Sub topic 5
Where to Find Your Numbers
This chapter assumes you know the action, result and method structure for a bullet and the main metric types: money, time, volume, rate and scale. It also assumes you have a rough list of your past roles and responsibilities. The question here is practical. You know a bullet needs a number, but you can't remember one. This chapter shows where numbers already exist, how to rebuild them when they don't, and how to record them so you don't lose them again.
Why the numbers are usually findable
Most people believe they have no numbers because they never tracked any. In practice, almost all work leaves traces. Systems log activity, managers ask for reports, customers send messages, and calendars record time. Your job is to dig up those traces and turn them into figures you can defend.
Treat the search as detective work with three possible outcomes:
- Found: a record states the number directly, such as a dashboard or a report.
- Reconstructed: no record states the number, but you can calculate it from records that exist, such as counting tickets in a folder.
- Estimated: no record exists, so you reason from what you remember and mark the figure as approximate.
Always try them in that order. A found number is the strongest. An estimate is the weakest and must be labeled honestly (the next chapter covers that).
Sources inside your own work
Start with material you already control. These sources are quick to check and need no one's permission.
| Source | What it can give you | Metric type |
|---|---|---|
| Sent email and chat history | Counts of messages, client names, launch dates, praise from others | Volume, scale |
| Calendar | Hours spent on recurring tasks, number of meetings or events run | Time, volume |
| Files and folders | Number of documents, reports, or designs you produced | Volume |
| Ticket or task tracker | Items closed, cycle times, backlog size before and after | Volume, time |
| Performance reviews | Goals, ratings, and numbers your manager already wrote down | Any |
| Old resumes and project notes | Figures you recorded when the work was fresh | Any |
Performance reviews deserve special attention. Managers often write specific figures in them, such as "closed 120% of quota" or "cut turnaround from five days to three." Those figures were written by someone else at the time, which makes them credible.
Sources inside company systems
If you still have access to the systems, look for dashboards and reports. Common examples by function:
- Sales and marketing: a CRM (customer relationship management system) for deals closed, revenue, and pipeline size. Analytics tools for traffic, sign-ups, and conversion rate. Email platforms for open and click rates.
- Customer support: a help desk system for tickets handled, first-response time, resolution time, and satisfaction scores.
- Engineering and IT: a version-control history for releases shipped, a monitoring tool for uptime and page load time, and an issue tracker for bugs closed.
- Operations and finance: purchase records for costs, budget spreadsheets for spending against plan, and inventory or shipping logs for throughput.
- Teaching and training: class rosters for the number of students, and test or survey results for scores.
- Retail and hospitality: point-of-sale reports for sales per shift, and schedules for the number of staff supervised.
Before you copy any figure out of a company system, check the rules. Some numbers, such as exact revenue or customer counts, are confidential. A safe habit is to use percentages, ranges, or rounded figures instead of exact internal data. "Grew regional sales by 18%" reveals far less than the dollar amount behind it, and it is just as useful to a reader.
Sources outside your own records
When your own records run out, other people may hold the numbers.
- Your former manager or teammates. Ask a direct question: "Do you remember roughly how many accounts I managed in 2023?" Most people are glad to help.
- Customers, clients, or students. Thank-you notes and reviews often include figures or specifics.
- Public records. Published reports, press releases, app store pages, or a company's website can confirm scale, such as the number of locations or users.
- HR or your own pay records. These can confirm headcount you supervised or dates of promotions, though not all companies share them.
When you ask someone else, ask for facts, not for permission to claim credit. You are verifying a figure, not asking them to approve your resume.
Reconstructing a number from parts
When no record states the figure, you can often build it. Reconstruction means calculating a number from smaller facts you do know. Three techniques cover most cases.
Count a sample and scale it
Suppose you answered customer emails but have no report. You remember that on a typical day you handled about 25 emails, and you worked about 220 days a year.
emails_per_day = 25
work_days_per_year = 220
emails_per_year = emails_per_day * work_days_per_year
print(emails_per_year) # 5500You can now write "answered about 5,500 customer emails a year." The word "about" is correct here because the daily figure is an average from memory.
Compare a before and an after
Time savings are rarely logged, but you can usually compare two processes. If a weekly report took four hours by hand and 30 minutes after you automated it, the saving is the difference.
hours_before = 4.0
hours_after = 0.5
hours_saved_per_week = hours_before - hours_after
percent_reduction = hours_saved_per_week / hours_before * 100
print(hours_saved_per_week) # 3.5
print(round(percent_reduction)) # 88That gives you "cut weekly reporting time from about 4 hours to about 30 minutes," or an 88% reduction. Pick whichever form reads more clearly. Often the two raw values are more convincing than the percentage, because the reader can see the starting point.
Multiply a rate by a duration
If you ran a weekly workshop with about 12 attendees for 40 weeks, you reached about 480 attendee visits. Be careful here. That is 480 visits, not necessarily 480 different people, because the same person may have come more than once. Name the unit you counted.
Check the number before you use it
A figure you found or built is not ready until it passes four quick checks.
- Source: can you name where it came from, even if only to yourself?
- Time frame: does it cover a defined period, such as a quarter, a year, or a project?
- Unit: is it clear what you counted, such as tickets, customers, or dollars?
- Reasonableness: does it fit the size of the team and the length of the role? A part-time intern did not handle a million tickets.
A common error is mixing time frames, such as quoting a monthly figure next to a yearly one in the same bullet. Another is quoting a team total as if it were yours, which the attribution chapter covers in detail.
Start a record now
The best fix for missing numbers is to stop losing them. Keep a simple running file, sometimes called a "brag file" or achievement log, and add to it monthly. Each entry needs only a date, what you did, the number, and where the number came from. A plain table is enough.
| Date | What I did | Number | Source |
|---|---|---|---|
| 2026-03 | Automated weekly sales export | 4 hours down to 30 minutes | My time estimate, confirmed by manager |
| 2026-06 | Onboarded new hires | 6 people in 3 months | Team calendar |
| 2026-09 | Reworked outreach emails | Reply rate 4% to 7% | Email platform report |
Review the file before performance reviews and before you update your resume. Five minutes a month saves hours of guessing later.
Putting it together
Take a duty statement: "Handled customer support tickets." You check the help desk system and find a monthly report. It shows 40 to 45 tickets closed per day and a first-response time under 2 hours. You write: "Resolved 40+ customer support tickets per day, keeping average first-response time under 2 hours." The number was found, the unit is clear, and the time frame is stated by the word "per day."
Now take a case with no report: "Wrote documentation for the product." Your folder holds 18 articles, and a teammate says the help center received roughly 300 views a week on them. You could write: "Wrote 18 help-center articles, which drew about 300 views a week." One number was counted, the other was supplied by a colleague and marked as approximate.
Exercise
You supervised cashiers at a store but have no reports. You remember scheduling 8 cashiers per shift, about 5 shifts per week, and you held the role for about 50 weeks. You want to state how many cashier shifts you scheduled. Calculate it, state which of the three outcomes (found, reconstructed, estimated) the figure is, and write one phrase for the resume.
Show answer
The calculation is 8 cashiers x 5 shifts x 50 weeks = 2,000 cashier shifts. Because you built it from remembered parts and not from a record, it is reconstructed, and since the inputs come from memory it should carry "about". A fitting phrase is "Scheduled about 8 cashiers per shift across roughly 250 shifts, about 2,000 cashier shifts in total." Note the unit: this counts shifts worked, not different people.
Exercise
Name three places you could look for a number to support the bullet "Managed the team's social media accounts," and say which metric type each would give.
Show answer
Sample answers: the analytics tool for each platform gives follower counts (scale) and engagement or click rates (rate); the scheduling tool or your sent posts give the number of posts published (volume); a calendar or time log gives hours spent per week (time). Any three sources with a matching metric type are correct.