Sub topic 16
Keeping the Spec Current as the Feature Changes
Assume you already know how to structure a feature spec, write acceptance criteria, and get a feature approved for development. This chapter focuses on what happens after sign-off, when implementation reveals new constraints or the team changes the design.
A signed-off spec is a baseline, not a permanent promise. The team should change it when the feature changes. Otherwise, the document becomes misleading and designers, engineers, artists, and QA may work from different rules.
Treat the spec as the source of truth
Keep the current rules, scope, and acceptance criteria in one clearly identified document. Do not leave important corrections only in chat messages, meeting notes, or task comments.
Add basic tracking information near the top:
- Status: Draft, In Review, Approved, In Development, or Shipped
- Owner: the person responsible for keeping the spec accurate
- Version: a simple number such as 1.2
- Last updated date
- Reviewers and approval status
- Links to related tasks, prototypes, and tuning data
Use version numbers to show the size of a change. A minor version, such as 1.1 to 1.2, can describe a clarification or small value change. A major version, such as 1.0 to 2.0, should indicate a change to the feature's behavior, scope, or player experience.
Record the reason and impact
Every meaningful change should answer four questions:
- What changed?
- Why did it change?
- What parts of the project are affected?
- Who reviewed or approved the change?
For example, an engineer may discover that an air dash cannot work reliably during a network disconnect. The proposed change might remove air dashes from the first release. That affects the rules, input prompts, tutorial text, animation list, and acceptance tests.
Do not silently edit a rule and leave the old acceptance criterion in place. Update both sections, then check related content.
| Change | Likely impact | Required follow-up |
|---|---|---|
| Remove air dash | Controls, animation, tutorial, QA tests | Update scope, UI, and scenarios |
| Change dash duration | Gameplay feel, tuning data, telemetry | Test the new value and update tuning |
| Clarify wall collision | Engineering behavior, QA coverage | Add an explicit edge-case scenario |
Use a change workflow
A practical workflow is:
- Propose the change in the spec or a linked change request.
- Describe the reason and affected disciplines.
- Ask the relevant reviewers to assess it.
- Update the rules, edge cases, acceptance criteria, and content needs.
- Increment the version and record the date.
- Notify the team and link the updated document from active tasks.
- Ask QA to update its test plan before the next test pass.
The owner does not need every discipline to approve every wording change. A change to dash speed may need design, engineering, and QA review. A change to button labels may also need UI and localization review.
Prevent stale copies
Mark exported documents as read-only or include a prominent link to the current version. In task descriptions, link to the specific section rather than copying rules into several places. If a meeting produces a decision, update the spec during the same work session or assign someone to do it.
Exercise
Exercise
During development, the team changes a dash from ground-and-air movement to ground-only movement. Which parts of the spec should you review?
Show answer
Review scope, mechanics and state rules, controls and UI flow, animation and tutorial requirements, acceptance criteria, tuning data, dependencies, and the change log. Ask engineering, design, QA, and any affected content owners to review the change.