Sub topic 4
Choosing the Right Kind of Number
This chapter assumes you can already write a bullet in the action, result and method structure and that you have a rough list of your past roles and responsibilities. Here the focus is the result part: which kind of number to put there, and why.
Why the type of number matters
A number in a bullet is evidence. Different numbers prove different things. "Handled 200 tickets" proves you were busy. "Cut average resolution time from 3 days to 1" proves you made something better. A reader skimming a resume for six seconds takes in one figure per bullet, so the figure you choose decides what impression they keep.
Most results fit one of five types:
- Money: revenue, savings, budget, cost avoided.
- Time: hours saved, turnaround, speed, deadline performance.
- Volume: how many items, people or events you handled.
- Rate: a percentage or ratio, such as conversion, error rate or retention.
- Scale: the size of the setting you worked in, such as users, locations, team size or data size.
The five types in detail
Money
Money is the most universal measure, because every employer cares about it. Use it when your work touched revenue, cost or budget.
Negotiated a new freight contract that lowered shipping costs from $48K to $39K per quarter (19%).Money figures are also the easiest to overstate. Revenue is not profit, and "managed a $2M budget" describes responsibility, not savings. State which one you mean. If you only influenced a sale, say "contributed to" or name your part, a topic covered in the attribution chapter.
Time
Time works for almost any role, including ones with no sales or revenue link. It comes in three forms:
- Time saved: hours or days removed from a process.
- Speed: how quickly something was done, such as response or delivery time.
- Reliability: how often deadlines were met.
Shortened month-end close from 9 working days to 6 by replacing manual reconciliations with a shared checklist.When you report time saved, say whose time it is. Saving yourself four hours is smaller than saving ten teammates four hours each. Multiply only if the multiplication is honest: "Saved each of 10 analysts about 4 hours a week" is clearer than "Saved 40 hours a week", and the two say the same thing.
Volume
Volume counts how much you handled. It is a good fit for operational and support roles. Its weakness is that on its own it only measures effort. Pair it with a time window so the reader can judge the pace.
Processed 120+ vendor invoices per week with a 99% first-pass accuracy rate.Here the second figure, a rate, is what turns busy work into good work. Volume is strongest as supporting evidence for a quality or speed result.
Rate
A rate is a percentage or ratio. Conversion rate, error rate, retention, satisfaction scores and on-time delivery are all rates. Rates let a reader compare across different sizes of company, which makes them the most portable number.
Raised email open rate from 18% to 27% by testing subject lines in weekly A/B experiments.Rates have two common traps:
- A percentage without a base can mislead. "Grew signups 300%" could mean 1 to 4.
- A percentage change and a change in percentage points are different. Going from 18% to 27% is a 9-point rise and a 50% relative increase. Pick one and label it clearly, or show both endpoints as above.
Scale
Scale describes the size of what you worked on or with: users, stores, servers, records, team size, budget. It is not a result by itself, but it tells the reader how hard the result was.
Migrated a customer database of 2.4M records to a new platform with no unplanned downtime.Use scale as context for another type. A 10% improvement across 2.4 million records and a 10% improvement across 240 records are very different claims.
Choosing a type for a given accomplishment
Start from what the employer wants from the role, then find the type that best shows you delivered it. The table gives a starting point.
| If the role is mainly about | Lead with | Support with |
|---|---|---|
| Sales or growth | Money, rate | Volume, scale |
| Operations or support | Time, rate | Volume |
| Engineering or IT | Time, rate | Scale |
| Finance or procurement | Money | Time, rate |
| Management | Rate, money | Scale (team size) |
| Teaching or training | Rate | Volume, scale |
The table is a default, not a rule. A support agent who cut refund costs has a money story, and a salesperson who shortened the sales cycle has a time story.
Combining two numbers
Strong bullets often carry two figures that play different roles: one is the result and the other is context. Keep the result first and make sure the second one does not compete with it.
Result only: Reduced onboarding time by 40%.
Result and scale: Reduced onboarding time by 40% (from 10 days to 6) for 85 new hires per year.
Overloaded: Reduced onboarding time by 40%, saving $18K, raising satisfaction 12%, across 85 hires in 3 offices.The third line has four figures and the reader remembers none of them. A reasonable limit is one result and one piece of context per bullet. If you have three strong results from the same project, write two bullets.
Common errors when choosing a number
- Choosing the biggest number rather than the most relevant one. A large dollar figure from an unrelated task distracts from the skill the job asks for.
- Reporting an input as a result. "Sent 500 emails" is volume of effort. "Booked 22 meetings from 500 emails" reports what happened.
- Mixing units without saying so, such as "saved 20 hours" with no period. Add "per week", "per release" or "in total".
- Using a vanity number that no one could act on, such as page views for a role judged on sales.
- Stacking several percentages that cannot be added together.
Worked example
Start with a weak bullet:
Managed the company's social media accounts and posted regularly.This has no number. List what you know: three platforms, posts five days a week, followers grew, one campaign drove sign-ups. Now choose the type that matches a marketing role: rate and volume.
Grew Instagram followers from 4,200 to 6,100 (45%) in 8 months by posting five times a week and running two giveaway campaigns.The result is a rate backed by a baseline. The volume (five posts a week) is folded into the method. If you were applying for a role focused on lead generation instead, you would lead with the campaign's sign-ups and drop the follower count.
Exercise
A warehouse clerk writes: "Packed 300 orders a day." The target job is a shift supervisor role that values accuracy and speed. Name the type of number in the bullet, say why it is weak, and suggest a stronger version that uses a rate or time figure. Assume the clerk can say that errors fell from 4% to 1% over six months.
Show answer
The number is volume, and on its own it shows effort, not quality or improvement. A stronger version leads with a rate and keeps volume as context: "Packed 300 orders a day while cutting packing errors from 4% to 1% over six months by double-checking labels at the scanning station." The method here is an assumption. Replace it with what the clerk actually did.
Exercise
A bullet reads: "Increased customer satisfaction by 20%." Give two questions you would ask to make the figure clear, and say which number type each answer would add.
Show answer
First, "From what to what, and on which measure?" adds the endpoints of the rate, which shows whether 20% is a relative change or a change in percentage points. Second, "How many customers or responses, over what period?" adds volume or scale, which shows how reliable the figure is.