Sub topic 4
The Few Symbols You Need
Prerequisites and purpose
Assume you can read a basic flowchart and know the process you want to improve. You should also understand the difference between processing time and waiting time. This chapter focuses on the small set of symbols needed to make a swimlane diagram readable and useful.
A swimlane diagram combines two ideas:
- A flowchart shows the order of work.
- Swimlanes show who performs each step.
The symbols should make the process easier to discuss, not make the diagram look formal. Use one meaning for each symbol throughout the map.
The core symbols
| Symbol | Meaning | Example |
|---|---|---|
| Start or end | The process begins or finishes at this point | Request received |
| Activity | Someone or something performs work | Check customer details |
| Decision | The path changes based on a condition | Details complete? |
| Flow arrow | Work moves from one point to the next | Check details → Approve request |
Start and end
Use a rounded shape for the start and end of the process. Label each point with a short event or result.
The start should describe the trigger, such as “Customer submits request.” The end should describe an outcome, such as “Order delivered” or “Request closed.”
Do not use “Start” and “End” as the only labels when the map will support improvement work. Specific labels help the team agree on the process boundary.
Activities
Use a rectangle for an activity. Write the action with a verb and an object:
- Review application
- Enter order into system
- Send approval email
Keep one major action in each rectangle. If a box contains several actions, the team may miss where time, errors or handoffs occur.
Place the activity in the lane of the actor who performs it. If a support agent enters information into a system, place the activity in the support agent’s lane unless the system performs the step automatically. The actor matters because improvement decisions often depend on ownership and workload.
Decisions
Use a diamond for a decision. Write the condition as a question or a clear test, such as “Information complete?”
Every decision should have labeled outgoing paths. Common labels include “Yes” and “No,” but more specific labels are better when needed:
- Approved / Rejected
- In stock / Out of stock
- Valid / Invalid
A decision is not an activity. “Check application” is work and belongs in a rectangle. “Application complete?” is the result of that check and belongs in a diamond.
Flow arrows
Use arrows to show the sequence of work. An arrow should point from the step that happens first to the step that happens next.
Avoid crossing arrows where possible. If a path must return to an earlier step, make the loop visible and label its reason. For example, a “No” result from “Information complete?” might return to the customer for missing details.
The arrow crossing a lane boundary identifies a handoff. That crossing deserves attention because it can introduce waiting, unclear responsibility or rework.
Applying the symbols consistently
The following small map uses the four core symbols. The lane grouping shows who performs each activity, while the shapes show what kind of process element it is.
When reviewing a map, ask four questions:
- Is the trigger clear?
- Does every work step use an action label?
- Does every decision show all important outcomes?
- Can a reader follow every arrow to an end or an intentional loop?
These checks catch many notation problems before the team begins measuring the process.
Exercise
In a request process, “Check address” leads to “Address valid?” Which symbol should represent each item, and why?
Show answer
“Check address” is an activity rectangle because someone performs the checking. “Address valid?” is a decision diamond because its result selects the next path.