Sub topic 8
Reviewing and improving
This chapter assumes you already run pomodoros, plan a day in them, estimate tasks in pomodoros, and record completed pomodoros and interruptions as covered in earlier chapters. Here you will turn that record into better estimates and a better process. You will do this in three steps: compute a few numbers, find the pattern behind them, and change one thing at a time.
Why review at all
A tally of pomodoros tells you what happened. It does not tell you what to change. Review closes the loop: you plan, work, record, compare the plan with the record, and adjust the next plan.
Without review, the same mistakes repeat. If you always estimate three pomodoros for a task that takes five, the log will show it every time, but only if you look. The review is where you look.
Three review horizons
Review at three scales. Each answers a different question and costs a different amount of time.
| Horizon | When | Question | Time |
|---|---|---|---|
| End of day | Last 5 to 10 minutes of the workday | Did I do what I planned, and why not? | 5 to 10 min |
| End of week | Once a week | Are my estimates getting closer? Which interruptions repeat? | 15 to 20 min |
| Process check | Every few weeks | Do the interval lengths and rules still fit my work? | 15 min |
The end-of-day review is small on purpose. If it takes longer than ten minutes, you will skip it. The longer reviews depend on the daily records being accurate, so keep the daily step light and consistent.
What to measure
You do not need many numbers. Four are enough for most people.
- Estimate error per task. Completed pomodoros minus estimated pomodoros. A positive number means you underestimated.
- Estimate ratio. Total completed divided by total estimated. A ratio of 1.0 means your estimates were right on average. A ratio of 1.4 means tasks take about 40 percent longer than you think.
- Interruptions per pomodoro. Internal plus external interruptions, divided by completed pomodoros. This shows how well protected your focus is.
- Void rate. The share of started pomodoros that you abandoned. A pomodoro that is interrupted past the point of recovery is void and does not count. A high void rate points to a planning or environment problem, not a discipline problem.
Computing them from your log
The log from the tracking chapter already holds most of this data. The script below extends it to compute the estimate error, the ratio and the interruption rate. It runs as shown.
log = [
{"task": "write report", "estimated": 3, "done": 4, "internal": 2, "external": 1},
{"task": "review pull request", "estimated": 1, "done": 1, "internal": 0, "external": 0},
{"task": "plan sprint", "estimated": 2, "done": 3, "internal": 1, "external": 3},
{"task": "answer email", "estimated": 1, "done": 1, "internal": 1, "external": 0},
]
total_est = sum(e["estimated"] for e in log)
total_done = sum(e["done"] for e in log)
total_int = sum(e["internal"] + e["external"] for e in log)
print(f"{'task':<22}{'est':>4}{'done':>5}{'error':>6}")
for e in log:
error = e["done"] - e["estimated"]
print(f"{e['task']:<22}{e['estimated']:>4}{e['done']:>5}{error:>+6}")
ratio = total_done / total_est
per_pomodoro = total_int / total_done
print()
print(f"Estimate ratio: {ratio:.2f}")
print(f"Interruptions per pomodoro: {per_pomodoro:.2f}")With this data the output ends with an estimate ratio of 1.44 and 0.89 interruptions per pomodoro. Read that as "my tasks take about 44 percent longer than I plan, and I am interrupted nearly once per pomodoro."
Interpreting estimate error
A single ratio hides structure. Look at the errors task by task and sort them into patterns.
Consistent underestimation
If most errors are positive, your estimates are optimistic. This is the most common pattern. People estimate the work itself and forget setup, switching, and the small tasks that appear partway through.
The fix is a correction factor. If your ratio is stable around 1.4 over a couple of weeks, multiply your raw estimate by 1.4 and round up. A raw estimate of 3 becomes 4. Keep the factor only while the data supports it, and recompute it as your estimates improve.
Errors that depend on task type
Sometimes the average looks fine but the errors cluster. Writing tasks might run over, while review tasks run under. Add a task type to your log and compute the ratio per type. Then correct each type separately.
Large errors on a few tasks
One task that took ten pomodoros against an estimate of two is not a rounding problem. It usually means the task was too large or too vague to estimate. Tasks that can exceed about five to seven pomodoros should be split into smaller tasks before you estimate them. When a task keeps overrunning, check whether it was really several tasks.
Errors in both directions
If errors are positive and negative with no pattern, your estimates are noisy but not biased. A correction factor will not help. Splitting tasks into more uniform sizes will, because it is easier to estimate similar things.
Interpreting interruptions
Interruption data is useful because it separates two different problems.
- Internal interruptions come from you: the urge to check a message, an idea for another task, a sudden thirst. A high internal count suggests the task is unclear or unpleasant, or your workspace has easy distractions within reach.
- External interruptions come from others: a colleague, a call, a notification. A high external count suggests a problem with when and where you work, or with how you handle requests.
Compare the two columns in your log. In the sample data above, the "plan sprint" task has 3 external interruptions and 1 internal one. That points at the environment, not at your attention.
Then look for repeating causes. Add a short note when you record an interruption, such as "chat" or "colleague asked a question". After a week, count the notes. The most common cause is the one to address first.
| Pattern in the log | Likely cause | Change to try |
|---|---|---|
| Many internal interruptions, mostly "new idea" | No quick place to capture ideas | Keep a "later" list within reach and write the idea down |
| Many internal interruptions, mostly "check messages" | Notifications are visible | Close the chat app or silence notifications during a pomodoro |
| Many external interruptions at the same time of day | Your busiest period overlaps with others' needs | Move focused work to a quieter part of the day |
| Many external interruptions from one source | People do not know when you are available | Tell them your focus blocks and when you will respond |
| Many voided pomodoros | Tasks too large, or on-call duties | Plan fewer pomodoros and leave buffer |
Change one thing at a time
The temptation after a review is to change everything. Resist it. If you change the timer length, move your focus hours and close your chat app in the same week, you will not know which change helped.
Use a simple routine.
- Pick the single biggest problem from your review.
- Write one change as a testable statement, for example "Chat stays closed during pomodoros, and I check it in the breaks."
- Run it for a full week, or at least five working days.
- Compare the same metric before and after.
- Keep the change if the metric improved. Drop it if not, and try the next idea.
A week is a reasonable minimum because a single day has too much variation. A meeting-heavy Tuesday and a quiet Thursday are not comparable.
A worked review
Suppose you finish a week and compute these numbers.
- Total estimated: 28 pomodoros. Total completed: 38. Ratio: 1.36.
- Interruptions per pomodoro: 1.1. About two thirds are external.
- Void rate: 4 of 42 started, about 10 percent.
Step one: pick the problem. The estimate ratio is high, but the interruption rate is the likely cause of part of it. Each interruption costs time, and a void pomodoro has to be redone. These numbers feed each other.
Step two: choose one change. Most external interruptions came between 10:00 and 12:00, when your team is most active. You move your hardest task to 08:00 to 09:30 and tell your team you are available for questions at 09:30.
Step three: set the test. Next week, compare the interruptions per pomodoro and the void rate for the early-morning pomodoros against the rest.
Step four: leave the correction factor for later. Once interruptions fall, the ratio will likely fall too, so recomputing the factor in two weeks is more accurate than applying 1.36 now.
This example shows the order that works well. Fix the process problem first, then recalibrate the estimates on cleaner data.
Common mistakes in review
- Skipping the daily review. The weekly numbers depend on daily records. If you skip days, the weekly summary is incomplete and misleading.
- Reviewing without recording interruption causes. A count tells you how often. Only the note tells you why.
- Treating one bad day as a trend. Wait for several days of data before changing anything.
- Using the ratio to punish yourself. An estimate ratio above 1.0 is information about the task and the environment. It is not a verdict on you.
- Correcting estimates without splitting large tasks. A factor applied to a vague seven-pomodoro task still gives a poor estimate.
- Changing several things at once. You lose the ability to tell what worked.
Summary of the working model
Record, compute, interpret, change one thing, then measure again. The daily review is brief and keeps the log honest. The weekly review turns the log into four numbers and a decision. The periodic process check asks whether the technique itself, including its interval lengths, still fits your work. That last question leads into the next chapter.
Exercise
Your log for a week shows 20 pomodoros estimated and 30 completed. Interruptions total 24, of which 20 are external, and most of those come from one colleague who asks quick questions throughout the morning. What is your estimate ratio, what is the interruptions-per-pomodoro figure, and what single change would you test first?
Show answer
The estimate ratio is 30 / 20 = 1.5, so tasks take about 50 percent longer than planned. Interruptions per pomodoro is 24 / 30 = 0.8. The external interruptions come from one source, so test one change: tell that colleague your focus blocks and when you will answer questions, for example in the breaks or at a fixed time. Run it for a week and compare interruptions per pomodoro. Leave the correction factor of 1.5 until the interruptions drop, then recompute it.
Exercise
You complete a task in 9 pomodoros that you estimated at 2. Should you add a correction factor to all your future estimates because of it? Explain what you would do instead.
Show answer
No. One large error is not a consistent bias, and a factor built from it would inflate every other estimate. The task was probably too large or too vague to estimate. Split it into smaller tasks of a few pomodoros each, and add a note on why the original estimate was wrong. Compute a correction factor only if most tasks over several days show the same direction of error.
Exercise
A learner changes the work interval to 40 minutes, moves focus work to the early morning, and closes the chat app, all in the same week. Their interruptions drop by half. What is wrong with drawing a conclusion about the interval length?
Show answer
Three changes were made at once, so the drop cannot be attributed to any one of them. Closing the chat app and moving to a quieter time of day both plausibly reduce interruptions without any help from the interval length. To test the interval, change only that, keep the other conditions steady for a week, and compare the same metric before and after.