Sub topic 4
Planning your day in pomodoros
This chapter assumes you know the basic cycle from earlier in the tutorial: a 25-minute work interval, a 5-minute break, and a longer break after four pomodoros. You should also be comfortable keeping a to-do list. Here you will turn a list of tasks into a day plan measured in pomodoros. You will also learn how to size that plan so it survives contact with a real workday.
Why plan in pomodoros at all
A normal to-do list says what you want to do but not how much of your day it will take. Ten items can look equal on paper when one is a five-minute reply and another is half a day of work. When the list doesn't say how big each item is, you tend to start the day with more than you can finish. You then end the day with a vague sense of failure.
Planning in pomodoros fixes that by giving every task a size in the same unit as your available time. A pomodoro is a fixed 25 minutes of focus. If you can realistically complete about eight pomodoros today, the plan is a budget problem: the estimates on your list must add up to roughly eight or fewer.
Planning this way gives you three things:
- A capacity limit. You see before you start whether the plan fits.
- A forced ordering. Choosing what fits means choosing what matters most.
- A comparison point. At the end of the day you can compare planned and actual pomodoros. Later chapters on tracking and review rely on this.
The three planning artifacts
The classic technique uses three simple records. You can keep them on paper, in a text file, or in an app. What matters is their roles, not the medium.
| Artifact | Purpose | How often you touch it |
|---|---|---|
| Activity Inventory | A running list of everything you might need to do, with no commitment to a date | Add to it at any time. Review it at the start of each day |
| To Do Today | The tasks you commit to for this one day, with estimates | Written each morning. Updated during the day |
| Records | The results: pomodoros completed, interruptions, notes | Updated after each pomodoro and at the end of the day |
The Activity Inventory is a capture tool. It lets you write down a task the moment you think of it and then stop thinking about it. The To Do Today list is the actual commitment. The Records are covered in a later chapter. This chapter focuses on moving work from the inventory to today's list.
How the pieces connect
Step 1: Pick candidates from the inventory
Start each day, ideally before you open email or chat, by scanning the inventory. Choose tasks using ordinary priority criteria:
- Deadlines that fall today or soon.
- Work other people are waiting on.
- Work that moves a larger goal forward, even if nobody is asking for it.
Do not pick everything that feels urgent. Pick a first-draft list, then let the capacity check in step 4 cut it down.
Step 2: Right-size each task
A pomodoro is a unit of work, so a task should be a sensible number of units. Two rules of thumb come from the original technique:
- Split large tasks. If a task would take more than about five to seven pomodoros, it is too vague or too big to plan as one item. Break it into parts that each take a few pomodoros and have a visible result.
- Combine small tasks. If a task takes much less than one pomodoro, group it with similar small tasks. A single pomodoro can hold "reply to three emails, book a meeting room, submit an expense form".
The exact thresholds are guidelines. What matters is that no plan item is so big that you can't tell whether you are making progress, or so small that it wastes a whole interval.
Splitting well
A good split produces parts with a clear finish line. Compare these two ways to split "refactor billing module":
| Poor split | Better split |
|---|---|
| Refactor part 1 | Write tests that capture current invoice behaviour |
| Refactor part 2 | Extract tax calculation into its own function |
| Refactor part 3 | Replace duplicated rounding code and rerun tests |
The poor split only numbers the work. You can't tell when "part 1" is done. The better split names an outcome for each part, so you know when a pomodoro has achieved something.
Combining well
When you group small tasks, keep them in the same kind of work. A batch of administrative chores works as one pomodoro. A batch made of "fix a bug, call the bank, outline a presentation" does not, because switching between very different kinds of work eats into the 25 minutes.
Step 3: Estimate in pomodoros
Give each task a whole number of pomodoros. Estimating is its own skill with its own chapter, so only the planning-relevant points are covered here:
- Use whole numbers. A task estimated at "1.5 pomodoros" is a 2.
- Estimate the work you do inside the interval, not the elapsed calendar time. Meetings and breaks are not pomodoros.
- Expect your first estimates to be off. That is normal, and the Records you keep are what make later estimates better.
Write the estimate next to the task name on your To Do Today list, for example Write report (4).
Step 4: Check against capacity
Now add up the estimates and compare them with how many pomodoros you can realistically complete today.
Capacity is not "hours in the workday divided by 25 minutes". A work day contains meetings, messages, meals, and shallow tasks that don't belong in a pomodoro. To find your capacity:
- List the fixed commitments for today: meetings, appointments, calls.
- Subtract them from your working hours.
- Divide what remains by about 30 minutes (25 for work plus 5 for the break). Round down.
- Then reduce the result further, because the day will include unplanned work.
For many people doing knowledge work, the result is a handful of pomodoros per day, often somewhere around six to ten. Treat that as a starting point, not a target. Your own Records will give you a better number after a couple of weeks.
If your total is over capacity, remove tasks until it fits. Do it deliberately: move the lowest-priority tasks back to the inventory, not into a pile of guilt. A deferred task is not a failed task. It is a task you chose not to promise today.
Step 5: Order and commit
Write the final To Do Today list. A few ordering heuristics help:
- Put the hardest, most thinking-heavy task in the first pomodoros, when your attention is typically freshest. If your best hours are different, use them instead.
- Spread similar tasks together to avoid costly switching.
- Leave your final one or two pomodoros lighter, or empty, as buffer for overruns and urgent requests.
- Keep the list visible. A list you can see helps you decline new requests politely.
Add a section at the bottom of the sheet for unplanned and urgent items. These are tasks that appear during the day and can't wait. Writing them in a separate section keeps them from silently replacing planned work, and it lets you count them in your review. Handling the interruptions themselves is covered in the next chapter.
A worked example in code
The script below mirrors the planning steps. It takes an inventory with estimates, puts urgent items first, flags tasks too big to schedule, and fills today's capacity. Anything that does not fit is deferred. This is a planning aid, not a replacement for judgement. It shows the logic that you apply by hand.
from dataclasses import dataclass
POMODORO_MIN = 25
MAX_TASK_POMODOROS = 5 # anything larger must be split first
@dataclass
class Task:
name: str
estimate: int # in pomodoros
urgent: bool = False
def plan_day(inventory, capacity):
today, deferred, to_split = [], [], []
used = 0
# sorted() is stable, so urgent tasks come first and
# the original order is kept within each group.
for task in sorted(inventory, key=lambda t: not t.urgent):
if task.estimate > MAX_TASK_POMODOROS:
to_split.append(task)
elif used + task.estimate <= capacity:
today.append(task)
used += task.estimate
else:
deferred.append(task)
return today, deferred, to_split, used
def show(title, tasks):
print(title)
for t in tasks:
print(f" {t.estimate} x {t.name}")
if __name__ == "__main__":
inventory = [
Task("refactor billing module", 8),
Task("write report", 4, urgent=True),
Task("review pull request", 1),
Task("answer email batch", 1),
Task("update docs", 3),
Task("plan sprint", 2),
]
capacity = 8
today, deferred, to_split, used = plan_day(inventory, capacity)
show(
f"Today ({used} of {capacity} pomodoros, "
f"about {used * POMODORO_MIN} min of focus):",
today,
)
show("Deferred:", deferred)
show("Split before scheduling:", to_split)Running it prints:
Today (8 of 8 pomodoros, about 200 min of focus):
4 x write report
1 x review pull request
1 x answer email batch
2 x plan sprint
Deferred:
3 x update docs
Split before scheduling:
8 x refactor billing moduleNotice what the logic does with "update docs". After the first three tasks, 6 pomodoros are used. The 3-pomodoro task would bring the total to 9, which is over capacity, so it is deferred. The smaller "plan sprint" task still fits, so it is scheduled. A purely sequential plan would have stopped at the first task that didn't fit. This version keeps looking, which is often what you want, though you should check that the result still matches your priorities.
Notice too that the code planned all 8 pomodoros. By the advice above, you would likely lower capacity to leave some slack.
Common planning errors
| Error | What it looks like | Fix |
|---|---|---|
| Overcommitting | Ten pomodoros of tasks on a day with four meetings | Calculate capacity from fixed commitments first, then cut tasks |
| Vague tasks | An item like "work on project" | Rewrite it with a concrete outcome and split it |
| Planning only one big task | A single 7-pomodoro item with no checkpoints | Break it into parts with visible results |
| No buffer | Every slot filled | Reserve the last pomodoro or two for overruns |
| Treating the plan as fixed | Ignoring a real emergency to stick to the list | Re-plan deliberately: move something to the inventory, don't just add |
| Never reviewing | Same capacity guess for months | Compare planned versus done in your Records each week |
When the plan changes mid-day
Plans change. The technique does not ask you to defend the list at all costs, but it does ask you to change it on purpose. When something genuinely important arrives:
- Finish or deliberately stop the current pomodoro. Don't abandon it midway out of reflex.
- Add the new item to the unplanned and urgent section, with an estimate.
- Check the new total against your remaining capacity.
- Move something out of today's list if needed, and put it back in the inventory.
This keeps the plan honest. At the end of the day you can see exactly what displaced what, and that information makes tomorrow's plan better.
Checking your understanding
Exercise
You have six hours of working time today. Two meetings take 90 minutes in total. Using a rough figure of 30 minutes per pomodoro including the break, how many pomodoros fit before you allow for slack? Then, if you decide to keep two pomodoros free for overruns and urgent work, how many do you plan?
Show answer
Six hours is 360 minutes. Subtract 90 minutes of meetings to get 270 minutes. Divide by 30 to get 9 pomodoros of raw capacity. Keeping two free leaves 7 pomodoros to plan.
Exercise
Your inventory contains "prepare the quarterly presentation", which you estimate at 12 pomodoros. Describe how you would handle it when planning a day.
Show answer
Twelve pomodoros is well over the five to seven pomodoro guideline, and the title does not describe a visible outcome. Split it into parts that each have a clear result, such as outlining the story, gathering the data, drafting the slides, and rehearsing. Estimate each part separately, and schedule only the parts that fit today's capacity. Leave the rest in the inventory.
Exercise
In the planning script, what changes if you remove the sorted(...) call and loop over inventory directly, and why might that be a problem?
Show answer
Tasks would be considered in the order they were written in the inventory instead of urgent tasks first. If a large non-urgent task appears early, it could use up capacity, so an urgent task that comes later might be deferred even though it should have priority.