Updating the Spec and Tech Pack After Approval
Assume you know basic garment construction terms, can read a spec sheet, and understand how to measure a sample. This chapter focuses on the controlled update that follows a fit approval. The goal is to make the approved version the single production reference without losing the history of earlier decisions.
Freeze the approved baseline
An approval applies to a defined combination of style, color, size, sample round, and approval status. Record these details before editing anything.
For example:
| Field | Approved record |
|---|---|
| Style | 1042 Woven Shirt |
| Sample round | Fit sample 3 |
| Size checked | M |
| Status | Approved with comments |
| Approval date | 2026-11-28 |
| Approver | Product development lead |
Save the approval record with the sample photos, measurement sheet, and final fit comments. Do not overwrite the previous tech pack. Create a new revision, such as TP-1042 Rev C.
Convert comments into controlled updates
Review every approved comment and decide where it belongs. A measurement change belongs in the spec sheet. A sewing change belongs in the construction page. A material change belongs in the bill of materials, or BOM, which lists the components used to make the garment.
Use the original comment as the reason for the change. Record the old value, new value, location, and affected sizes.
| Update | Old value | New value | Applies to |
|---|---|---|---|
| Sleeve length, from shoulder seam | 24.5 in | 24.0 in | All sizes |
| Collar stand height | 1.25 in | 1.25 in | No change |
| Waist at finished garment | 34.0 in | 34.5 in | Size M only, then review grading |
A change for one fitting size may reveal a grading problem. Before releasing the revision, check whether the adjustment should flow to all sizes. The pattern maker or technical designer should confirm the grade rule rather than copying the same absolute change into every size.
Update the complete tech pack
A useful revision updates every page affected by the approval:
- Cover page: revision number, date, and approval status.
- Spec sheet: approved points of measure, tolerances, and measurement method.
- Construction page: seam, stitch, pressing, and finishing instructions.
- BOM: fabric, trims, labels, thread, and approved substitutions.
- Artwork and labels: approved placement, size, color, and wording.
- Grading page: changes to the base size and size increments.
- Sample comments: closed comments and any open production risks.
Keep unchanged values visible in the revision history. “No change” confirms that the value was reviewed. It is stronger than silently carrying an old value forward.
Review before release
Use a change log to make the update auditable. Compare the revised pack with the approved sample, not only with the previous file. Check that units, tolerances, measurement diagrams, and seam references agree.
Ask a second reviewer to verify:
- Every approved comment is closed or clearly assigned.
- Every changed measurement appears in the pattern and spec.
- The size range and grading instructions are consistent.
- The factory can identify which revision to use.
- Previous revisions are archived and cannot be mistaken for the current one.
Send the factory the approved revision through one controlled channel. State the revision number and effective date in the message. Request confirmation that the factory received the correct file.
Exercise
A fit sample is approved with a 0.5-inch sleeve reduction in size M. What should you do before changing every size in the spec?
Show answer
Ask the pattern maker or technical designer to confirm whether the change is a base-size correction or a grading correction. Then update the affected sizes and record the decision in the revision history.