Sub topic 2
Where SIPOC Fits in DMAIC and Lean Six Sigma
This chapter assumes you know what a business process is, and that you know the terms customer, supplier, input and output. You do not need to have run a DMAIC project. The chapter explains the parts of DMAIC that SIPOC depends on.
Lean Six Sigma in one page
Lean Six Sigma combines two improvement traditions.
- Lean removes waste. Waste is any step, wait or handoff that the customer would not pay for.
- Six Sigma reduces variation. Variation is the spread in results. Two orders from the same process may arrive in two days or in nine. Customers feel that spread.
Both traditions work on a process, not on a person or a department. A process is a repeatable series of activities that turns inputs into outputs. Before a team can improve a process, it has to agree on what the process is. SIPOC is the tool that gets that agreement.
The DMAIC cycle
DMAIC is the standard method for improving an existing process. Its five phases run in order.
| Phase | Question it answers | Typical tools |
|---|---|---|
| Define | What problem are we solving, for whom, and where does the process begin and end? | Project charter, SIPOC, voice of the customer |
| Measure | How does the process perform today? | Data collection plan, baseline measures, process map |
| Analyze | Why does it perform that way? | Cause-and-effect diagram, data analysis |
| Improve | What change fixes the cause? | Pilot, solution selection |
| Control | How do we keep the gain? | Control plan, monitoring charts |
SIPOC belongs to Define. It is usually drawn at the start of the phase and refined before the phase closes.
Why SIPOC is a Define tool
The Define phase has one job: to produce a shared, written agreement about the problem and its scope. A SIPOC supports that job in four ways.
- It fixes the scope. Drawing the first and last process steps forces the team to say where the project starts and stops. This is the main defence against scope creep, where a project slowly grows until it cannot finish.
- It names the customers. The team cannot ask what customers want until it knows who they are. The Customers column is that list.
- It gives the team a common language. People from sales, the warehouse and finance often describe the same process in different words. A one-page picture lets them correct each other early.
- It stays small on purpose. A SIPOC has four to seven process steps. It can be read in a minute, so executives and sponsors can review it without a long briefing.
Compare this with the detailed process map that comes later in Measure. The detailed map shows decisions, rework loops, wait times and who does each task. That level of detail is useful for finding waste, but it is too heavy for agreeing scope. SIPOC comes first because you need a boundary before you can map the inside.
Why the order of work is not the order of the columns
The acronym reads Suppliers, Inputs, Process, Outputs, Customers. That is the direction material and information flow. It is not the best order to fill the diagram in. A common working order is:
- Set the boundaries.
- Write the process steps.
- Write the outputs.
- Identify the customers of those outputs.
- Write the inputs.
- Identify the suppliers of those inputs.
Teams that start at the Suppliers column tend to list every vendor they know, and the diagram loses focus. Starting at the process steps ties every other entry to something concrete. Later chapters walk through each step in this order. Here the point is that SIPOC is a Define-phase tool because it builds scope outward from the process itself.
What SIPOC hands to the rest of DMAIC
A SIPOC is not a deliverable on its own. Its entries feed other work, in this order.
| SIPOC content | Where it is used next | Phase |
|---|---|---|
| Process start and end points | Scope statement in the project charter | Define |
| Customers and their outputs | Voice-of-the-customer interviews and surveys | Define |
| Customer requirements on outputs | Candidate measures, such as delivery time or error rate | Measure |
| Process steps | Skeleton of the detailed process map | Measure |
| Inputs and suppliers | Questions about input quality, and supplier agreements | Analyze |
Two of these links matter most.
- Charter. The project charter is a short document that states the problem, goal, scope, team and timeline. The SIPOC supplies the scope line directly. For example, "From receipt of customer order to dispatch of invoice."
- Detailed map. The four to seven SIPOC steps become the headings under which you add detail. Each high-level step is expanded into its own sub-steps. If the SIPOC is wrong, the detailed map inherits the error.
A short worked example
Suppose a team is asked to reduce late deliveries in order fulfilment. Early in Define, the team drafts the SIPOC process steps:
- Receive order
- Check stock
- Pick and pack
- Ship order
- Invoice customer
The sponsor asks whether returns are part of the project. The team looks at the last step and the first step. Returns start after delivery, which is outside "Invoice customer." The team writes this into the charter scope as an exclusion. That decision took two minutes because the SIPOC was on the wall. Without it, the question might have surfaced three weeks later, after data had been collected on the wrong thing.
Next, the team lists customers: the buyer, the shipping team and the finance team. Voice-of-the-customer work in the same phase then asks each group what "on time" means. The buyer may mean "by the date promised on the confirmation." The shipping team may mean "packed before the carrier's cut-off." These answers become the measures used in Measure. The SIPOC did not produce those measures. It told the team whom to ask.
SIPOC outside a full DMAIC project
SIPOC is also used when no formal project exists.
- Lean events. In a short improvement workshop, a SIPOC is a quick way to align the room before a value stream or process walk.
- Onboarding. A new team member can read a SIPOC to learn what a process takes in and produces.
- Process ownership. An owner can use it as a one-page description when discussing handoffs with neighbouring teams.
- Design work. In DMADV, a related method used to design a new process, a SIPOC can describe the intended process in the Define phase.
In these settings the tool works the same way. Only the paperwork around it is lighter.
Limits and failure modes
SIPOC does not do everything, and some uses are wrong.
- It does not show sequence logic. There are no decisions, loops or parallel paths. If you need them, build the detailed map.
- It does not measure performance. A SIPOC lists what a process does, not how well. Measure comes later.
- It is a draft until checked. The first version comes from the team's memory, which is often wrong. Walking the real process and comparing it to the diagram is the check, covered in a later chapter.
- It can hide problems at the boundary. If the scope is set so narrowly that the real cause lies outside it, the project will not find the cause. Revisit the boundaries if Analyze points outside the diagram.
- It is not frozen. Updating the SIPOC after new findings is normal. Record the version and date so the charter and the diagram do not disagree.
Common misunderstandings about the DMAIC link
- "SIPOC is only for Six Sigma." Lean teams use it too. The tool predates the label "Lean Six Sigma" and belongs to both.
- "One SIPOC per project, drawn once." Large projects may have a top-level SIPOC and a SIPOC for each major step. Each stays at one page.
- "SIPOC replaces the process map." It does not. It is the first, coarse view, and the detailed map is the second.
Exercises
Exercise
A team is in the Define phase of a DMAIC project on invoice errors. Name two things the SIPOC gives the project charter and one thing it does not give the team.
Show answer
The SIPOC gives the charter the process start and end points (the scope statement) and the list of customers whose requirements must be studied. It does not give performance data, such as the current error rate. That comes from the Measure phase.
Exercise
A colleague wants to begin a SIPOC by listing every supplier the department uses. Explain why this is a weak starting point and say what to do first.
Show answer
Starting with suppliers produces a long list that is not tied to the process, so the diagram loses focus. First set the process boundaries and write four to seven high-level steps. Then list outputs, customers, inputs and suppliers, each linked to those steps.
Exercise
Midway through Analyze, data shows that most late deliveries come from a step that happens before "Receive order". What should the team do with the SIPOC and the charter?
Show answer
Revisit the boundaries. The cause lies outside the current scope, so the team should discuss widening the start point with the sponsor, update the SIPOC with a new version and date, and amend the charter scope so both documents agree.