Sub topic 11
Approval Statuses and What They Mean
Assume you can read a spec sheet, measure a garment, and identify basic construction details such as seams, darts, and hems. This chapter focuses on turning fit findings into a clear approval decision.
Approval is a production decision
An approval status tells the team what may happen next. It must describe both the sample's current condition and the action required from the factory. A comment list alone is not enough because different teams may interpret “approved” differently.
Use a controlled set of statuses. Define them in the tech pack or development system before the first fit session.
| Status | Meaning | Next action |
|---|---|---|
| Pending review | The sample has not received a complete evaluation | Measure, review, and record comments |
| Approved | The sample meets the agreed fit, measurement, and construction requirements | Use the approved version as the production reference |
| Approved with comments | The sample is acceptable for the next stage, but listed minor corrections remain | Correct every listed item and verify before production |
| Rejected or not approved | A major issue prevents the sample from moving forward | Make the required changes and submit another sample |
“Approved with comments” should not be used to hide unresolved major problems. If the change affects fit, grading, construction, safety, or the garment's appearance, the sample usually needs another approval round.
Decide from evidence
Review the sample in a consistent order:
- Confirm that the sample is the correct style, size, fabric, color, and sample round.
- Compare measured points of measure with the approved spec and tolerance.
- Evaluate fit, balance, and drape on the fit model or dress form.
- Check construction details that affect wear or production.
- Classify each issue as blocking, required before production, or minor.
- Select the status and record the reason.
A blocking issue prevents approval. Examples include a waist outside tolerance, a twisted side seam, restricted movement, incorrect grade rules, or a construction problem that could cause failure in wear.
A minor issue can support approval with comments only when it has a clear owner, a measurable correction, and a verification step.
issues = [
{"name": "waist", "severity": "major", "verified": False},
{"name": "thread trimming", "severity": "minor", "verified": False},
]
def approval_status(issues):
if any(issue["severity"] == "major" for issue in issues):
return "Rejected or not approved"
if any(not issue["verified"] for issue in issues):
return "Approved with comments"
return "Approved"
print(approval_status(issues))This simple rule is not a replacement for professional judgment. It demonstrates the key principle: a major unresolved issue blocks approval, while minor open items require documented follow-up.
Record the decision
Write the status with the sample identity, date, reviewer, and next step. For example:
Style 1042, size M, fit sample 2: Approved with comments. Correct sleeve length by reducing 0.5 in at the cuff edge. Re-measure on the next sample. Collar stand approved with no change.
Do not change the status silently. If a later measurement reveals a problem, record a new review rather than overwriting the earlier decision.
Approval decision flow
Use the status consistently
Before sending the decision, check that every comment has a measurable correction or a clear reason for no change. Confirm that the factory understands whether it should revise the current sample or proceed to the next stage. Store the decision with the comment round so the production team can identify the approved reference later.
Exercise
A sample is within measurement tolerance, but the armhole restricts movement and the side seam twists. Which status should you record?
Show answer
Record “Rejected or not approved.” These unresolved fit and balance problems are major issues, even though the measured points are within tolerance.