Sub topic 9
Setting realistic targets and deadlines
A baseline tells you where you start. A target and a deadline tell you where you intend to be and by when. This chapter covers how to choose both so the objective is ambitious but defensible, and so the data can show whether you reached it.
This chapter assumes you can compare two percentages and know the common communication metrics (reach, engagement, sentiment). It also assumes you have already measured a baseline for the metric, as described in the previous chapter.
What a target is, and what it is not
A target is the value of one metric that you commit to reaching by a stated date. It is not a hope, and it is not a restatement of the activity plan. "Twenty media placements" is a plan for outputs. "Unaided awareness of 20%" is a target for an outcome.
A target has three parts:
- The starting value. This is your baseline, for example 12%.
- The size of the change. This is the gap you plan to close, for example 8 percentage points.
- The deadline. This is the date on which you will measure again, for example 30 September.
Say "percentage points" when you mean the absolute difference between two percentages. A move from 12% to 20% is 8 percentage points, or a 67% relative increase. Stakeholders often hear these as the same thing, so write both numbers in the objective when it matters.
Where realistic numbers come from
Never pick a target because it sounds round or impressive. Pull the number from evidence, in roughly this order of strength:
| Evidence | What it tells you | Main weakness |
|---|---|---|
| Your own past campaigns | What this team, budget and audience produced before | Conditions may have changed |
| Trend in the baseline data | Where the metric is heading without new effort | Short histories are noisy |
| Industry or sector benchmarks | A rough range for similar organizations | Different definitions and samples |
| Funnel arithmetic from the plan | What the planned activity could reach | Assumes conversion rates you may not have |
| Stakeholder expectation | What the organization wants | Often unconnected to the budget |
Use at least two of these. If your own history says campaigns of this size moved awareness by 3 to 5 points and the leadership team wants 8, the gap is a conversation to have before the objective is signed off, not after the results are in.
Funnel arithmetic as a sanity check
Work backwards from the target to the activity needed. Suppose the audience is 40,000 IT managers in the region. Moving unaided awareness from 12% to 20% means about 3,200 additional people who can name the product (40,000 × 0.08). If a past campaign made roughly 1 in 10 of the people it reached able to recall the brand, you must reach about 32,000 distinct people with the message. Is that plausible with your channels and budget? If your plan reaches 9,000, the target is out of range, and you should say so now.
Separate the committed target from the stretch target
Many teams keep two numbers. The commit is the level you expect to reach with normal effort and are willing to be held to. The stretch is the level you would reach if things go unusually well. Report against the commit, and treat the stretch as upside. An objective with only a stretch number produces a "failure" in most normal years.
The measurement noise problem
Survey-based baselines are estimates. If your baseline is 12% from a sample of 400 people, the true value could be a few points either side. A target must be larger than that noise, or you will not be able to tell success from chance.
The code below computes the 95% margin of error for the difference between two independent survey waves of the same size. It uses the standard normal approximation, which is acceptable when the sample is a few hundred or more and the percentages are not extremely close to 0% or 100%.
from math import sqrt
def change_margin(p_before, p_after, n, z=1.96):
"""95% margin of error for the difference between two survey waves,
each with n respondents, using the normal approximation."""
var_before = p_before * (1 - p_before) / n
var_after = p_after * (1 - p_after) / n
return z * sqrt(var_before + var_after)
def progress(baseline, current, target):
"""Share of the planned change achieved so far."""
return (current - baseline) / (target - baseline)
baseline, n = 0.12, 400
for target in (0.14, 0.20):
noise = change_margin(baseline, target, n)
change = target - baseline
detectable = change > noise
print(
f"target {target:.0%}: planned change {change * 100:.1f} points, "
f"noise +/-{noise * 100:.1f} points, detectable: {detectable}"
)
print(round(progress(baseline=0.12, current=0.16, target=0.20), 2))Running it prints:
target 14%: planned change 2.0 points, noise +/-4.7 points, detectable: False
target 20%: planned change 8.0 points, noise +/-5.1 points, detectable: Truefollowed by 0.5 for the progress line. A 2-point target cannot be verified with 400 respondents per wave. Either raise the target, enlarge the sample, or choose a metric that is less noisy. Raise the sample size first if the 2-point change really is what the business needs.
Choosing the deadline
A deadline is not simply "the end of the campaign". It must satisfy three conditions at once.
- It follows the lag. Outputs appear at once, outtakes within days or weeks, and outcomes such as changed attitudes or behavior usually take weeks to months. Measuring an outcome the week after a launch measures the wrong thing.
- It matches a measurement wave. If the brand survey runs quarterly, your deadline should fall right after a wave. A deadline of 15 September with a survey on 30 September gives you no data on the day.
- It fits the business calendar. Link the date to a decision that depends on the result, such as a budget review, a product launch or a funding round. A result that arrives after the decision cannot change it.
Use milestones along the way
A single end date leaves you blind for months. Add interim checkpoints at the points where each level of result should show up. The progress function above turns each checkpoint reading into a share of the planned change.
| Checkpoint | Level | Example reading | Question it answers |
|---|---|---|---|
| Week 4 | Output | 18 of 24 planned articles published | Is the plan being delivered? |
| Week 8 | Outtake | 31% of sampled readers recall the key message | Is the message landing? |
| Week 20 | Outcome | Unaided awareness at 16% | Is the audience changing? |
| 30 September | Outcome | Unaided awareness at 20% | Was the target met? |
Common errors and edge cases
- Setting the target before the baseline. A target of "25% awareness" means little if the baseline turns out to be 24%. Measure first, then choose.
- Ignoring seasonality. If you measured the baseline in a busy season and the deadline falls in a quiet one, the comparison is unfair. Compare the same period year on year, or run a control group that is not exposed to the campaign.
- Regression to the mean. An unusually low baseline will tend to rise by itself on the next reading. Some of your "result" may be this drift. Check the metric's history before you claim the full change.
- Ceiling effects. Moving from 12% to 20% is far easier than moving from 80% to 88%. Set smaller point changes as the baseline gets close to the top.
- Changing the method between waves. A new questionnaire, a different panel or a revised sample definition breaks the comparison. Keep both the same, as the example objective requires.
- Targets that reward the wrong behavior. If the target is a placement count, the team will chase placements. Put the target on the level the organization cares about, and keep output counts as supporting indicators.
- A deadline set by the campaign calendar alone. The data may not be ready on that day. Fix the date and the data source together.
Putting it into the objective record
Targets and deadlines are fields in the objective record, alongside the audience, metric and baseline. Adding a commit level, a stretch level and milestones makes the plan checkable:
objective:
audience: IT managers in the target region
level: outcome
metric: Unaided awareness of the product
baseline: 0.12
target:
commit: 0.20
stretch: 0.24
deadline: 2027-09-30
next_measurement: 2027-10-05
data_source: Quarterly brand survey, same questionnaire and sampling each wave, n = 400 per wave
milestones:
- date: 2027-05-31
expected: 0.15
- date: 2027-07-31
expected: 0.17
owner: Head of CommunicationsCheck that each milestone sits between the baseline and the commit level, and that the gap between consecutive milestones is larger than the measurement noise. With 400 respondents per wave, a milestone only 2 points above the previous one cannot be confirmed. In that case, drop the milestone or report it as a trend rather than a pass or fail.
Exercise
Your baseline for message recall among small-business owners is 30%, from a survey of 300 people. A colleague proposes a target of 33% in six months, measured with another survey of 300 people. Using the idea of measurement noise, explain whether this target is a good one. Give one change that would make it better.
Show answer
The target is weak because the planned change of 3 points is smaller than the noise. For a baseline of 30% and a wave of 300 people, the 95% margin of error for the difference between two waves is roughly 1.96 × sqrt(0.30×0.70/300 + 0.33×0.67/300), which is about 7 points. A real 3-point gain could easily show up as a loss or as a 10-point gain. Better options include raising the target to a change larger than the noise, increasing the sample size per wave (about 1,500 respondents would bring the margin down to around 3 points), or choosing a less noisy metric. Also check that six months is long enough, given the lag between activity and a change in recall.
Exercise
A campaign launches on 1 March. The brand survey runs in the last week of every quarter (end of March, June, September and December). The board decides on next year's budget on 15 October. Choose a deadline for an awareness outcome and justify it with the three deadline conditions.
Show answer
Choose the end-of-September survey wave, with the results reported before 15 October. This follows the lag, because it gives about six months for awareness to change, which is longer than the March and June waves would allow. It matches a measurement wave, because the data exists on the deadline. It fits the business calendar, because the board gets the result before the budget decision. You can use the June wave as an interim milestone.