Sub topic 11
NPV versus IRR Ranking Conflicts and Project Pitfalls
This chapter assumes you can compute NPV and IRR for a conventional project, and that you know the decision rules: accept when NPV is positive, or when IRR exceeds the required rate of return. Here you will see when the two measures rank projects differently, which one to trust, and what other mistakes distort project analysis.
When NPV and IRR agree and when they do not
For a single independent project with conventional cash flows (one outflow, then inflows), NPV and IRR always give the same accept or reject answer. The NPV is positive exactly when the IRR is above the required rate.
Conflicts appear in two situations:
- Mutually exclusive projects. You can pick only one, so the projects must be ranked.
- Non-conventional cash flows. The sign of the cash flows changes more than once, which can produce several IRRs or none.
For independent projects with conventional cash flows there is nothing to rank, so NPV and IRR cannot conflict.
Why rankings conflict
NPV measures value added in currency units. IRR measures a percentage return. Rankings diverge for two reasons:
- Scale. A small project can have a high IRR but a small NPV. A large project can have a lower IRR but add more value.
- Timing. A project with early cash flows has a high IRR. A project with late cash flows has a lower IRR but may be worth more at a low discount rate.
IRR implicitly assumes each interim cash flow is reinvested at the IRR itself. NPV assumes reinvestment at the required rate of return, which is a more realistic assumption. This is why the CFA curriculum treats NPV as the better criterion. NPV is the change in shareholder wealth. IRR is only a rate.
Worked example: a timing conflict
Project E returns cash early. Project L returns one large payment late. Both cost 1,000 today, and the required rate is 8%.
| Year | Project E | Project L |
|---|---|---|
| 0 | -1,000 | -1,000 |
| 1 | 900 | 0 |
| 2 | 300 | 0 |
| 3 | 0 | 1,500 |
def npv(rate, cash_flows):
return sum(cf / (1 + rate) ** t for t, cf in enumerate(cash_flows))
def irr(cash_flows, lo=-0.99, hi=1.0, iterations=200):
# Bisection; valid when there is a single sign change
for _ in range(iterations):
mid = (lo + hi) / 2
if npv(mid, cash_flows) > 0:
lo = mid
else:
hi = mid
return (lo + hi) / 2
e = [-1000, 900, 300, 0]
l = [-1000, 0, 0, 1500]
incremental = [b - a for a, b in zip(e, l)] # L minus E
print("NPV at 8%:", round(npv(0.08, e), 2), round(npv(0.08, l), 2))
print("IRR:", round(irr(e), 4), round(irr(l), 4))
print("Crossover rate:", round(irr(incremental), 4))
# NPV at 8%: 90.53 190.75
# IRR: 0.1589 0.1447
# Crossover rate: 0.135At 8%, L has the higher NPV (190.75 against 90.53). E has the higher IRR (15.89% against 14.47%). The two rules disagree. Because the projects are mutually exclusive, you choose L, the project with the higher NPV.
The crossover rate
The crossover rate is the discount rate at which two projects have equal NPV. You find it as the IRR of the incremental cash flows, which are the cash flows of one project minus the other. Here that IRR is 13.5%.
- Below 13.5%, L has the higher NPV.
- Above 13.5%, E has the higher NPV.
- At 13.5%, the two are equal.
The NPV profile of each project is its NPV plotted against the discount rate. The profiles cross at the crossover rate. A conflict exists only when the required rate falls to the left of the crossover, as 8% does here. If the required rate were 15%, both rules would pick E.
Non-conventional cash flows: multiple IRRs and no IRR
A non-conventional cash flow pattern has more than one sign change. An example is a mine that needs a large cleanup payment at the end. The IRR equation can then have several solutions.
Take the flows -100, +230, -132:
def npv(rate, cash_flows):
return sum(cf / (1 + rate) ** t for t, cf in enumerate(cash_flows))
flows = [-100, 230, -132]
for r in (0.10, 0.15, 0.20):
print(r, round(npv(r, flows), 2))
# 0.1 0.0
# 0.15 0.19
# 0.2 0.0NPV is zero at both 10% and 20%, so the project has two IRRs. The IRR rule cannot say which one to use. NPV still works: at a 15% required rate, NPV is positive (0.19). The project is acceptable only for required rates between 10% and 20%.
Some patterns have no real IRR at all. The practical rule is to use NPV whenever the cash flows are non-conventional.
Other ways to rank and adjust
- Profitability index (PI). PI is the present value of future cash flows divided by the initial outlay. It equals 1 plus NPV divided by the outlay. Under capital rationing (a fixed budget), ranking independent projects by PI helps you pick the set with the highest total NPV.
- Unequal project lives. Comparing the raw NPV of a 3-year and a 6-year project is unfair. Compare them over a common horizon, or convert each NPV into an equivalent annual annuity.
- Modified IRR (MIRR). MIRR fixes the reinvestment assumption by compounding the inflows at the required rate. It also yields a single answer.
Pitfalls in building the cash flows
Good decision rules cannot rescue bad inputs. The most common errors are in the cash flow estimates.
| Pitfall | Correct treatment |
|---|---|
| Sunk costs (already spent, for example past R&D) | Exclude them. Only incremental cash flows matter. |
| Opportunity costs (for example, land the firm already owns) | Include the cash the asset could earn in its next best use. |
| Externalities (cannibalization of existing sales, or complementary sales) | Include the effect on other products' cash flows. |
| Financing costs (interest, dividends) | Exclude them from the cash flows. The discount rate already captures them. |
| Taxes and depreciation | Use after-tax cash flows. Depreciation matters only through its tax shield. |
| Inflation | Use nominal cash flows with a nominal rate, or real cash flows with a real rate. Never mix them. |
| Working capital | Include the investment in working capital, and its recovery at the end. |
| Optimism and overconfidence | Use expected, not best-case, cash flows. Test them with sensitivity and scenario analysis. |
Exam tips
- For mutually exclusive projects, the answer is the higher NPV. Do not choose by IRR.
- A conflict requires the required rate to be below the crossover rate.
- If you see several sign changes, expect multiple IRRs and use NPV.
- Check each item in a cash flow list against the pitfall table before computing anything.
Exercise
Project X has NPV of 50 and IRR of 18%. Project Y has NPV of 80 and IRR of 14%. They are mutually exclusive, and the required rate is 10%. Which project should you choose, and why do the rankings differ?
Show answer
Choose Project Y, because it has the higher NPV and so adds more shareholder wealth. The rankings differ because of differences in scale or timing. Project X probably has a smaller outlay or earlier cash flows, which raises its IRR. IRR also assumes reinvestment at the IRR itself, while NPV assumes reinvestment at the 10% required rate.
Exercise
A firm evaluates a new product. It spent 40,000 last year on market research. The product will reduce sales of an existing product by 25,000 a year after tax. Interest on the loan that finances the project is 12,000 a year. Which of these items belong in the project's incremental cash flows?
Show answer
Only the 25,000 annual loss from cannibalization belongs, as a negative cash flow. The 40,000 research cost is sunk and is excluded. The 12,000 interest is a financing cost already reflected in the discount rate, so it is excluded.