetings
Low energy (14:00-15:30): email, expenses, filing, adminThe low-energy line names categories. Your own list should name specific items, for example: "reply to the three supplier emails," "file the signed forms," and "update the project tracker."
Batching shallow tasks
Shallow tasks are good candidates for batching, which means doing many similar small tasks together in one block. Batching suits low energy for a practical reason. Each switch between different kinds of work has a mental cost, and you have less to spare when tired. Doing ten emails in a row, then ten filing items in a row, keeps the cost low.
Two limits apply:
- Do not batch email all day. One or two email blocks usually beat constant checking. A low-energy period is a good place for one of them.
- Keep the batch bounded. Set a time box, such as 30 minutes. Without one, shallow work expands to fill all the time you give it.
Recovery as a deliberate choice
Sometimes the right use of a low-energy period is to stop working. If your rating is 1 and you have been working hard, then a 15 to 20 minute break may return more than a further hour of poor work.
Some options that tend to help:
- A short walk, ideally outdoors.
- A brief rest away from screens.
- A snack or a glass of water, if you have not eaten or drunk recently.
- A change of scene, such as moving to a different room.
A later chapter covers sleep, breaks, food and movement in more detail. For this chapter, the point is that recovery counts as part of the plan. Write it into the schedule like any other block.
Be honest about the difference between recovery and avoidance. Recovery has a limit and an end: "a 15-minute walk, then back to the list." Avoidance has no end and usually involves a feed or a news site.
Handling a slump that comes at the wrong time
Your low period may land in the middle of a deadline or a long meeting. You cannot always move it. In that case, you have a few options.
| Situation | Practical response |
|---|---|
| Slump arrives during a deadline task | Switch to the clearest remaining sub-step, such as formatting or checking references, and save the hardest step for the next medium period |
| Slump during a long meeting | Take notes actively, ask a question, or stand up if the setting allows it |
| Slump with no fixed task | Start the low-energy list and use a time box |
| Slump is much deeper than usual | Check sleep, food and recent workload before changing the schedule |
The last row matters. A normal low period is part of your pattern. A sudden, deep drop is different, and it usually has a cause such as poor sleep or a skipped meal. Do not redesign your schedule around one bad day.
A worked example
Consider a designer named Priya. Her log, kept for two weeks, shows these patterns:
- Her energy is highest from 09:00 to 11:30.
- It dips at 14:00 and recovers around 15:30.
- She keeps answering client email at 09:00, which uses her best hour.
She makes three changes.
- She moves email to a 30-minute block at 14:15, inside her dip.
- She creates a
low-energylist with six items: file invoices, rename the asset folders, update the project tracker, clear the receipts, archive finished projects, and tidy the shared drive. - She schedules a 15-minute walk at 15:00, before her energy returns.
After a week, she checks her log again. The 14:00 ratings are still low, at 2 and 3. That is expected, because the approach does not raise your low period. What changed is that her 09:00 hour is now free for design work, and the 14:00 hour no longer feels wasted.
This is the right result to look for. Success is not a higher rating in the slump. Success is better work placed in the right hours.
Common mistakes
- Filling the slump with nothing. Without a list, low-energy time goes to scrolling.
- Putting hard work in the slump out of guilt. Pushing through often produces work you redo.
- Treating every low rating as a problem to fix. Low periods are normal. They need a fit, not a cure.
- Putting risky tasks in the slump. Payments, deletions and mass messages need more attention than a tired mind offers.
- Leaving no time for recovery. A schedule with no rest gives you a slump that grows.
- Making the list too vague. "Admin" is not a task. "File the three signed forms" is.
Summary
Low-energy periods are predictable, so you can plan for them. Choose tasks that have clear steps and cheap mistakes. Keep a ready list so you do not decide while tired. Batch shallow work in a time box. Treat recovery as a valid, bounded choice. Use your log to confirm which tasks you already do well in weak hours, and to find misfits that should move.
Exercise
Your log shows you reply to a sensitive message from a client at 14:00 on most days, and your rating then is 2. The replies often need rewriting later. Which change would you make, and why?
Show answer
Split the task. Draft the reply during a medium-energy period, when you can judge tone and content well. Then use the low-energy period only for a final read and for sending it. The reason is that deciding what to say is not shallow work, even though typing it is. A misjudged tone is costly to fix, so the decision belongs in a period with better judgment.
Exercise
Write four items for a low-energy list for a student. Make each item specific enough that the first action is obvious.
Show answer
Any four items that are small, concrete and low-risk will do. Examples: "Copy the three lecture slides into the revision folder and rename them by week," "Reply to the group-project thread with my availability for Thursday," "Add the two library due dates to my calendar," and "Delete the duplicate notes files in the course folder." Each item has a clear first action and a cheap mistake. A vague item such as "sort out admin" does not qualify.
Exercise
After two weeks of using a low-energy list, your 14:00 rating is still 2. Does this mean the approach failed?
Show answer
No. The approach does not aim to raise your low period. It aims to place suitable work there and free your best hours for demanding work. Judge it by whether your high-energy hours now hold deep work, whether low-energy tasks get done without strain, and whether you redo less work. If a sudden deeper drop appears, check sleep, food and workload before changing the plan.