Tracking open questions and decisions
This chapter assumes you have read the earlier chapters on problem statements, requirements, and scope. You should know what a PRD section looks like and why risks and assumptions are recorded. Here we cover the section that comes next: open questions, and the decisions that close them.
Why open questions get their own section
Every PRD is written before the work is finished. Some facts are unknown when you write it. A good PRD says so openly instead of guessing or leaving the gap unmentioned.
An open question is something the team needs to know before it can finish, build, or launch part of the product. It differs from a risk and from an assumption:
| Item | What it says | Example |
|---|---|---|
| Assumption | We believe this is true and are proceeding on that belief. | Admins already have a stable list of members. |
| Risk | Something might go wrong, with some likelihood and impact. | The export may time out for very large teams. |
| Open question | We do not know the answer, and someone must find it. | Does finance need the export to include former members? |
The three are related. An open question often starts as an assumption you are not confident in. If nobody resolves it, it can become a risk. Keep them in separate lists so each has its own follow-up path.
An unlisted question does not go away. It surfaces later as a late design change, an engineering argument, or a launch delay. Listing it early gives it an owner and a date.
What a useful open question contains
A bare line such as "What about permissions?" cannot be acted on. Each entry should answer five things:
- The question, written so it has a definite answer.
- Why it matters, meaning which requirement, estimate, or launch step depends on it.
- The owner, one named person responsible for getting the answer. This person need not know the answer. They make sure it is found.
- The due date, or the milestone it must be answered by.
- The status, such as Open, Answered, or Dropped.
Compare a weak and a stronger entry:
**Weak:** Should export include more data?
**Stronger:** Should the member export include former members?
Matters for: FR-1 and FR-2; changes the query and the file size estimate.
Owner: Priya (PM). Needed by: design review, 12 Dec.
Status: OpenThe stronger version can be answered with yes or no. It points to the requirements it affects. Someone reading it knows who to ask and how urgent it is.
A table for the section
A table works well because reviewers can scan it. Place it in section 8 of the PRD skeleton.
## 8. Open questions
| # | Question | Affects | Owner | Needed by | Status |
|---|---|---|---|---|---|
| Q1 | Should the export include former members? | FR-1, FR-2 | Priya | 12 Dec | Open |
| Q2 | Does finance need a fixed column order? | FR-2 | Marcus | 12 Dec | Open |
| Q3 | Is a 10,000-member team limit acceptable? | NFR-2 | Dana | 19 Dec | Answered |Keep the question numbers stable. If Q2 is dropped, do not renumber Q3. Other documents and chat threads may refer to "Q3", and renumbering breaks those references.
Turning answers into decisions
An answer sitting in a chat thread is easy to lose. When a question is resolved, record what was decided, who decided it, when, and why. This record is a decision log.
A decision log has three uses:
- New team members can see why the product works the way it does.
- Stakeholders cannot quietly reopen a settled issue without seeing the earlier reasoning.
- When circumstances change, the team can tell which decisions to revisit, because the reasons are written down.
A log entry needs only a few fields:
## Decision log
| ID | Decision | Rationale | Decided by | Date | Resolves |
|---|---|---|---|---|---|
| D1 | The export excludes former members in this release. | Finance only reconciles active seats; keeps the file small. | Priya, with Marcus | 10 Dec | Q1 |
| D2 | Columns are fixed: name, email, role. | Matches FR-2; configurable columns moved to Could (FR-3). | Priya | 11 Dec | Q2 |The "Resolves" column links each decision back to the question that prompted it. After you log a decision, update the question's status to Answered and update any requirement that changed. If D1 changes the scope, edit FR-1 so the PRD does not contradict its own log.
The life of a question
A question moves through a few states. Naming them keeps the list honest.
Treat "Dropped" with care. A question is dropped when a scope change makes it irrelevant, not because it is uncomfortable. Write one line explaining why it was dropped, so a reader does not wonder whether it was forgotten.
Who decides
Many open questions stall because nobody knows who can settle them. Before the review, agree on a decision rule for each question. Common ones are:
- The PM decides for questions about priorities, scope, and user needs, after consulting others.
- Engineering decides for technical feasibility and approach.
- Design decides for interaction details within the agreed requirements.
- An escalation owner decides when two groups disagree. This is usually a product lead or director.
Write the decider next to the question when it is not obvious. The owner of a question and the decider can be different people. The owner chases the answer. The decider makes the call.
Common errors
Vague questions. "Think about scale" is a reminder, not a question. Rewrite it as something with a checkable answer, such as "Must the export handle teams over 10,000 members?"
Questions with no owner. A list owned by "the team" has no owner. Assign one name per question.
Questions with no date. Without a deadline, answers arrive after the work they should have shaped. Tie each date to the milestone that needs it, such as a design review or estimate session.
Hiding decisions in comments. If the decision exists only in a document comment or chat message, it will be lost. Copy it to the log, with a link to the discussion if useful.
Never closing the list. A PRD that ships with a dozen "Open" items looks unfinished. Before development starts, every question blocking a Must requirement should be answered or consciously deferred.
Using the list as a parking lot for disagreements. If two stakeholders disagree on a requirement, "TBD" does not resolve it. State the options, the trade-offs, and the person who will decide.
Handling questions that cannot be answered yet
Some questions cannot be answered before building starts. For example, you may not know real-world export times until a prototype exists. Do not leave these as plain open items. Convert them into a plan:
- State the experiment or spike that will produce the answer, such as a one-week prototype.
- State the default you will use if the answer arrives late, such as a 10,000-member limit.
- State the trigger that tells you to revisit it, such as a prototype taking longer than 30 seconds.
This turns an unknown into a managed uncertainty. Work can proceed on the default, and the team knows what would change the plan.
Using the section in review
Open questions shape how you run the PRD review covered later. Send the list ahead of time and ask reviewers to claim questions in their area. In the review meeting, spend time on the questions with the earliest due dates and the largest effect on requirements. Do not spend it on items that only affect details after launch.
After the meeting, update the statuses the same day. A list that is current right after a review builds trust. A stale one teaches readers to ignore the section.
Exercise
A PRD lists the open question "Should we support more file formats?" with no owner or date. The team later decides to support only CSV in this release. Rewrite the question so it can be acted on, then write the decision log entry that closes it. Use the fields from this chapter.
Show answer
Rewritten question: "Must the member export support formats other than CSV in this release?" Matters for: FR-1 and the engineering estimate. Owner: the PM (one named person). Needed by: the estimate session. Status: Open. Decision log entry: "D3: The export supports CSV only in this release. Rationale: finance's workflow uses CSV; extra formats add effort without a stated need. Decided by: the PM with engineering. Date: the day of the decision. Resolves: Q4." Then set Q4 to Answered and make sure FR-1 states CSV only.
Exercise
Two stakeholders disagree about whether the export should include former members. Why is writing "TBD" in the open questions table a poor response, and what should you write instead?
Show answer
"TBD" hides the disagreement and gives nobody the job of settling it. Write the question as a yes or no, list the options with their trade-offs (for example, file size and what finance reconciles), name the decider, and set a date tied to a milestone such as the design review. Once the decider chooses, log the decision with its rationale and update the affected requirements.