Treat each sample as a numbered revision
A comment round is one documented set of changes sent after reviewing a particular sample. Label the sample and the round together. For example, “Fit sample 2, comment round 1” is clearer than “latest comments.”
Use a consistent identifier that includes:
- Style number
- Sample type
- Size
- Sample number
- Date
- Comment round
A useful record might be:
| Field | Example |
|---|---|
| Style and sample | 1042, fit sample 2, size M |
| Round and date | Round 1, 2026-11-28 |
| Status | Approved with comments |
| Next action | Correct sleeve length, then send size set |
Keep the previous version attached to the record. Do not replace an old comment sheet with a revised one. The history shows what changed, when it changed, and whether a repeated problem was actually corrected.
Separate new, revised, and closed comments
Give every comment a unique number. Keep that number when the comment continues into another round.
A simple status system is:
- Open: The factory must make or verify the change.
- In progress: The change is being worked on but is not yet confirmed.
- Closed: The next sample meets the requirement.
- Superseded: A later decision replaced the comment.
- Not applicable: The comment no longer applies because the product or construction changed.
Do not mark a comment closed only because the factory says it was changed. Close it after checking the next sample, measurement, photo, or construction detail.
For a new round, copy open comments forward and add new findings separately. This prevents an unresolved issue from disappearing among new observations.
Compare versions, not memories
At the next review, compare the new sample with three references:
- The approved or current spec.
- The previous sample.
- The prior comment sheet.
For each comment, record the old condition, the requested change, the new condition, and the verification result. If a measurement changed from 35 inches to 34 inches against a 34-inch target, write that result. Avoid relying on phrases such as “looks better.”
A revision log can include:
| Comment | Previous condition | Requested revision | Next-sample result | Status |
|---|---|---|---|---|
| 1 | Waist 35 in, target 34 in | Reduce at side seams | 34.25 in | Closed |
If a change fixes one issue but creates another, record both facts. For example, reducing the waist may improve measurement accuracy but create drag lines at the side seam. The next comment should reference the earlier change so the factory understands the connection.
Keep approvals tied to the correct round
Record the approval status for the exact sample reviewed. “Approved with comments” does not mean every comment is optional. State which items must be corrected before production or before the next sample stage.
Before sending the record, check that:
- Every comment has an owner or factory action.
- Each measurement change includes a target and tolerance.
- Construction changes identify the location and method.
- Open comments are copied to the next round.
- The status matches the evidence reviewed.
- The current spec version is named.
Exercise
A factory reports that comment 3 was corrected, but the next sample still measures outside tolerance. How should you record it?
Show answer
Keep comment 3 open, record the new measurement, state the remaining difference from the target, and carry the comment into the next revision round.