Finding Waste, Delay and Bottlenecks on the Map
Assume you understand basic flowcharts, know the process being mapped, and can distinguish processing time from waiting time. This chapter uses those ideas to analyze a validated current-state swimlane diagram.
A swimlane map shows more than task order. It also shows where work waits, where information moves between actors, and where a decision sends work backward. These patterns help you locate waste, delay, and bottlenecks.
Read the map for waste
Waste is work that consumes time or resources without improving the outcome the customer needs. In a process map, common forms of waste appear as visible patterns:
- Waiting: A request sits in a queue or waits for approval.
- Rework: A task is repeated because information was missing or incorrect.
- Handoffs: Work moves between people or teams more often than necessary.
- Extra processing: Someone enters the same data into multiple systems.
- Defects: An error causes a rejected result or correction.
- Unnecessary movement: A person or item travels between locations.
- Overproduction: Work is completed before it is needed.
Mark these patterns directly on the map. Use a consistent notation, such as a red symbol for defects and a clock symbol for waiting. Do not label a step as waste only because it seems inconvenient. Confirm what the customer needs and what the step actually accomplishes.
Separate processing time from delay
Processing time is the time someone actively works on a request. Wait time is the time the request spends idle between activities. Together, they form lead time.
| Measure | Meaning | Example |
|---|---|---|
| Processing time | Active work time | 18 minutes |
| Wait time | Idle or queue time | 2 days |
| Lead time | Processing time plus wait time | 2 days, 18 minutes |
| First-pass yield | Percent completed without rework | 82% |
A process can have very little hands-on work but a long lead time. For example, a support request may require only 18 minutes of work while waiting two days for an approval. The map makes that difference visible.
Annotate each step with observed data rather than estimates when possible. Record the typical value, range, or median. Also record volume and error rate. A short step with a high error rate may create more total delay than a longer step that rarely fails.
Find bottlenecks
A bottleneck is the process constraint that limits overall output. It is often a busy resource, a slow decision, a shared system, or a queue that grows faster than it clears.
Look for these signs:
- Work accumulates before one lane or activity.
- The same specialist must approve many items.
- A system has limited capacity or slow response time.
- One branch handles most requests.
- A rework loop repeatedly returns work to an already busy step.
Do not assume the longest task is the bottleneck. A five-minute approval may create a larger queue than a thirty-minute task if many requests require that approval and only one person can perform it.
A simple analysis compares arrival and completion rates. If 40 requests arrive per hour but a resource can complete only 30, the queue will grow by about 10 requests per hour until demand or capacity changes.
Prioritize improvement opportunities
Use the map to rank problems instead of fixing every problem at once. Consider:
- Impact: How much lead time, cost, risk, or customer harm does the problem create?
- Frequency: How often does the problem occur?
- Control: Can the team change the cause without waiting for another department?
- Confidence: Is the conclusion supported by observations and data?
Start with a repeated delay or rework loop that affects many requests. A small improvement at a bottleneck can produce more benefit than optimizing an isolated task.
From current state to future state
After identifying the major causes, sketch a future-state map. Remove unnecessary approvals, combine duplicate data entry, move decisions closer to the work, or prevent missing information at the trigger point. Preserve required controls and show any new risks.
Compare the two maps using the same measures. A credible future state should show how processing time, wait time, rework, or queue size will change.
Exercise
A process has 25 minutes of active work, 36 hours of waiting, and a 20% rework rate at one approval step. What should you investigate first, and why?
Show answer
Investigate the approval queue and the cause of rework first. Waiting dominates the lead time, and rework sends one in five requests through the approval step again. Check approval capacity, required information, and the reasons requests fail.