Sub topic 9
Choosing the Project Y
Assume you know basic Lean Six Sigma terms such as DMAIC, defect, and process. You should also be familiar with a simple process map and basic proportions and means.
A project Y is the main outcome measure that tells you whether a Lean Six Sigma project improves what matters to the customer. In the CTQ tree, the Y comes after the customer need, quality drivers, and measurable requirements.
The project Y is usually written as:
- A measurable outcome
- Linked to one or more CTQ requirements
- Defined over a stated population and time period
- Measured consistently before and after improvement work
For example, a customer might say, “My order should arrive quickly and correctly.” A CTQ tree could produce two measurable requirements:
| Quality driver | Requirement | Candidate project Y |
|---|---|---|
| Delivery speed | Delivered within 3 calendar days | Percentage delivered within 3 days |
| Order accuracy | Contains the right items and quantities | Percentage with no item or quantity error |
Select the Y from the CTQ tree
Start at the customer need and trace downward. Choose the metric that best represents the project’s primary outcome.
Do not select a solution as the Y. “Install a faster shipping system” is an action, not an outcome. Do not select an internal activity such as “employees trained” unless training completion itself is the customer requirement. Training may be an X, or input, that affects the Y.
A project can have supporting measures, but it should have a clear primary Y. For an order-delivery project, the primary Y might be on-time delivery. Supporting measures could include shipping cost, damage rate, and customer complaints. These measures help detect side effects, but they do not replace the primary Y.
Use an operational definition
An operational definition states exactly how people will measure the Y. Include:
- The unit being measured, such as an order.
- The population and time period.
- The start and end points.
- The acceptance rule.
- Inclusion and exclusion rules.
- The data source.
- The calculation.
For example:
“On-time delivery is the percentage of completed domestic orders placed during March 2026 that have a carrier delivery scan no later than three calendar days after the order timestamp. Cancelled orders are excluded. The order management system supplies the order timestamp, and the carrier system supplies the delivery scan.”
This definition prevents two analysts from using different clocks, order populations, or interpretations of “delivered.”
Calculate the baseline
The baseline is the current performance before changes are made. For a proportion metric:
baseline = number of conforming units / total eligible units
If 98 of 100 eligible orders arrive within three days, the baseline is 98%. The defect rate is 2%. If each order has one opportunity for late delivery, the DPMO is:
defect rate × 1,000,000 = 0.02 × 1,000,000 = 20,000 DPMO
A small sample can make the baseline unstable. Record the sample size and measurement period with the percentage. A baseline of 98% from 10 orders does not carry the same evidence as 98% from 10,000 orders.
orders = [
{"eligible": True, "within_spec": True},
{"eligible": True, "within_spec": False},
{"eligible": True, "within_spec": True},
{"eligible": False, "within_spec": False},
]
eligible_orders = [order for order in orders if order["eligible"]]
conforming = sum(order["within_spec"] for order in eligible_orders)
baseline = conforming / len(eligible_orders)
defect_rate = 1 - baseline
dpmo = defect_rate * 1_000_000
print(f"Baseline: {baseline:.1%}")
print(f"Defect rate: {defect_rate:.1%}")
print(f"DPMO: {dpmo:,.0f}")Set a target without losing the definition
A target changes the desired value, not the measurement rules. For example, a charter might state:
- Y: percentage of eligible orders delivered within three calendar days
- Baseline: 98% over March 2026
- Target: at least 99.5% by September 30, 2026
The target should be challenging but credible. Use historical performance, customer expectations, process capability, and project time limits. Do not choose a target only because it is a round number.
Validate the project Y
Before placing the Y in the project charter, test it with customers and data.
- Ask customers whether the metric reflects the need they described.
- Check that the data exists and has acceptable quality.
- Sample records and compare the calculated result with the actual process.
- Check whether the measure encourages harmful trade-offs.
- Confirm that the project team can influence the process causing the result.
A CTQ tree is not complete merely because its branches look logical. Customer feedback and real records must support the selected Y.
Common errors
- Choosing an action instead of an outcome.
- Combining speed and accuracy into one unclear score.
- Omitting the population or time window.
- Using a percentage without reporting the denominator.
- Changing the definition after seeing poor results.
- Selecting a measure that the project team cannot affect.
Exercise
A team defines its Y as “reduce customer complaints” but does not state which complaints count, when they occurred, or how many orders were served. What should it do before setting a target?
Show answer
Write an operational definition that identifies the complaint types, order population, measurement period, data source, and calculation. Then establish a baseline with its denominator and sample size.