Sub topic 10
Picking today's shortlist
This chapter assumes you already have a single inventory of tasks, that you have separated commitments from wishes, and that each task sits in one of four triage buckets: do now, schedule, delegate or shrink, drop or defer. You also need a rough idea of how many focused minutes you have in a day. Here you turn that sorted list into a short list of work for one day.
Why a shortlist is a separate step
Triage tells you what each task is. It does not tell you what to do today. A "schedule" bucket can hold forty items, and all of them are legitimate. If you open that bucket each morning and try to work from it, you are back to the overflowing list you started with.
The shortlist is the bridge between sorting and doing. It is a small, explicit set of tasks that:
- come only from the "do now" and "schedule" buckets,
- are ordered so that the most time-sensitive work comes first,
- fit inside the time you can realistically work.
Everything else stays in the inventory, untouched, until a later review. Leaving it there is a decision, not a failure.
Step 1: Recompute the buckets today
Bucket labels go stale. A task that was "schedule" last week may be due tomorrow, which makes it urgent. Reclassify against today's date before you pick anything.
The rule below is the one used throughout this tutorial. A task is urgent when it is due within two days, and important when you have marked it so. Those two answers give the bucket.
from dataclasses import dataclass
from datetime import date
from typing import Optional
@dataclass
class Task:
name: str
due: Optional[date]
important: bool
minutes: int
def bucket(task: Task, today: date) -> str:
urgent = task.due is not None and (task.due - today).days <= 2
if urgent and task.important:
return "do now"
if task.important:
return "schedule"
if urgent:
return "delegate or shrink"
return "drop or defer"Notice two details about this function:
- A task with no due date is never urgent. It can still be important, so it lands in "schedule".
- An overdue task has a negative number of days until its due date, so
<= 2is true and it counts as urgent. Overdue work is the first thing to look at, not the last.
The two-day threshold is a choice. If a task takes a week of effort, two days of warning is far too late. Section "Effort and lead time" below covers how to adjust for this.
Step 2: Filter to candidates
Only two buckets can produce today's work:
- Do now tasks are urgent and important. They are candidates by default.
- Schedule tasks are important but not yet urgent. They are candidates because, if you never pick them, they will eventually become "do now" tasks under pressure.
The other buckets are excluded on purpose. "Delegate or shrink" tasks are urgent but not important, so your action today is to hand them off or reduce them to a minimal version, which is a small job in itself. "Drop or defer" tasks should not consume today's time at all.
Step 3: Order the candidates
Once you have candidates, you need an order. A simple and defensible ordering is earliest due date first, with undated tasks last. The reasoning is that a due date is the only hard external signal you have. Tasks with no date can usually move a day without harm.
Python sorts False before True, so using t.due is None as the first part of the sort key pushes undated tasks to the end. The second part sorts dated tasks by date. date.max is a placeholder so the key can be compared even when due is None.
Step 4: Fill to capacity, and stop
Capacity is the number of minutes you can really spend on task work today. It is not the length of your workday. Meetings, messages, breaks, interruptions and switching between tasks all take time. Many people find that three to four focused hours is a realistic figure for a full working day, and less on a heavy meeting day.
The shortlist function applies the filter, the ordering and the capacity limit together:
def shortlist(tasks, today, capacity_minutes):
candidates = [t for t in tasks if bucket(t, today) in ("do now", "schedule")]
candidates.sort(key=lambda t: (t.due is None, t.due or date.max))
chosen, used = [], 0
for t in candidates:
if used + t.minutes <= capacity_minutes:
chosen.append(t)
used += t.minutes
return chosenHere is a complete run you can paste below the two functions, assuming the Task class and bucket function above are in the same file.
from datetime import date
today = date(2026, 11, 27)
tasks = [
Task("Send client invoice", date(2026, 11, 28), True, 30),
Task("Prepare quarterly review", date(2026, 12, 4), True, 120),
Task("Reply to vendor survey", date(2026, 11, 28), False, 15),
Task("Reorganise photo library", None, False, 90),
Task("Draft training outline", None, True, 60),
Task("Fix broken report", date(2026, 11, 27), True, 90),
]
for t in shortlist(tasks, today, capacity_minutes=240):
print(t.name, "-", bucket(t, today), "-", t.minutes, "min")Working through it by hand shows why each task lands where it does:
| Task | Due | Important | Bucket | Candidate |
|---|---|---|---|---|
| Fix broken report | today | yes | do now | yes |
| Send client invoice | tomorrow | yes | do now | yes |
| Prepare quarterly review | 7 days out | yes | schedule | yes |
| Draft training outline | none | yes | schedule | yes |
| Reply to vendor survey | tomorrow | no | delegate or shrink | no |
| Reorganise photo library | none | no | drop or defer | no |
The candidates sort to: fix broken report (90), send client invoice (30), prepare quarterly review (120), draft training outline (60). With 240 minutes of capacity, the loop adds 90, then 30, giving 120 used. The quarterly review needs 120 more, and 120 + 120 = 240 fits exactly, so it is added. The training outline would bring the total to 300, so it is skipped. The output is three tasks totalling 240 minutes.
Edge cases in the selection loop
The function is short, but its behaviour has consequences you should know about.
It skips and keeps going
When a task does not fit, the loop does not stop. It moves on and may add a smaller, later task that does fit. This fills the day more fully, but it can quietly leave a large, important task out while a minor one gets in. If the skipped task is a "do now" item, that is a problem.
One fix is to treat "do now" tasks as mandatory. Take all of them first, and only then fill the remaining capacity from the "schedule" tasks. If the "do now" tasks alone exceed capacity, that is a signal, not a bug in the code. It means you must renegotiate something, which is the topic of the renegotiating chapter.
Capacity at zero or very low
If a day has almost no free time, the shortlist may come back empty or with one item. An empty result is honest. It tells you that no task fits, so the useful action is to shrink one task to a first step that does fit, or to move a deadline.
A single task larger than capacity
A 300-minute task never fits a 240-minute day, so the function will never choose it. It will wait until it becomes urgent and then still not be chosen. Large tasks need to be split into pieces that each fit in one day. Choose the next piece as the task, not the whole project.
Estimates are wrong
Your minute estimates will be low more often than high. A common correction is to multiply your first guess by 1.5 for work that is new to you. Another is to leave a buffer: set capacity to about 70 to 80 percent of the time you think you have. Whichever you choose, apply it consistently so you can compare day to day.
Ties and dependencies
Two tasks with the same due date are ordered by whatever order they had in the list, since Python's sort is stable. If one task blocks another, such as needing approval before you can send the final document, put the blocker first by hand. The code does not know about dependencies. Use your judgement here, and see the earlier chapter on effort and blockers.
Effort and lead time
The two-day urgency rule treats all tasks alike, but a task's urgency depends on how long it takes. A 15-minute task due in two days is calm. A 10-hour task due in two days is already in trouble.
A simple adjustment is to compare lead time with effort. For example, you could define urgent as "days until due is at most two, or the work needs more working days than remain". The shape of the rule stays the same, and only the threshold changes. Keep any change small. If the rule becomes complicated, you will stop trusting it and start overriding it.
Doing the shortlist
A shortlist helps only if you can see it and act on it.
- Write the shortlist somewhere visible, such as the top of a notes page or a separate view in your task manager.
- Put the tasks in order, and start with the first one rather than the easiest one.
- When you finish a task, tick it and look at the next one. Do not reopen the full inventory.
- If something urgent arrives, decide whether it replaces a shortlist item. Remove one to make room. Do not just add it on top.
- At the end of the day, move unfinished tasks back to the inventory and let tomorrow's run decide again.
Step 4 is the one people skip. A day that only ever gets added to will overflow, just like the list did.
What a good shortlist looks like
Check the result against these quick tests:
- You can say, from memory, what the first task is.
- The total minutes are at or below your capacity, not above it.
- At least one task is important rather than only urgent.
- Nothing on it is a vague project name. Each item is a concrete next piece of work.
- Fewer than about five items. More than that usually means estimates are too small or tasks are too fine-grained to track.
Common mistakes
- Filling the day to 100 percent. Any interruption breaks the plan. Plan to capacity, not above it.
- Choosing the easiest tasks first. This feels productive and leaves the important work to the end of the day, when energy is lowest.
- Treating the shortlist as the inventory. The shortlist is rebuilt daily. It is not a place to store tasks.
- Rebuilding it several times a day. Pick once in the morning or the evening before, and revisit only when something truly changes.
- Ignoring a "do now" task that does not fit. It needs action: shrink it, ask for help, or move the deadline.
Exercise
Using the rules in this chapter (urgent means due within two days, today is 2026-11-27, capacity is 100 minutes), which tasks are chosen from this list, and in what order? Task A: due 2026-11-29, important, 60 min. Task B: due 2026-12-10, important, 50 min. Task C: no due date, important, 30 min. Task D: due 2026-11-28, not important, 20 min.
Show answer
Task D is "delegate or shrink" and is excluded. Task A is urgent and important, so it is "do now". Tasks B and C are important but not urgent, so they are "schedule". The order is A (due 11-29), B (due 12-10), then C (no date). A uses 60 minutes. B needs 50, and 60 + 50 = 110 exceeds 100, so B is skipped. C needs 30, and 60 + 30 = 90 fits. The shortlist is A then C, totalling 90 minutes.
Exercise
The loop in shortlist() skips tasks that do not fit and keeps going. Describe one situation where this causes a bad result, and one change that prevents it.
Show answer
A large "do now" task that does not fit is skipped, while a small, less important "schedule" task is added in its place, so the most pressing work is silently left out. A fix is to take all "do now" tasks first as mandatory, then fill the remaining capacity from "schedule" tasks. If the "do now" tasks alone exceed capacity, treat that as a signal to renegotiate or shrink work.