Sub topic 6
Giving a Number Meaning with a Baseline
This chapter assumes you know the action, result and method structure for a bullet and the main metric types (money, time, volume, rate, scale). Here you will learn to attach a baseline to a number so a reader can judge it.
Why a bare number is not enough
A number on its own is hard to judge. "Processed 200 invoices a week" could be impressive or ordinary. The reader does not know where you started, what was normal, or how large the team was.
A baseline is the reference point that gives a number its size. It answers one question: compared with what?
Four kinds of baseline
| Baseline | What it compares against | Example phrase |
|---|---|---|
| Before and after | Your own starting value | from 3.1s to 2.0s |
| Target or goal | What was expected | exceeding the 90% target |
| Peer or average | Others in the same role or period | versus a team average of 25 |
| Prior period | The same measure earlier | over the previous year |
Pick the one that makes the result clearest and is easiest to defend in an interview.
Before and after
This is the most common baseline and usually the strongest. State both values, then the change.
Weak: Improved sales by a lot.
Better: Increased monthly sales from $120K to $150K (25%) over two quarters by reworking the outreach email sequence.The better version gives a start value, an end value, a percentage and a time frame. A reader can check the arithmetic: $150K minus $120K is $30K, and $30K divided by $120K is 25%.
The same pattern works for time and rate metrics:
Reduced page load time by 35% (from 3.1s to 2.0s) by compressing images and enabling caching.Here 1.1s divided by 3.1s is about 35%.
Percentages need an anchor
A percentage hides its base. "Grew traffic 300%" could mean 100 visits became 400, or 100,000 became 400,000. Give the raw figures when they help, or at least one of them.
A useful habit is to write the percentage and the raw values together, as in the examples above. Then the percentage shows direction and the raw values show size.
Check the direction
For some measures, lower is better, such as load time, error rate, cost or churn. For others, higher is better. Use a verb that matches. "Reduced load time by 35%" is clear. "Improved load time by 35%" leaves the reader unsure whether it got faster or slower.
Comparing the time frame
A baseline also needs a period. "Increased sales 25%" means little without "over two quarters." A 25% rise in a week and a 25% rise in a year are different achievements. Keep the period the same on both sides: do not compare one slow month with one peak month.
A short worked example
Start with a draft:
Draft: Managed the support queue and got faster at replying.Ask three questions:
- What was the starting value? Average first reply took about 6 hours.
- What was the end value? It dropped to under 2 hours.
- Over what period, and at what volume? Within three months, with about 40 tickets a day.
Rewrite it:
Final: Resolved 40+ customer support tickets per day, keeping average first-response time under 2 hours (down from about 6) within three months.The bullet now has a volume, an end value, a baseline and a period. The word "about" marks the starting figure as an estimate.
flowchart TDDo not add a diagram here. The table above already covers the choices.
Common errors
- Giving only a percentage with no raw values.
- Using a baseline you cannot source or reconstruct if asked.
- Comparing unlike periods, such as a holiday month against a quiet month.
- Choosing a flattering baseline that hides a weak result, such as comparing against your worst week.
- Using "improved" for a measure where the direction is unclear.
Exercise
Rewrite this bullet with a baseline: "Cut weekly reporting time by automating the spreadsheet export." Assume the report took about 4 hours and now takes about 30 minutes.
Show answer
Cut weekly reporting time from about 4 hours to about 30 minutes by automating the spreadsheet export. The before and after values are the baseline, and "about" marks them as estimates.
Exercise
A bullet says "Grew newsletter signups 200%." Name two problems and suggest a fix.
Show answer
The percentage hides the base (200% of 50 signups is very different from 200% of 5,000), and it has no time frame. Fix it by adding raw values and a period, for example: "Grew newsletter signups from 500 to 1,500 per month (200%) in six months by adding an inline signup form to blog posts."