Sub topic 6
Explore versus exploit: how long to keep trying new things
This chapter assumes you have worked on a project or idea for several weeks or more. It also assumes you have set goals or milestones before. You do not need math beyond basic fractions. The Python example is short, and you can skip it without losing the main argument.
The two modes
Every time you pick what to work on, you are doing one of two things.
- Exploring means trying something new to learn what is possible. You test a different idea, audience, method, or tool. The payoff is information.
- Exploiting means putting more effort into the option that has worked best so far. The payoff is a result you can already predict with some confidence.
Both are needed. If you only exploit, you may settle on a mediocre option because you never looked at better ones. If you only explore, you collect starting points and never get the compounding return that comes from sustained work.
This is the same tension the chapter on persistence and quitting introduced, seen from another side. Dropping an idea is an exploring move. Continuing with it is an exploiting move. The question is how much of each you should be doing right now.
Why the balance changes over time
The right mix depends on two things: how much you know, and how much time is left to use what you learn.
- Early on, explore more. You know little, so each new try teaches you a lot. A bad option costs little to discover, and a good one pays off for a long time.
- Later, exploit more. You have a decent picture of the options, and a new try is less likely to beat your best one. Time left to benefit from a discovery is also shorter.
A familiar example is choosing a restaurant. In a city you just moved to, trying a new place each week is sensible. In a city you have lived in for ten years, you return to favorites and try something new only now and then. The same logic applies to ideas: a person with a three-month window and a person with a three-year window should not explore equally.
Where dropping an idea fits
When you have several candidate ideas, the explore/exploit view gives you a way to judge each one.
- Early failure of an idea is cheap information. Dropping an idea after a short test is a successful exploration, not a defeat. You paid a small amount to learn it was weak.
- Late failure is expensive. The longer you exploit a weak option, the more you pay for the same information. That is why the checkpoints in a later chapter come with fixed dates.
- A promising idea deserves a fair test. If you drop every idea at the first difficulty, you are exploring forever and never learn whether any idea would have worked.
The practical rule is to give each new idea an exploration budget that is small, fixed, and written down. After that budget is spent, you either move it into the exploit group or retire it.
A simple rule of thumb: the 37 percent rule
A well-known result from the "secretary problem" in mathematics gives a concrete starting point. Suppose you must choose one option from a fixed number of candidates, you see them one at a time, and you cannot go back to an option you passed. The best strategy under those conditions is:
- Look at roughly the first 37 percent of the candidates without committing to any.
- Remember the best one you saw.
- Then commit to the first later candidate that beats that best.
So if you plan to evaluate about ten project ideas over the year, you would explore about the first four, note the strongest, and then commit to the next idea that is better.
Treat this as a way of thinking, not a law. The assumptions are strict. You cannot revisit rejected options, you know how many candidates there will be, and you only care about getting the single best one. Real projects rarely fit those conditions. What carries over is the shape of the advice: spend a defined early share of your time or attempts on looking, and then stop looking.
A small simulation
The code below simulates a "multi-armed bandit" with three ideas. Each idea has a hidden success rate, and each attempt returns success or failure. The strategy explores at random a fixed share of the time and otherwise picks the idea with the best record so far. Try different values of explore_share and you will see the trade-off directly.
import random
def run(explore_share, attempts=200, seed=1):
rng = random.Random(seed)
true_rates = [0.2, 0.35, 0.5] # hidden from the strategy
wins = [0, 0, 0]
tries = [0, 0, 0]
total = 0
for _ in range(attempts):
if rng.random() < explore_share or min(tries) == 0:
choice = rng.randrange(3) # explore: pick any idea
else:
rates = [wins[i] / tries[i] for i in range(3)]
choice = rates.index(max(rates)) # exploit: pick the best so far
success = rng.random() < true_rates[choice]
tries[choice] += 1
wins[choice] += success
total += success
return total
for share in [0.0, 0.1, 0.3, 0.6, 1.0]:
average = sum(run(share, seed=s) for s in range(200)) / 200
print(f"explore_share={share:.1f} average successes={average:.1f}")The line min(tries) == 0 forces each idea to be tried once, so the strategy never divides by zero. Over many runs you should see that no exploring at all does worse than a modest amount, and that exploring most of the time does worse again. The exact numbers vary, but the pattern is a middle value that does best. With explore_share=1.0 the strategy picks at random every time and averages about 0.35 successes per attempt, the mean of the three rates.
Common errors
Treating exploration as a failure of focus. Some people feel guilty about any time spent on new directions. If your projects are early, that guilt pushes you into exploiting too soon. Set an explicit exploration budget so the time is planned, not stolen.
Treating exploitation as a failure of imagination. The opposite error is constantly switching because the next idea always looks fresher than the current one. A new idea has no visible flaws yet, which makes it look better than one you know well. Compare ideas on evidence, not on how new they feel.
Exploring with no way to learn. A trial that cannot produce a clear result is not exploration. It is wandering. Before a trial starts, write down what result would count as success and what would count as failure.
Never moving options out of exploration. Some ideas stay in an "I'm still testing it" state for months. Give every trial an end date. At that date it is either promoted or retired.
Ignoring changing conditions. A past winner can stop winning when the market, your skills, or your circumstances change. A small, ongoing exploration share, even in a mature project, helps you notice this.
Applying it to your own decisions
Use this short procedure when you have several ideas, or when one idea is stalling.
- List your current ideas and mark each as exploring or exploiting.
- For each exploring idea, check that it has an end date and a stated success test.
- For the exploiting idea, ask what evidence would make you start exploring again.
- Set a rough ratio for the next period, such as 70 percent on your best idea and 30 percent on new tests, and adjust it based on how much time you have left.
- At the end of the period, review the results and change the ratio.
| Situation | Lean toward | Reason |
|---|---|---|
| New project, little data, long horizon | Exploring | Information is worth the most now |
| One option clearly ahead, deadline near | Exploiting | Less time to benefit from new findings |
| Best option is flat or declining | Exploring | Your current estimate may be out of date |
| Trial costs are high and hard to undo | Exploiting, with more analysis first | A wrong exploration is expensive |
| Trial costs are tiny and reversible | Exploring | You lose little if the test fails |
The next chapter on reversible and irreversible decisions explains the last two rows in more detail. Later chapters turn the end dates and success tests from this chapter into formal kill criteria and checkpoints.
Exercise
You have three side project ideas and about nine months to make one of them work. Using the explore/exploit view, describe how you would divide the first month and the last month, and name one sign that you should return to exploring late in the project.
Show answer
In the first month, spend most of the time exploring: run a small, time-limited test of each idea with a written success test, so you learn which looks strongest cheaply. In the last month, spend almost all of the time exploiting the leading idea, because there is little time left to benefit from anything new. A sign to return to exploring late is that the leading idea's results have flattened or declined despite continued effort, which suggests your earlier estimate no longer holds.
Exercise
In the simulation, the strategy with exploreshare=0.0 usually earns fewer successes than one with exploreshare=0.1. Explain why in terms of what each strategy knows, and say what real-life mistake the explore_share=0.0 strategy represents.
Show answer
With no exploring, the strategy commits to whichever idea happened to get an early lucky result and never collects enough data on the others, so it can lock onto a weaker idea for the whole run. A small exploration share lets it keep testing the other ideas and eventually find the best one. In real life this is settling on the first idea that shows any success and never checking whether another one would do better.