Sub topic 9
Choosing the project Y
This chapter assumes you can read a CTQ tree, which runs from a need through drivers to requirements. It also assumes you can write a specification and an operational definition. You should know DMAIC vocabulary and basic proportions and means. Here you pick the one metric that the project will try to move, called the project Y.
What the project Y is
In Six Sigma notation, Y = f(X). Y is the outcome you want to improve. The Xs are the process factors that influence it. The project Y is the single measurable outcome the project is accountable for. Everything in Measure, Analyze, Improve, and Control refers back to it.
A CTQ tree usually offers several candidates. Each leaf is a measurable requirement, and each requirement can be measured in more than one way. Choosing the Y means deciding which leaf, and which way of measuring it, the project will commit to.
A good Y has these properties:
- It traces to a need. You can follow a path from the metric up through the requirement and driver to the customer's words.
- It is operationally defined. Two people measuring the same orders get the same number.
- It is measurable now. Data already exists, or you can collect it within days or weeks.
- It responds to the process. If the process improves, the metric moves. If the metric moves, you can say why.
- It is within the team's reach. The team can change the process that produces it.
- It cannot easily be gamed. Improving the number should mean improving what the customer experiences.
From tree to candidates
Take the tree from earlier in the tutorial. The need is "My order should arrive quickly and correctly." It has two drivers, delivery speed and order accuracy. Each driver has a requirement and a candidate metric.
You may be tempted to take both and call them the project Y. Resist that. A project with two Ys has two definitions of success, and they often pull against each other. Rushing orders out the door can hurt accuracy. Choose one primary Y and treat the other as a secondary metric, a number you watch but do not try to improve.
To choose between them, rank the drivers using the evidence you gathered earlier. Complaint counts, customer survey results, and Kano classification all help. If late orders generate most of the complaints and accuracy is already high, delivery speed is the better primary Y.
Next, choose how to measure the driver. A single requirement can usually be measured in two ways.
| Candidate | Type | Example value | Strength | Weakness |
|---|---|---|---|---|
| % of orders delivered within 3 days | Discrete (pass/fail) | 50% | Matches the specification and the defect definition directly | Needs more data to detect a change |
| Mean days from order to delivery | Continuous | 3.5 days | Uses every data point, so it detects change with fewer orders | Averages hide late outliers |
| % of orders shipped within 1 day | Discrete | 80% | Easy to influence | Measures an input (X), not what the customer sees |
The third row is a common trap. "Shipped within 1 day" is a plausible driver of delivery speed, so it is an X. It belongs in the Analyze phase as a possible cause. It is not the project Y, because the customer does not experience it.
Continuous or discrete
Discrete metrics count defects against the specification. They connect directly to DPMO and defect rate, and they are easy to explain. Continuous metrics, such as days elapsed, carry more information per observation. Compare four orders delivered in 2, 4, 2, and 6 days. A pass/fail view says 2 of 4 failed. A continuous view shows one order that missed by a single day and one that missed by three. The following code computes both from the same data.
from datetime import date
from statistics import mean, median
SPEC_DAYS = 3
orders = [
(date(2026, 3, 2), date(2026, 3, 4)),
(date(2026, 3, 2), date(2026, 3, 6)),
(date(2026, 3, 3), date(2026, 3, 5)),
(date(2026, 3, 3), date(2026, 3, 9)),
]
days = [(delivered - ordered).days for ordered, delivered in orders]
late = [d for d in days if d > SPEC_DAYS]
print(f"days per order: {days}")
print(f"mean={mean(days):.1f}, median={median(days):.1f}")
print(f"defect rate={len(late) / len(days):.0%}")
print(f"worst miss={max(days) - SPEC_DAYS} days over spec")Run on this data, it prints a mean of 3.5 days, a median of 3.0 days, a 50% defect rate, and a worst miss of 3 days over spec. The mean and median differ because one late order pulls the mean up.
A practical rule is to prefer the metric that matches how the customer judges the result. A customer who needs the order "within 3 days" experiences a pass or a fail, so the discrete metric fits. If the project later needs more statistical power, you can keep the pass/fail Y and track days elapsed as a secondary metric. You can also switch the Y to the continuous version if the team and sponsor agree and the charter is updated.
Comparing candidates with a scoring matrix
When two or three candidates remain, a weighted scoring matrix makes the trade-offs explicit. It does not make the decision for you. It exposes the criteria on which you and the sponsor disagree.
criteria_weights = {
"traces_to_need": 5,
"data_available": 3,
"responds_to_process": 4,
"within_team_control": 3,
}
# Scores run from 1 (poor) to 5 (strong).
candidates = {
"pct_delivered_within_3_days": {
"traces_to_need": 5, "data_available": 4,
"responds_to_process": 4, "within_team_control": 3,
},
"mean_days_to_deliver": {
"traces_to_need": 4, "data_available": 4,
"responds_to_process": 5, "within_team_control": 3,
},
"pct_shipped_within_1_day": {
"traces_to_need": 2, "data_available": 5,
"responds_to_process": 5, "within_team_control": 5,
},
}
totals = {
name: sum(criteria_weights[c] * s for c, s in scores.items())
for name, scores in candidates.items()
}
for name, total in sorted(totals.items(), key=lambda kv: kv[1], reverse=True):
print(f"{total:3d} {name}")The two delivery-outcome metrics score 63 and 62, and the shipping metric scores 53. The shipping metric loses despite easy data and high control, because it fails the test that matters most: tracing to the need. The two leaders are close, so the choice between them rests on the customer's view, as described above.
The weights are judgments. If your sponsor would change them and the winner flips, that is useful information. Settle that disagreement before the project starts.
The selection flow
Writing the Y statement
Once chosen, state the Y in one sentence that includes its operational definition. Vague statements produce vague baselines later.
> Not allowed here, so shown as a plain example:
Project Y: the percentage of web orders shipped from Warehouse A that are delivered within 3 calendar days of the order timestamp. It is measured weekly from the order system's order and delivery-confirmation timestamps. Orders cancelled by the customer are excluded. A defect is any order delivered after day 3.
Check the statement for each of these:
- Unit of measure. Here it is orders.
- Scope. Here it is web orders from Warehouse A.
- Start and stop events. Here they are the order timestamp and the delivery confirmation.
- Data source. Here it is the order system.
- Frequency. Here it is weekly.
- Exclusions. Here they are cancelled orders.
- Defect definition. Here it is delivery after day 3.
If any item is missing, go back to the operational definition before you baseline the metric.
Secondary and guardrail metrics
A primary Y can improve while something else gets worse. The standard protection is a short list of secondary metrics. For the delivery project, order accuracy is the obvious one. Cost per order is another. Neither is a project goal, but a drop in either is a warning that the gain in delivery speed was bought at someone else's expense.
Keep the list short, usually two or three. Each added metric needs its own operational definition and data collection effort. A long list turns the project into a dashboard exercise.
Pitfalls specific to choosing the Y
- Picking a solution as the Y. "Number of orders processed through the new scanner" is an activity. It does not measure what the customer gets.
- Picking an X as the Y. Shipping time, pick accuracy, and staffing levels are causes to investigate. The customer does not see them.
- Picking a Y outside the team's control. If the carrier controls most of the transit time, the team cannot move a metric that is mostly transit time. Either narrow the scope or choose a Y the team can influence.
- Picking a Y that can be gamed. Cancelling late orders from the data raises the on-time rate without helping any customer. The exclusions in the operational definition guard against this, so write them explicitly.
- Picking an average when the customer feels the tail. A mean of 2.5 days can hide a fraction of orders arriving in 9. If customers complain about the extreme cases, a percentile or a defect rate fits better.
- Picking a Y with no usable data. A metric you cannot measure for weeks stalls the Measure phase. If the ideal Y needs new data collection, plan it, or choose a proxy and record it as one.
What comes next
With the Y chosen and defined, the next step is to measure its current performance, called the baseline, and to set a target. Both depend on the definition you wrote here. If the definition changes later, the baseline is no longer comparable and you must redo it.
Exercise
A team's CTQ tree for a customer support process has the need "I want my problem solved without hassle." One driver is "First-contact resolution," with the requirement "Issue is resolved in the first interaction." The team proposes three candidate metrics: (a) average call handling time in minutes, (b) percentage of tickets resolved with no follow-up contact within 7 days, (c) number of agents trained on the new knowledge base. Which should be the project Y, and what are (a) and (c)?
Show answer
Choose (b). It traces directly to the requirement "resolved in the first interaction," has a clear pass/fail defect definition (a follow-up within 7 days), and reflects what the customer experiences. Metric (a) is a possible secondary or guardrail metric, because pushing handling time down can hurt resolution. Metric (c) is a solution or activity measure, and it can be tracked as an X, but it is not an outcome the customer sees.
Exercise
A project Y is stated as "improve delivery performance." List three things missing from this statement that an operational definition would supply.
Show answer
Any three of the following: the unit of measure (orders, shipments), the scope (which channel or warehouse), the start and stop events (order timestamp, delivery confirmation), the data source, the measurement frequency, the exclusions (for example cancelled orders), and the defect definition (delivery later than 3 calendar days).