Sub topic 13
Assessing Readiness with SAP Tools
What this chapter assumes
You should know the difference between ECC and S/4HANA at the level of the earlier chapters. That means the simplified data model, the Universal Journal, Business Partner, and the three migration approaches. You should also be able to read basic ABAP and have access to an ECC system, or know who administers one. The tool names and menu paths below are current as of this writing. SAP renames and reorganizes them often, so confirm them in SAP's documentation before relying on them.
Why assess before you decide
A migration approach cannot be chosen on opinion. Whether a system conversion is realistic depends on facts about your system:
- Which simplification items apply to your modules and processes.
- Whether your add-ons and industry solutions have S/4HANA versions.
- How much custom code breaks or must change.
- How large the database is.
- Which target release and software stack you can reach.
SAP provides four tools that answer these questions. Each answers a different one, and they are meant to be used together.
| Tool | Question it answers | Where it runs |
|---|---|---|
| Simplification Item Catalog | What changes in S/4HANA, and what must I do about it? | SAP-hosted web catalog, with an offline download |
| Simplification Item Check | Which of those changes affect this system, and are there blocking inconsistencies? | In your ECC system |
| SAP Readiness Check | What does the overall picture look like, as a report? | Data collected from your system, analyzed in an SAP-hosted app |
| Maintenance Planner | Which software versions and add-ons can I combine in the target? | SAP-hosted web app that produces a stack file |
| ATC with S/4HANA checks | Which custom code objects break? | In your ECC or a central check system |
The Simplification Item Catalog
A simplification item is SAP's description of one change between ECC and S/4HANA. Examples are the replacement of customer and vendor masters by Business Partner, and the removal of the stored aggregate tables in finance. Each item in the catalog typically contains:
- A title and the affected application area.
- A description of the change and its business impact.
- Required and recommended actions, such as data migration steps or process changes.
- Links to SAP Notes with technical detail.
- A flag that says whether custom code is affected.
The catalog is organized by target release, because later releases remove or change more. An item that is only a warning in one release can become a hard requirement in another. Always read the catalog for the release you plan to target, not the latest one by default.
Reading the whole catalog is not useful. It lists changes for every module and industry. The Simplification Item Check narrows it to your system.
The Simplification Item Check
The check is a report that you run in the ECC system. It is delivered through an SAP Note (the note number has been 2399707, but confirm it in SAP's documentation) and the report name is /SDF/RC_START_CHECK. You pick the target release, and it returns two kinds of result:
- Relevance: whether each simplification item applies, based on what the system actually uses, such as active business functions and used transactions.
- Consistency: whether the data blocks the conversion. An example is a customer or vendor record that cannot be converted into a Business Partner because of inconsistent data.
The same checks run again as pre-checks inside the conversion tool, the Software Update Manager (SUM). An error that stops SUM in the production cutover window is expensive. Run the checks early so you find and fix those errors in a sandbox copy instead.
SAP Readiness Check
SAP Readiness Check is a self-service analysis that turns system data into a report. You install a data collection note in the ECC system, run the collection job, and upload the result to the SAP-hosted app. The app produces a dashboard.
Typical areas in the report:
- Simplification items that are relevant to your system, with their effort and priority.
- Add-on and business function compatibility.
- Custom code scope, including how many objects the S/4HANA checks flag.
- Recommended SAP Fiori apps, based on the transactions your users run.
- Data volume, which affects the target HANA memory size and the downtime window.
- Interface, integration and data quality findings, such as the Business Partner approach.
The report is a scoping tool. It tells you where to look and how big the work is. It does not fix anything, and it does not replace a test conversion. Run it on a copy of production or on production itself. A development system with little data and few active processes gives a misleadingly small result.
Maintenance Planner
Maintenance Planner works out which software you can install together. It checks that your product versions, add-ons, and support package levels have a valid combination in the target release. Then it produces a download basket and a stack.xml file that SUM uses for the conversion.
It needs to know your current system landscape. This information normally reaches it from SAP Solution Manager or from another system data transfer. If the system data is outdated, the plan is outdated too. The planner also tells you when an add-on has no S/4HANA-compatible version. That is a decision point. You must upgrade the add-on, replace it, or accept that the target release is blocked.
Custom code analysis
Custom code is usually where effort estimates go wrong. The standard approach has three steps.
- Measure what is used. Switch on the ABAP Call Monitor (
SCMON) in production for a full business cycle, ideally a year including period-end and year-end. Aggregate the data withSUSG. Objects that nothing calls are candidates for deletion rather than adaptation. - Run the S/4HANA readiness checks. The ABAP Test Cockpit (ATC) has a check variant named
S4HANA_READINESS(newer releases add a release suffix). It flags code that uses removed or changed objects. A central ATC system can check one or more remote ECC systems, so you do not have to touch each system. - Adapt after the conversion. Many findings can only be fixed in the converted system. SAP provides a Custom Code Migration app in the S/4HANA system that lists the findings and helps with the changes.
Not every finding is equally serious. Table access is a good example. Reads of old tables such as MKPF and MSEG often continue to work through compatibility views. Direct writes to them do not. Code that reads stored finance aggregates must change if it needs the new data model. Here is a typical before and after for a movement query:
REPORT z_movement_example.
PARAMETERS:
p_matnr TYPE matnr OBLIGATORY,
p_werks TYPE werks_d OBLIGATORY.
START-OF-SELECTION.
" ECC style: join header and item tables
SELECT m~mblnr, m~mjahr, i~zeile, i~matnr, i~werks, i~menge
FROM mkpf AS m
INNER JOIN mseg AS i
ON i~mblnr = m~mblnr
AND i~mjahr = m~mjahr
WHERE i~matnr = @p_matnr
AND i~werks = @p_werks
INTO TABLE @DATA(lt_old).
" S/4HANA style: one table holds the item data
SELECT mblnr, mjahr, zeile, matnr, werks, menge
FROM matdoc
WHERE matnr = @p_matnr
AND werks = @p_werks
INTO TABLE @DATA(lt_new).
cl_demo_output=>display( lines( lt_new ) ).The first query is not the one to worry about. The ATC findings that need real work are the ones that write to the old tables, append custom fields to them, or depend on their physical structure. Sort the findings by that kind of impact, not by count.
Putting the tools in sequence
The tools build on each other. The catalog informs the check, the check feeds the Readiness Check, and the planner and code analysis feed the decision.
Common errors
- Checking against the wrong target release. The catalog and checks differ per release. A clean result for one release says little about another.
- Running the tools only on development. Relevance depends on what the system actually uses, and development rarely mirrors that.
- Treating the report as a decision. A low "effort" rating still excludes things the report cannot see, such as external interfaces and process changes.
- Measuring custom code usage for a short window. Month-end and year-end programs look unused if you monitor for two weeks.
- Ignoring add-ons until late. A third-party add-on with no S/4HANA version can block a conversion, and fixing it depends on another vendor's schedule.
- Skipping the data checks. Business Partner and finance consistency errors surface as SUM errors during the conversion if you do not clean them earlier.
Exercises
Exercise
Why can a Simplification Item Check run on a development system give a misleading result, and where should you run it instead?
Show answer
Relevance results depend on which functions, transactions and data the system actually uses. A development system usually has little data and few active processes, so it reports fewer relevant items and fewer data inconsistencies than production would. Run it on a recent copy of production (or on production itself) for the target release you plan to use.
Exercise
Your Maintenance Planner run reports that a third-party add-on has no version compatible with the target release. Name two options and the main risk of each.
Show answer
Option 1: replace the add-on with another product or standard S/4HANA functionality. The risk is process change and rework. Option 2: wait for or ask the vendor for a compatible version, or move the target date. The risk is that the vendor's schedule now controls your project timeline. Removing the add-on without a replacement is also possible, but only if the business no longer needs it.
Exercise
An ATC run with the S/4HANA readiness variant shows 4,000 findings. How do you decide where to start?
Show answer
First use SCMON and SUSG usage data to remove findings in objects that nothing calls, since they can be deleted instead of fixed. Then rank the rest by type of impact. Code that writes to replaced tables, extends them, or depends on removed aggregates comes first. Read-only access that works through compatibility views can wait until after the conversion.