Sub topic 7
Common mistakes and how to fix them
What this chapter assumes
This chapter assumes you already know the four RACI roles, can read a matrix with tasks as rows and roles as columns, and know the rule of exactly one Accountable owner per task. It also assumes you have built at least one matrix from a task list. If a letter code is unfamiliar, review the earlier chapters first.
Most RACI matrices fail in a small number of ways. Each failure has a symptom you can see in the table and a repair you can apply in a few minutes. This chapter lists the common mistakes, shows how to spot each one, and gives a fix. It ends with a script that finds several of them automatically.
Why mistakes cluster
A RACI matrix is easy to fill in and hard to fill in well. Filling in cells requires no special skill, so people fill them quickly, usually in a meeting, and usually to avoid an argument. The mistakes follow from that:
- Structural mistakes break the rules of the model: no Accountable, two Accountables, no Responsible.
- Inflation mistakes add marks that carry no real meaning: Consulted and Informed everywhere.
- Fit mistakes make the matrix a poor picture of the real work: tasks too coarse, roles that are really groups, one person carrying everything.
- Lifecycle mistakes let a correct matrix go stale or never reach the people it describes.
The first group can be checked mechanically. The others need judgment, but each has warning signs.
Mistake 1: Zero or multiple Accountable owners
Symptom. A task row has no A, or has two or more.
Why it happens. Two senior people both want to be seen as owning an important task, and the group avoids the conflict by marking both. Or nobody wants to own an uncomfortable task, and the A is left blank "for now".
Why it matters. Accountable is the person who answers for the outcome and has the final say. With two, each can assume the other will decide, or both decide differently. With none, a missed deadline has no owner to ask.
Fix. Pick one person by asking: "If this fails, whose explanation does the sponsor want to hear?" Then move the other person to Consulted if their input is needed before the decision, or to Informed if they only need the result.
Here is a before and after for an approval task:
| Task | Sponsor | Product owner | Finance lead |
|---|---|---|---|
| Approve budget (before) | A | A | R |
| Approve budget (after) | A | C | R |
In the "after" row the sponsor is the only A, the product owner's input is kept as C, and the finance lead still does the work.
Mistake 2: Accountable assigned to a group
Symptom. A column is named "Steering committee", "Engineering", "The team", or "Management", and it holds an A.
Why it matters. A group cannot be held to account. When the committee is Accountable, every member can reasonably believe someone else is following up. The rule exists to produce one name, not one box on an org chart.
Fix. Name a person or a single role held by one person, such as "Release manager". The committee can still appear in the matrix as Consulted, or as Responsible for a task that needs the whole group, such as reviewing a proposal. The A still sits with the individual who chairs it or answers for its output.
A related problem is mixing people and roles in the same header row. If "Priya" and "Developer" are both columns, it is unclear whether Priya is also a Developer and whether her cells overlap with that column. Use roles in the columns, and keep a separate lookup from role to person.
Mistake 3: Nobody is Responsible
Symptom. A row has an A but no R, or the only R belongs to someone who has left the project.
Why it happens. The Accountable person is assumed to do the work, but the row does not say so. Or the work falls between two teams and each assumes the other will do it.
Fix. Ask who will actually do the work. If the answer is the Accountable person, mark the cell A/R, as in the single-person example from the layout chapter. If the answer is "someone on another team", name that role and confirm with them. A row with an A and no R is a decision-maker with nobody to carry out the decision.
Do not treat A/R as a failure. It is correct for small tasks where one person both owns and does the work. The mistake is using A/R everywhere. If most rows are A/R, you are probably listing tasks too small, or the project has so few people that the matrix adds little.
Mistake 4: Too many Consulted and Informed marks
Symptom. Rows with five or more C or I marks, or a matrix where almost every cell is filled.
Why it happens. Adding a C or I feels free and polite. Leaving someone off feels risky. Nobody objects to being included, so marks accumulate.
Why it matters. Consulted means a two-way conversation before the decision. Each C adds waiting time and the chance of conflicting advice. Informed means a one-way message after the fact. Each I adds noise, and people stop reading messages that rarely concern them. A matrix full of C and I does not show who matters on a task, because it marks everyone.
Fix. Apply a test to each C and I:
- Would the task result be worse if this person were not consulted? If not, drop the C.
- Does this person need to act, or change a plan, because of the result? If not, drop the I, or move them to a status report they can read on their own schedule.
- Can several people be represented by one? Consult the lead, and let the lead gather the team's views.
A practical limit is about two or three Consulted per task. This is a guideline, not a rule of the model. Some tasks, such as a security review, legitimately need more.
Cells that are blank are valid and often correct. A blank cell means "no involvement", and that information is useful.
Mistake 5: One person carries too much
Symptom. One column holds a large share of the A or R marks. A common case is the project manager, who is marked A for nearly every row.
Why it happens. The project manager built the matrix and defaulted to themselves. Or the team treats "Accountable" as "the person who tracks it", which is not the same as the person who owns the result.
Why it matters. An overloaded person becomes a bottleneck, and decisions that should be made by the technical or business owner wait on someone who lacks the context. It also hides who really owns outcomes: the project manager answers for the schedule, not for the quality of a design or the legal wording of a contract.
Fix. Count the A and R marks per column. For each A on the overloaded person, ask whether another role has both the authority and the knowledge to own the task. Move the A there and keep the overloaded person as C or I. For R overload, check whether the work can be split, delegated, or scheduled differently. If the same person is R on tasks that run at the same time, no reassignment of letters will fix it. That needs a change to the plan.
The reverse also happens. A column with no marks at all means either the role does nothing on this project, or the tasks do not capture what they do. Both are worth checking.
Mistake 6: Tasks at the wrong level of detail
Symptom, too coarse. Rows such as "Develop the product" or "Manage the project". A single row hides several owners and different people do different parts.
Symptom, too fine. Fifty rows for a three-week project, most of them A/R for the same person. The matrix is no longer readable and nobody will keep it current.
Fix. Aim for rows that match decisions or deliverables, where the answer to "who owns this?" could plausibly differ from the next row. If two adjacent rows always have the same owner and the same C and I marks, merge them. If a row's A and R people would reasonably disagree about what "done" means, split it.
A rough working size is 10 to 30 rows for a project that needs a matrix at all. Larger efforts are better handled with one matrix per workstream, with a short top-level matrix that shows the owner of each workstream.
Mistake 7: Confusing authority with involvement
Symptom. The Accountable person lacks the authority to make the decision, for example a team lead marked A on a budget they cannot approve.
Why it matters. Accountable combines two things: answering for the result, and having the power to decide. If either is missing, the A is nominal. The team lead will escalate every question, and the real decision-maker is invisible in the matrix.
Fix. Test each A against the actual approval path. If the budget is approved by the sponsor, the sponsor is A, even if that feels senior for the task. The team lead becomes R for preparing the request.
A second version of this mistake is treating Consulted as a veto. If someone must approve before work proceeds, that is a decision right and belongs with the A. If a C can block work, either they are the real A, or the process needs a clear rule about when their objection stops the task.
Mistake 8: Built once, never used
Symptom. The matrix lives in a kickoff document. When a question arises ("Who signs off on this?"), people ask in chat instead of checking it.
Why it matters. An unused matrix does not clarify anything. The next chapter covers keeping it current and shared. For now, note the warning signs: no date or version, no named owner of the matrix itself, and roles that no longer exist.
Fix. Give the matrix one owner (often the project manager), a "last reviewed" date, and a place where people actually look. Refer to it in meetings when ownership is unclear, so it becomes the first place people check.
Finding structural problems with code
The structural mistakes and several inflation and overload mistakes can be checked mechanically. The function below extends the simple validator from the validating chapter. It flags rows with the wrong number of A marks, rows with no R, rows with too many C or I marks, and any role that is Accountable for more than a set share of tasks.
def audit_raci(matrix, max_consulted=2, max_informed=3, max_accountable_share=0.5):
problems = []
accountable_counts = {}
for task, roles in matrix.items():
codes = {role: code for role, code in roles.items() if code}
accountable = [r for r, c in codes.items() if 'A' in c]
responsible = [r for r, c in codes.items() if 'R' in c]
consulted = [r for r, c in codes.items() if 'C' in c]
informed = [r for r, c in codes.items() if 'I' in c]
if len(accountable) != 1:
problems.append(f'{task}: expected 1 Accountable, found {len(accountable)}')
if not responsible:
problems.append(f'{task}: no one is Responsible')
if len(consulted) > max_consulted:
problems.append(f'{task}: {len(consulted)} Consulted, limit is {max_consulted}')
if len(informed) > max_informed:
problems.append(f'{task}: {len(informed)} Informed, limit is {max_informed}')
for role in accountable:
accountable_counts[role] = accountable_counts.get(role, 0) + 1
total = len(matrix)
for role, count in accountable_counts.items():
if count / total > max_accountable_share:
problems.append(f'{role}: Accountable for {count} of {total} tasks')
return problems
matrix = {
'Write requirements': {
'Product owner': 'A', 'Business analyst': 'R', 'Developer': 'C',
'Tester': 'C', 'Designer': 'C', 'Sponsor': 'I',
},
'Build feature': {
'Product owner': 'A', 'Developer': 'R', 'Sponsor': 'I',
'Business analyst': 'I', 'Designer': 'I', 'Tester': 'I',
},
'Approve release': {'Product owner': 'A', 'Sponsor': 'A'},
'Write user guide': {'Product owner': 'A', 'Business analyst': 'R'},
}
for problem in audit_raci(matrix):
print(problem)
# Write requirements: 3 Consulted, limit is 2
# Build feature: 4 Informed, limit is 3
# Approve release: expected 1 Accountable, found 2
# Approve release: no one is Responsible
# Product owner: Accountable for 4 of 4 tasksThe function uses 'A' in c rather than c == 'A' so that an A/R cell counts as both Accountable and Responsible. Empty strings are skipped, so a blank cell counts as no involvement.
Two things the script cannot do are worth stating. It cannot tell whether the right person is Accountable, only whether exactly one person is. It also uses fixed limits, so treat its warnings as prompts for a conversation rather than errors. A Consulted count of three on a security review may be fine.
A repair workflow
When you inherit a matrix or review a draft, work through problems in order from the most structural to the most subjective. Fixing ownership first prevents you from tidying C and I marks on a row whose owner will change anyway.
The loop in the middle matters. Moving an A to a different role can change that role's load, and can leave the previous owner with no mark on the row. Recheck rows after any move.
Summary table
| Mistake | Symptom in the table | First fix |
|---|---|---|
| Zero or many A | Row has no A, or two or more | Choose one; demote the other to C or I |
| Group as A | Column named for a committee or team | Name one role or person |
| No R | Row has an A only | Name who does the work, or mark A/R |
| C and I inflation | Rows with many C or I marks | Apply the two tests; consult through leads |
| Overload | One column has most A or R marks | Move the A to the real owner; split the work |
| Wrong task size | Vague rows, or dozens of tiny rows | Merge or split by decision and deliverable |
| Authority mismatch | A has no power to decide | Move A to the approver; make the A holder R |
| Stale matrix | No date, no owner, departed roles | Name an owner and a review date |
Exercises
Exercise
A row reads "Approve design: Architect A, Tech lead A/R, Product owner C, QA I". Name the problem and give a corrected row.
Show answer
The row has two Accountable owners, the Architect and the Tech lead. Decide who has the authority to approve the design. If it is the Architect, the corrected row is "Architect A, Tech lead R, Product owner C, QA I". The Tech lead keeps R because they still do the work, and the A moves entirely to the Architect.
Exercise
Your matrix shows the project manager as Accountable for 14 of 18 tasks, including "Choose database engine" and "Review legal terms". Why is this a problem, and what is one repair?
Show answer
The project manager probably lacks the technical or legal authority to decide those tasks, so the A is nominal and decisions will queue up behind them. Move the A for "Choose database engine" to the technical lead or architect, and for "Review legal terms" to the legal or contracts owner. The project manager can remain C or I on these rows. Then recount each column.
Exercise
A task row has Consulted marks for six roles. Describe two tests you would apply, and one way to reduce the count without losing input.
Show answer
Test 1: would the result be worse without this person's input? Drop the C if not. Test 2: can another person represent them? Consult the lead of a group and let the lead gather the group's views. Replacing six individual C marks with the leads of two or three groups keeps the input and cuts waiting time.
Exercise
Run audit_raci on a matrix with one task, 'Deploy': {'Ops': 'A/R', 'Developer': 'C', 'Sponsor': 'I'}. With the default limits, what does it print, and why?
Show answer
It prints "Ops: Accountable for 1 of 1 tasks". The row itself passes: A/R counts as one Accountable and one Responsible, and there are 1 Consulted and 1 Informed. But Ops holds the A on 100% of the tasks, which is above the 50% limit. With a single task the warning is a side effect of a tiny matrix, which shows why the share check is a prompt and not a verdict.