What Lean Means by Value and Waste
Prerequisites
This chapter assumes you understand how a process turns inputs into outputs. You should be comfortable reading simple time and quantity figures. Some exposure to a workplace process in manufacturing, services, or software is helpful but not required.
What Lean Means by Value and Waste
In Lean, value is anything a customer is willing to pay for. A product feature, a finished report, or a correct invoice all count as value. Waste, called muda in Japanese, is any activity that uses resources without adding that value.
Lean sorts activities into three groups:
- Value-added: The customer pays for it, and it changes the product or service correctly the first time.
- Necessary non-value-added: The customer does not pay for it, but a law, a safety rule, or the current design requires it. A safety inspection is an example.
- Pure waste: It adds no value and is not required. Remove it.
Muda, Mura, and Muri: Three Faces of Waste
Lean names three related problems:
- Muda is waste itself: extra steps, waiting, and defects.
- Mura is unevenness. Work arrives in bursts, so some days overload people and other days leave them idle.
- Muri is overburden. People or machines are pushed beyond safe or sustainable limits.
Mura often causes muri, and muri often causes muda. For example, a rush week (mura) can lead staff to skip checks, which creates defects (muda).
TIMWOODS: The Eight Wastes at a Glance
TIMWOODS is a memory aid for eight kinds of waste:
| Letter | Waste | Example |
|---|---|---|
| T | Transportation | Moving parts between distant buildings |
| I | Inventory | Stock sitting unsold |
| M | Motion | Walking across a site to fetch a tool |
| W | Waiting | Staff idle until an approval arrives |
| O | Overproduction | Printing 500 forms when 50 are needed |
| O | Over-processing | Formatting a report beyond what the reader needs |
| D | Defects | Reworking an order entered incorrectly |
| S | Skills | Ideas from staff that nobody asks for |
The next two sections cover the first two wastes in detail.
Transportation: Moving Things That Do Not Need to Move
Transportation waste is moving materials, documents, or data more than the work requires. Each move adds risk of damage, delay, and handling errors. A useful question is whether the item could be produced or used where it already is.
Inventory: Stock and Work Waiting to Be Used
Inventory waste is anything stored that nobody needs yet. Raw materials, half-finished work, and emails in an approval queue all take up space and hide problems. Long queues also increase lead time, which is the total elapsed time from a request to its delivery.
Exercise
A clerk prints every incoming email, stacks the paper on a desk, and files it weeks later. Which two wastes apply, and why?
Show answer
Inventory and over-processing. The paper stack is stored work that nobody needs yet, so it is inventory. Printing adds effort the reader does not value, so it is over-processing.