Sub topic 9
When There Is No Number to Report
This chapter assumes you know the action, result and method structure and can pick a metric type. It covers what to do when your work has no figure you can honestly report.
Why a missing number is not a missing result
A number is one way to show a result. It is not the result itself. Some work is hard to count: writing documentation, mentoring, fixing a process, or supporting a system where nobody tracked data. In these cases, keep the structure of the bullet and replace the figure with other concrete evidence.
Do not invent a number to fill the gap. A made-up figure fails the first time an interviewer asks how you measured it.
Four substitutes for a figure
When a metric is missing, look for one of these instead.
- Who used the work. Name the group that relied on it, such as new hires, the finance team, or customers on the phone.
- What it replaced. State the older, slower or messier approach that your work took the place of.
- Scope. Describe the size of what you handled in words, such as "all regional offices" or "every release for two years".
- A durable outcome. Say what kept happening because of your work, such as a process the team still uses.
Here is a bullet with no figure that still reports a result:
No hard metric: Wrote the team's incident runbook, which new on-call engineers used for their first rotations and which replaced ad hoc advice in chat.It names the action (wrote the runbook), the users (new on-call engineers), and the thing it replaced (ad hoc advice in chat). A reader can picture the change without a single digit.
flowchart TDThe decision path below shows how to choose.
Try an estimate first
Before you give up on a number, check whether an honest estimate is possible. Using "about" marks a figure as approximate and still gives the reader a before and after.
Honest estimate: Cut weekly reporting time from about 4 hours to about 30 minutes by automating the spreadsheet export.Estimate only from something you actually remember or can reconstruct, such as how long a task took each week. If you cannot defend the range when asked, drop it and use one of the four substitutes.
Rewriting a weak bullet step by step
Start with a duty statement:
Responsible for training new staff.It says nothing about outcome. Ask three questions. Who did you train? What could they do afterward? What did the training replace?
Built a two-day onboarding workshop for new support staff, which replaced shadowing on the floor and which every new hire at the site attended.The bullet has an action verb, a method, and evidence of reach. It has no figure, and it does not pretend to have one.
Common mistakes
- Vague praise. "Greatly improved morale" has no evidence. Replace it with what people did differently.
- Adjectives instead of facts. Words like "successful" or "significant" tell the reader nothing. Name the users, the replaced method or the scope.
- A fake number. A precise figure you cannot source is worse than no figure.
- Dropping the verb. A missing number does not excuse a duty-style opening like "Responsible for".
Exercise
Rewrite this bullet without inventing a number: "Helped with the company wiki." You know you wrote the setup guide, and that the sales team used it to replace a shared document nobody could search.
Show answer
Example answer: "Wrote the wiki setup guide, which the sales team used to move their notes out of an unsearchable shared document." It starts with a verb, names the users (sales team), and names what it replaced (the shared document), with no invented figure.