Sub topic 14
Keeping a decision log and reviewing your stopping record
This chapter covers the last step in the stopping process: writing each continue, pivot, or stop decision down and reviewing those records over time. It assumes you have read the earlier chapters on kill criteria, checkpoints, and choosing among continuing, pivoting, and stopping. It also assumes you have run at least one project for several weeks. The Python example is optional, and basic familiarity is enough to follow it.
Why a log matters
A single good decision is hard to repeat unless you can see how you made it. Memory rewrites the story. After an idea fails, you tend to remember that you "knew it wasn't working." After a stop that turns out wrong, you tend to remember that you "never had enough time." Both memories are convenient, and neither is reliable.
A decision log is a short, dated record of each continue, pivot, or stop decision. It captures what you believed and what you knew when you decided, so a later review can judge the decision rather than the result.
The log does three jobs:
- It holds you to your own rules. A kill criterion you wrote before starting is hard to quietly rewrite when the entry sits in a file.
- It separates decision quality from outcome. A sound stop can look foolish if the idea later succeeds elsewhere. A weak continue can look wise if you got lucky. The log shows which one you made.
- It shows your patterns. One decision tells you little. Twenty tell you whether you tend to stop too early, stop too late, or skip the writing step when you feel attached.
What goes in an entry
Keep an entry short enough that you will actually write it. If it takes more than ten minutes, you will skip it on the days it matters most. A useful entry has these fields:
| Field | What to write | Why it earns its place |
|---|---|---|
| Date | The day you decided | Lets you measure time from start to decision |
| Kill criteria | The criteria as written at the start, copied verbatim | Prevents moving the goalposts |
| Evidence at review | Measured results, not impressions | Keeps evidence separate from hope |
| Options considered | Continue, pivot, stop, and any variants | Shows you looked at more than one path |
| Decision | One option, stated plainly | Removes ambiguity later |
| What we keep | Notes, code, contacts, templates | Records the salvage step |
| What we would do differently | One or two sentences | Feeds the next project |
Here is a complete entry in Markdown. You can store entries in a notes app, a repository, or one shared document.
## Decision record: Idea X
- Date: 2026-11-28
- Kill criteria (written at start): fewer than 5 of 20 people willing to pay by week 8
- Evidence at review: 1 of 20 willing to pay
- Options considered: continue, pivot to a narrower audience, stop
- Decision: stop
- What we keep: interview notes, landing page template
- What we would do differently: test willingness to pay earlierTwo details matter. The kill criteria line is copied from the original plan, not rephrased. The evidence line holds a number, not a feeling. If the evidence is missing, write "no data" and treat that as a finding about your process.
Write the entry at the right moment
Write an entry at three moments:
- At the start. Record the kill criteria, the budget, and the checkpoint dates. This is the entry that makes the later ones honest.
- At each checkpoint. Record the evidence and the decision, even when the decision is simply "continue." Continue entries are the ones people skip, and they are the ones that show escalation of commitment building up.
- After the decision plays out. Add a short follow-up weeks or months later. This is where you learn whether the decision was good.
Separate the decision from the outcome
The follow-up note is the most useful part of the log, and the easiest to get wrong. When you look back, ask two separate questions:
- Was the decision reasonable given what I knew then? Judge it using only the evidence recorded in the entry.
- Did it turn out well? This depends partly on luck and on events nobody could foresee.
This gives four combinations. A good decision with a good outcome needs no change. A good decision with a bad outcome is bad luck, so do not change your process in response. A bad decision with a good outcome is luck covering a process flaw, and it is the most dangerous case because it rewards the flaw. A bad decision with a bad outcome points to a specific flaw to fix.
Review your stopping record
After a handful of entries, read them together. The aim is to find a pattern in your own behavior, not to grade any single idea. Useful questions:
- How often did you write criteria before starting? If the answer is "rarely," fix that first.
- How many stops happened after the budget was already exceeded? That is a sign of late stopping.
- Which stops did you later regret, and why? Did you stop before the checkpoint, or because of one bad week?
- Which continues did you later regret? Look for entries where the evidence line was thin and the reasons were about effort already spent.
- Do the same excuses appear? Phrases like "just one more month" or "we're so close" are worth counting.
You can also compute simple counts. The script below keeps entries as data and prints a summary. It is a small example, and a spreadsheet works just as well.
from collections import Counter
from dataclasses import dataclass
@dataclass
class Entry:
idea: str
decision: str # "continue", "pivot", or "stop"
criteria_first: bool # were kill criteria written before work began?
spent: float # weeks spent at decision time
budget: float # weeks agreed at the start
follow_up: str # "agree", "regret_early", "regret_late", "pending"
def summarize(entries):
decisions = Counter(e.decision for e in entries)
with_criteria = sum(e.criteria_first for e in entries)
stops = [e for e in entries if e.decision == "stop"]
late_stops = [e.idea for e in stops if e.spent > e.budget]
regrets = Counter(e.follow_up for e in entries if e.follow_up.startswith("regret"))
return {
"decisions": dict(decisions),
"criteria_first": f"{with_criteria}/{len(entries)}",
"late_stops": late_stops,
"regrets": dict(regrets),
}
entries = [
Entry("A", "stop", True, 8, 8, "agree"),
Entry("B", "stop", False, 20, 8, "regret_late"),
Entry("C", "pivot", True, 6, 8, "agree"),
Entry("D", "stop", True, 3, 10, "regret_early"),
Entry("E", "continue", True, 5, 10, "pending"),
]
for key, value in summarize(entries).items():
print(key, value)Running it prints:
decisions {'stop': 3, 'pivot': 1, 'continue': 1}
criteria_first TrueThe summary is clearer than a pile of notes. Idea B is the only entry without criteria written first, and it is also the one that ran far past its budget and was regretted as a late stop. Idea D was stopped well under budget and regretted as too early. Together these suggest one fix for each problem: always write criteria first, and for early stops, wait for the checkpoint before deciding.
Common errors
- Logging only the stops. If continues and pivots are missing, you cannot see escalation or measure how long you tend to stay.
- Writing the entry after the decision is emotionally settled. Write it while you still feel the pull of both options. Entries written afterward tend to justify rather than decide.
- Vague evidence. "Users seemed interested" cannot be compared across ideas. Record counts, dates, and who said what.
- Never reviewing. A log nobody reads is only a diary. Put a review on the calendar, for example every quarter or after every third closed idea.
- Treating the log as a verdict on you. The record describes decisions, not your worth. If entries make you defensive, shorten them and focus on facts.
- Over-correcting. If you find you stopped too early twice, do not swing to never stopping. Adjust one thing, such as requiring a full checkpoint cycle before any stop, and see what the next few entries show.
Close the loop
The log feeds back into the start of the next idea. When you write kill criteria for a new project, read your last few entries first. If your past budgets were too short, lengthen them. If your criteria were too vague to measure, tighten them. If you often forgot to salvage assets, add a "what we keep" line to the plan itself.
Over time the record becomes your own evidence about how you decide. That makes it a better guide than any general rule about when to quit.
Exercise
You review your log and find three entries. Idea P was stopped at week 8 against a budget of 8, with 1 of 20 people willing to pay against a criterion of 5. Idea Q was continued at week 12 against a budget of 8, with the evidence line reading "feels promising." Idea R was stopped at week 2 against a budget of 10, with no criteria written. Which entry shows a sound decision process, and what pattern do the other two show?
Show answer
Idea P shows a sound process: the criterion was written in advance, the evidence is a measured number, and the stop happened at the budget. Idea Q shows escalation of commitment: it ran past budget on an impression instead of evidence. Idea R shows an early stop without criteria, so there was nothing to decide against and the stop may have been driven by mood. Together, Q and R suggest the fix is to write criteria first and to decide only at scheduled checkpoints.
Exercise
A project you stopped six months ago has just been launched by a competitor and is doing well. Should you rewrite your old log entry to say you stopped too early? What should you do instead?
Show answer
No. Leave the original entry unchanged and add a follow-up note. Then ask whether the decision was reasonable given the evidence you recorded at the time. If the evidence supported stopping, the competitor's success is mostly luck or a different execution, and your process should not change. If the entry shows thin evidence or skipped criteria, record that as a process flaw to fix.