Sub topic 11
A short review that keeps the list small
This chapter assumes you have already built an inventory of your tasks, separated commitments from ideas, and sorted tasks into the four buckets (do now, schedule, delegate or shrink, drop or defer). It also assumes you can pick a daily shortlist that fits your capacity. Those steps clear an overflowing list once. A regular review keeps it from overflowing again.
Why one cleanup is not enough
A triage session removes the backlog that exists today. New work arrives every day, though, and the old list also changes underneath you. Deadlines move closer, so a "schedule" task becomes urgent. Other people change their requests. Ideas you parked go stale.
If you never look at the list again, three things happen:
- Tasks in the schedule bucket drift toward their due dates unnoticed and turn into emergencies.
- New items pile up in your inbox because nothing moves them into a bucket.
- You stop trusting the list. Once you suspect it is out of date, you re-read all of it every time you open it, and that is the re-sorting habit you are trying to avoid.
A review is a short, fixed routine that sends every item through the same checks. Its goal is a list you can trust, not a perfect one.
The two loops: daily and weekly
Use two reviews at different scales. The daily review is small and focuses on today. The weekly review is larger and looks at the whole inventory.
| Review | When | Length | Main question | Output |
|---|---|---|---|---|
| Daily | Start or end of the working day | 5 to 10 minutes | What will I do today? | A shortlist that fits capacity |
| Weekly | Same slot each week | 20 to 30 minutes | What changed, and what should leave the list? | A re-bucketed inventory |
Pick fixed times and put them on your calendar. A review that happens "when I get a chance" is the first thing to disappear in a busy week, and a busy week is when you need it most.
The daily review step by step
The daily review should take about as long as a cup of coffee. Run these steps in order.
- Empty the capture points. Move anything from notes, messages, email flags and scraps of paper into the single inventory. Do not decide anything yet. Capture is separate from sorting.
- Re-check dates. Look for tasks whose due date is now within two days. Using the rule from the earlier chapter, these have become urgent, so their bucket may change.
- Bucket the new items. Give each new item a bucket. If you cannot tell whether something is a commitment, treat it as an idea and park it in drop or defer until someone asks for it.
- Choose today's shortlist. Fit tasks to your capacity for the day, not to your hopes.
- Note what you carried over. Anything left from yesterday needs a reason. This feeds the weekly review.
Automating the date check
The date check in step 2 is mechanical, so a script can do it. This reuses the Task class and bucket function from the triage chapter, and it reports which tasks changed bucket after the clock moved forward.
from dataclasses import dataclass
from datetime import date, timedelta
from typing import Optional
@dataclass
class Task:
name: str
due: Optional[date]
important: bool
minutes: int
def bucket(task: Task, today: date) -> str:
urgent = task.due is not None and (task.due - today).days <= 2
if urgent and task.important:
return "do now"
if task.important:
return "schedule"
if urgent:
return "delegate or shrink"
return "drop or defer"
def bucket_changes(tasks, yesterday, today):
changes = []
for t in tasks:
before = bucket(t, yesterday)
after = bucket(t, today)
if before != after:
changes.append((t.name, before, after))
return changes
today = date(2026, 11, 27)
tasks = [
Task("Quarterly report", today + timedelta(days=3), True, 120),
Task("Reply to vendor", today + timedelta(days=3), False, 15),
Task("Plan next year", None, True, 90),
]
for name, before, after in bucket_changes(tasks, today - timedelta(days=1), today):
print(f"{name}: {before} -> {after}")Running this prints:
Quarterly report: schedule -> do now
Reply to vendor: drop or defer -> delegate or shrinkThe quarterly report is due in three days, which is not yet urgent on the day before, so it was in the schedule bucket. Today it is due in three days from today but the check uses (due - today).days <= 2, so look closely at the dates: the report's due date is today + 3, which is 4 days after yesterday and 3 days after today. Neither is within two days, so it would not change bucket.
Here is the corrected version of the sample data. Replace the tasks list with this one.
tasks = [
Task("Quarterly report", today + timedelta(days=2), True, 120),
Task("Reply to vendor", today + timedelta(days=2), False, 15),
Task("Plan next year", None, True, 90),
]With these dates, the script prints:
Quarterly report: schedule -> do now
Reply to vendor: drop or defer -> delegate or shrink"Plan next year" has no due date, so it is never urgent and its bucket never changes by date alone. That is correct, but it is also how undated important work sits untouched for months. The weekly review is the place to catch it.
The weekly review step by step
The weekly review looks at everything, including the buckets you do not work from daily. It answers whether the whole system is still healthy.
- Run the daily review first. Start from a clean inventory.
- Scan each bucket from the bottom up. Start with drop or defer, then delegate or shrink, then schedule, then do now. Starting at the bottom makes it easier to delete, because you are not distracted by the urgent items.
- Remove stale items. Delete anything you have deferred for several reviews in a row with no one asking for it. If it matters, it will come back.
- Check the delegated items. For each task you handed off or shrank, confirm that someone owns it and that the smaller version is actually done.
- Look at the schedule bucket against the calendar. Every scheduled task needs a time slot or a date to be reviewed again. A scheduled task with neither is a wish.
- Renegotiate what will not fit. If next week's commitments exceed your capacity, contact the people involved now, while there is still room to move a date.
- Update your capacity estimate. Compare what you planned with what you finished and adjust the number for next week.
Measuring capacity from your own history
Capacity in the weekly review should come from evidence. Track two numbers each day: the minutes you planned and the minutes of tasks you finished. After a few weeks, the ratio tells you how much to trust your estimates.
def completion_ratio(planned_minutes, finished_minutes):
if not planned_minutes:
raise ValueError("no planned days to compare")
return sum(finished_minutes) / sum(planned_minutes)
def next_capacity(raw_capacity_minutes, ratio):
return int(raw_capacity_minutes * min(ratio, 1.0))
planned = [240, 240, 210, 240, 180]
finished = [150, 200, 120, 190, 150]
ratio = completion_ratio(planned, finished)
print(f"completion ratio: {ratio:.2f}")
print(f"capacity to plan with: {next_capacity(240, ratio)} minutes")This prints a ratio of 0.73 and a planning capacity of 175 minutes. The ratio is capped at 1.0 so a single good week does not push you to plan more than your raw capacity. If the ratio stays below about 0.7 for several weeks, your estimates for individual tasks are probably too low, and the fix is to estimate larger. Cutting the shortlist further treats the symptom.
Handling what you carry over
Carried-over tasks are the clearest signal that something is wrong. Use the number of times a task has been carried over to decide what to do with it.
| Times carried over | Likely cause | Action |
|---|---|---|
| 1 | Normal slippage | Keep it on the shortlist |
| 2 | Estimate too small, or too large to start | Shrink it to a first step of 15 to 30 minutes |
| 3 or more | Blocked, unwanted, or not really a commitment | Find the blocker, renegotiate, or drop it |
Write the reason next to each carry-over. "No time" is not a reason, because everyone has no time. Useful reasons name the cause: waiting on a reply, unclear next step, task too big, or interrupted by urgent work.
Keeping the review short
A review that grows past its time box will be skipped. These habits keep it small.
- Set a timer. When it ends, stop. Whatever you did not reach goes to the top of the next review.
- Decide once per item. Touch each item one time. If you cannot decide, move it to drop or defer with a review date instead of staring at it.
- Use a size limit. Cap the do now and schedule buckets at a number you can actually see, for example 10 items together. When you add an eleventh, something else must move out.
- Skip re-ranking. Within a bucket, order only matters for the shortlist. Do not spend review time deciding the order of tasks you will not touch this week.
Common failures of the review itself
- Review becomes work. If the review includes doing tasks, it expands without limit. During a review, only sort and decide.
- Skipping the weekly review after a bad week. This is the week that most needs it. If you are short on time, run a ten-minute version that only handles the do now and schedule buckets and the renegotiation list.
- Re-sorting everything daily. Daily review only touches new and date-changed items. Reordering the whole inventory every day is the endless re-sorting trap.
- Never deleting. A list that only grows will overflow again. Aim to remove roughly as many items as you add over a month.
- No renegotiation. Reviewing without contacting anyone just shows you the problem. If an item cannot fit, a message to the other person must follow.
Exercise
A task, "Update team handbook", has been on your shortlist for three days in a row and you did not start it on any of them. It is important, has no due date, and takes about 3 hours. Using the carry-over table and the review steps, what should you do at your next weekly review, and why is "try harder tomorrow" a weak answer?
Show answer
It has been carried over three times, so something is blocking it or it is not a real commitment. First check the cause: it is probably too big to start in one sitting, since 3 hours rarely fits in a fragmented day. Shrink it to a first step of 15 to 30 minutes, such as "list the five sections that are out of date", and schedule that step in a specific time slot. If no one needs the handbook by any date and nobody has asked, consider moving it to drop or defer with a review date. "Try harder tomorrow" repeats the plan that already failed three times without changing the cause, so the task will most likely be carried over again.
Exercise
Over a week you planned 200, 240, 220, 240 and 200 minutes and finished 100, 120, 110, 140 and 90 minutes. Your raw capacity is 240 minutes a day. What completion ratio do you get, and what capacity should you plan with next week? What would you check if this ratio stays low for several weeks?
Show answer
Planned total is 1100 minutes and finished total is 560 minutes, so the ratio is 560 / 1100 = about 0.51. Planning capacity is 240 x 0.51, about 122 minutes a day. If the ratio stays this low for several weeks, check whether your task estimates are too small, whether interruptions take a large share of the day so that your raw capacity of 240 minutes is too high, and whether you are carrying over large tasks that should be shrunk. Fix the cause rather than only cutting the shortlist.