Sub topic 13
Common mistakes and how to avoid them
This chapter assumes you can already name the five SIPOC columns, set a process start and end point, and write four to seven high-level steps. It covers the errors that show up most often in real SIPOC diagrams, why each one happens, and how to fix it. Examples use the order-fulfilment SIPOC from earlier chapters.
Why SIPOC mistakes matter
A SIPOC diagram is a scoping tool. In the Define phase of DMAIC, the team uses it to agree on what is inside the project and what is outside. If the diagram is wrong, the project charter, the detailed process map and the customer study built on it inherit the error. A diagram that is too detailed hides the scope. A diagram with swapped columns sends the team to interview the wrong people.
Most mistakes fall into four groups: scope, steps, columns, and process of building. The sections below follow that order.
Scope mistakes
No agreed start and end
If the team never states where the process begins and ends, each member draws a different process. One person starts at "customer places order" and another at "sales quotes the customer". The steps then overlap or leave gaps.
Fix: write the boundary as two sentences before drawing anything. For example: "The process starts when a confirmed customer order enters the order system. It ends when the invoice is sent." Put both sentences at the top of the page.
Scope too wide
"Run the business" is not a process for a SIPOC. A scope this wide produces steps such as "Sell", "Make", "Deliver" and "Get paid". These steps are true but give a project team nothing to measure or improve.
Fix: pick one process that has a clear owner and a measurable output. A useful test is whether one person could be named as the process owner. If no one person could own it, the scope is probably too wide.
Scope too narrow
The opposite error is a scope of one task, such as "Print shipping label". The diagram then has one step and the team cannot see the suppliers and customers that matter. Four to seven steps is the working range because it is large enough to show the flow and small enough to fit on one page.
Fix: widen the boundary until you can write at least four steps that each produce something a later step uses.
Step mistakes
Too much detail
The most common mistake is writing a detailed process map in the middle column. Signs include more than seven steps, steps such as "Click Save" or "Email Priya", and more rows in the Process column than in any other column.
Fix: group steps that happen together under one verb-and-noun label. Compare the two versions below.
| Too detailed | High level |
|---|---|
| Open order email | Receive order |
| Copy order into system | Receive order |
| Look up SKU in stock sheet | Check stock |
| Compare quantity with stock | Check stock |
| Print pick list | Pick and pack |
| Collect items from shelves | Pick and pack |
| Box items and add packing slip | Pick and pack |
If a step name needs "and" twice, it probably holds several steps. If you can only describe it by a click or a keystroke, it is too small.
Vague labels
Labels such as "Processing", "Admin" or "Order" do not say what happens. A noun alone also hides who does what to what. Use a verb followed by a noun: "Check stock", "Ship order", "Invoice customer".
Decisions and rework loops
A SIPOC has no diamonds, no "if stock is low, then..." branches, and no arrows back to earlier steps. Teams often try to add them because they know about the exceptions. Exceptions belong in the detailed process map that follows. If an exception is important to scope, such as backorders, note it in the boundary statement or in a side note.
Column mistakes
Suppliers and customers swapped
This happens because people think about who they work with, not about direction. A supplier provides an input. A customer receives an output. The same person or team can appear in both columns, and that is correct.
In the order example, the Finance team appears as a supplier because it provides pricing rules. It also appears as a customer because it receives the invoice. This is not a duplicate. It is two different roles.
Fix: use two test questions for every name.
- Does this party hand something to the process? If yes, they are a supplier, and that item belongs in Inputs.
- Does this party receive something from the process? If yes, they are a customer, and that item belongs in Outputs.
Inputs and outputs confused
An output of one step is an input of the next step, so the same item can look like either. The SIPOC columns refer to the whole process, not to individual steps. An input is something that enters at or after the start boundary from outside. An output is something that leaves at or before the end boundary to someone outside.
"Picked items" in the earlier example is a good case. It is produced by one step and used by the next, so it is internal. Whether it also belongs in the Outputs column depends on whether the shipping team is treated as a customer who receives it. State that decision, and be consistent about it.
Fix: for each item, ask where it goes. If it stays inside the process boundary, leave it out of the SIPOC, or keep it only if an outside party really receives it.
Listing everything
A complete list of every input and output makes the table long. The aim is the significant ones. A good working limit is three to six items per column.
Missing customer requirements
A SIPOC without requirements tells the team who gets an output but not what makes it good. Requirements can be a short note beside each main output, such as "Order confirmation: within 1 hour" or "Parcel: correct items, undamaged". Without them, later work has no basis for deciding what counts as a defect.
Fix: add a requirement for each of the two or three most important outputs. If nobody knows the requirement, mark it "to be confirmed" and take it to the voice-of-the-customer study.
Mixing internal and external customers without saying so
Both are valid. The mistake is listing only internal teams and forgetting the end customer, or the reverse. Check that at least one external customer, or the final recipient of the value, appears.
Building and checking mistakes
Drawing it alone
A SIPOC drawn by one person reflects that person's view. People upstream and downstream often see different suppliers and customers. Run a short workshop with people who work in the process and at least one person from each side of the boundary.
Drawing columns in reading order
The acronym reads S, I, P, O, C, but most teams find it easier to start with the process. Drawing the suppliers first often leads to a list of vendors with no link to steps. Start with the boundary, then the steps, then outputs, customers, inputs and suppliers.
Never checking against the real process
A diagram built in a meeting room describes how people think the process works. Walk through it with someone who does the work, or follow one real order from start to end. Differences between the diagram and the real process are findings, not errors. Record them.
Treating the diagram as finished
Teams sometimes file the SIPOC after the first workshop. It should be revised when the charter, the process map or the customer data reveal that a step, customer or boundary was wrong. Put a date and version on the page.
A quick review checklist
Run through this list before you accept a SIPOC.
| Check | Pass condition |
|---|---|
| Boundary | Start and end are written down |
| Steps | Four to seven, each a verb and a noun |
| Detail | No clicks, no decisions, no loops |
| Suppliers | Each one provides at least one input |
| Customers | Each one receives at least one output |
| Roles | A party in both columns has a reason for each role |
| Requirements | Main outputs have a requirement or "to be confirmed" |
| Evidence | Compared with one real case |
Worked example: fixing a flawed diagram
Here is a first draft of a SIPOC for the order process.
| Suppliers | Inputs | Process | Outputs | Customers |
|---|---|---|---|---|
| Everyone | Stuff | Sell | Money | Everyone |
| Make | ||||
| Deliver |
The problems are:
- No boundary statement, and the scope is the whole business.
- Steps are single nouns or verbs with no object.
- "Everyone", "Stuff" and "Money" are not specific enough to act on.
- No requirement for any output.
A corrected version narrows the scope to order fulfilment and uses specific entries:
Boundary: starts when a confirmed customer order enters the order system; ends when the invoice is sent.
| Suppliers | Inputs | Process | Outputs | Customers |
|---|---|---|---|---|
| Sales team | Customer order | 1. Receive order | Order confirmation (within 1 hour) | Customer |
| Warehouse system | Stock levels | 2. Check stock | Packed parcel (correct items, undamaged) | Customer |
| Carrier | Shipping label | 3. Pick and pack | Shipping notice | Customer |
| Finance team | Pricing rules | 4. Ship order | Invoice (accurate, on time) | Customer, Finance team |
| | | 5. Invoice customer | | |Each row still reads independently. The columns are lists, and a row does not link an input to an output in the same line.
Exercise
A team lists "Shipping team" as a supplier because they work closely with the warehouse. In the order-fulfilment process, the shipping team receives the packed parcel and prepares it for the carrier. Which column should the shipping team be in, and what test shows this?
Show answer
The shipping team belongs in the Customers column, because it receives an output (the packed parcel) from the process. The test is direction: a supplier hands something to the process as an input, and a customer receives something from the process as an output. Working closely with a team does not decide the column. The team would only also be a supplier if it handed an input, such as a carrier booking, into the process.
Exercise
A draft SIPOC has eleven process steps, including "Open email", "Copy details into system" and "Click Submit". Name two problems and describe how to repair them.
Show answer
The diagram has too much detail (eleven steps, above the four-to-seven range) and the steps are at keystroke level, not at the level of a verb and a noun for a meaningful activity. To repair it, group the related steps under higher-level labels such as "Receive order", and keep the click-level detail for the detailed process map later.